If a false statement of material fact is made by one of the contracting parties, the misled party will have remedies for:

Options:

A.

Indemnity

B.

Misrepresentation

C.

Recission

D.

Damages

Buy Now
Questions 5

Blakenall District Hospital (BDH) is a large hospital that is a major part of the government’s health service. Purchasing staff are in the habit of placing many long-term contracts with suppliers and sub-contractors. Whilst these contracts are usually carried out successfully, prices are often paid that are well over budget. The purchasing manager is concerned to find that, in some cases, members of staff are forcing suppliers to accept fixed price contracts. The policy hascaused several problems such as some suppliers refusing to deal with BDH and a few going out of business mid-way through performing a contract with BDH. This is due to fluctuating market prices of materials. The procurement manager suggests supplier to adopt variable pricing arrangement with price index. Is this a right course of action?

Options:

A.

No, variable pricing would only benefit the suppliers

B.

Yes, this type of arrangement would provide absolute certainty when budgeting

C.

Yes, this pricing arrangement would reimburse the fluctuation of material prices

D.

No, price adjustment should be applied to short-term supply contract only (3-month duration or less)

Buy Now
Questions 6

Which of the following is a benefit to the buyer of using model form contracts?

Options:

A.

The terms used are advantageous to the buyer

B.

It reduces time and costs in developing a formal contract

C.

No legal advice is required as variations are not accepted

D.

Most suppliers are unfamiliar with the terms used

Buy Now
Questions 7

Esther Francis has recently changed job from a supply role at Shine Cleaning Services (SCS) to a purchasing role at Southern Commercial Property (SCP). Esther requires industry technical input to develop a cleaning services requirements specification for her new employer. Esther Francis wants to include her former employer SCS in a market engagement exercise to inform the specification. Which of the following would be the most appropriate way to deal with the conflict of interest?

Options:

A.

Conduct the market engagement with SCS off the record

B.

Declare the potential conflict of interest to a senior manager of SCS

C.

Ask a colleague to conduct the market engagement with SCS

D.

Conduct market engagement with several capable suppliers, including SCS

Buy Now
Questions 8

Which of the following is an example of liquidated damages clause?

1. "In the event of a delay to the Offshore Installation Completion Date as per the Contract Schedule for which Contractor is solely responsible, Contractor shall pay to Company 0.25% per day of delay, subject to a maximum of 10% of the Initial Contract Price."

2. “If Seller breaches its obligation to deliver goods in accordance with the schedule provided for in this contract, Seller shall pay Buyer $x per day for each day of delay"

3. "The Contractor shall defend and hold the Buyer, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with the performance of this Agreement, except for injuries and damages caused by the sole negligence of the Buyer."

4. "The contract is subjected to delay remedies. The amount will be agreed by both parties during the delivery"

Options:

A.

2 and 4 only

B.

1 and 3 only

C.

3 and 4 only

D.

1 and 2 only

Buy Now
Questions 9

Which of the following is most likely to reduce ITT preparation time while maintaining the clarity of tendering documents?

Options:

A.

Using request for quotation

B.

Standardising documentation whenever possible

C.

Monitoring usage

D.

Eliminating pre-qualification stage from all tendering processes

Buy Now
Questions 10

ABC Ltd is a UK based company. It plans to enter into a contract with XYZ Ltd which is based in Singapore. Which of the following are the mandatory elements for the contract between ABC Ltd and XYZ Ltd to be legally binding? Select THREE that apply.

Options:

A.

All parties must have capacity to contract

B.

The two parties must have intention to be bound

C.

The invitation to tender must be sent by the agreed deadline

D.

There must be an offer and an acceptance

E.

An amount of money must be paid upfront

F.

There must be an invitation to treat

Buy Now
Questions 11

RL Corporation are developing a specification for a new piece of equipment. They have no prior experience of procuring the item. The procurement manager wants to understand the benefits and risks of conducting market dialogue to help inform the procurement strategy. Which of the following are three potential advantages of market dialogue? Select THREE that apply.

Options:

A.

There is no need to conduct a full procurement process

B.

More collaborative supplier relationships can be developed

C.

Organisations can clarify and optimise the requirements

D.

The procurement process becomes significantly quicker

E.

Purchasers can gauge market interest and competition

F.

Market dialogue is risk-free as there is no contract or agreement

Buy Now
Questions 12

Which of the following is the reason why liquidated damage clauses are embedded into a contract?

Options:

A.

Because liquidated damages are the only remedy

B.

To penalise the supplier for their wrongdoing

C.

To avoid argument on correct measure of damage

D.

Because compensation will be awarded immediately

Buy Now
Questions 13

SFO procurement manager sent a request for quotation to Vogon International in which he determined the contract terms and specification. In SFO's standard terms and conditions, it is stated that 'Goods shall be delivered and Services performed by the applicable Delivery Date. Supplier must notify Buyer 3 days prior to the Delivery Date if Supplier is likely to be unable to meet a Delivery Date.'

Vogon replied with a quotation without any amendment to SFO's terms & conditions. The SFO procurement manager found the prices were reasonable and submitted to senior management. Senior management team accepted that quotation and sent a notification to Vogon. On the Delivery Date, Vogon said they had no capacity to supply the product as the quotation due to a workers' strike. Did Vogon breach any agreement with SFO?

Options:

A.

No, because Vogon had no intention to be bound by the quotation, therefore, it didn’t constitute a contract

B.

No, because the strike is a force majeur event, so Vogon did not breach any contract with SFO

C.

Yes, because the contract was formed since Vogon had sent the quotation as an acceptance to SFO’s offer

D.

Yes, because the contract had been formed between SFO and Vogon with the quotation as an offer and the notification as an acceptance

Buy Now
Questions 14

Solus Trading has begun a project to improve the level of delivery performance from its suppliers. They need to develop a key performance indicator (KPI) to measure the performance improvement. Which KPI would be suitable to use?

Options:

A.

Percentage of on-time in full

B.

Percentage of rejects and returns

C.

Percentage of cost reduction

D.

Percentage of customer complaints

Buy Now
Questions 15

A senior buyer is preparing specification for the next purchase. He intends to embed social and environmental criteria that align with his organisation's overarching strategy. Which of the following provides the social and environmental objectives that an organisation pursues?

Options:

A.

Economic performance

B.

Procurement Systems and Technology

C.

Economy of scale

D.

Organisation’s CSR policies

Buy Now
Questions 16

Infra Constructions receive a contract for construction of a building, and following terms were agreed upon. "The entire cost of the project will be reimbursed to Infra Constructions (estimated cost of the project being $ 25 million). The profits will be 20% of the entire cost of a project subject to a max of $ 5 million." This arrangement is an example of...?

Options:

A.

Incentive pricing arrangement

B.

Gain-share/pain-share arrangment

C.

Cost-plus pricing arrangement

D.

Fixed-pricing arrangement

Buy Now
Questions 17

A procurement professional is drafting payment terms for a commercial contract. He is considering about payment method if defective products are found. Which of the following should be embedded in payment terms to control this issue?

Options:

A.

Remedies for late payment

B.

Pay-less notice

C.

Invoice preparation

D.

Retention clause

Buy Now
Questions 18

When a contract has been agreed on the basis of a fraudulent misrepresentation, which of the following remedies are available?

Options:

A.

Damages only

B.

Rescission only

C.

An injunction only

D.

Both damages and rescission

Buy Now
Questions 19

Consequences and actions that arise from certain KPI scores must be...? Select TWO that apply.

Options:

A.

Mutually agreed

B.

Deliberately omitted

C.

Documented

D.

Unilaterally imposed by the purchaser

E.

Terminated

Buy Now
Questions 20

Which of the following are express terms?

Sale by description

Fitness for purpose

Passing of risk

Passing of title

Options:

A.

1 and 2 only

B.

2 and 3 only

C.

2 and 4 only

D.

3 and 4 only

Buy Now
Questions 21

The pricing arrangement in which markup is added into cost base to calculate the final price is known as...?

Options:

A.

Fixed Price approach

B.

Market based approach

C.

Price indices

D.

Cost plus pricing

Buy Now
Questions 22

A school has a contract for the supply of fruit for break time. The school needs the fruit delivered by 10am every morning to be served at 10:30am. How would this best be covered in a commercial agreement?

Options:

A.

Note on each purchase order

B.

Pricing schedule

C.

Sales of Goods Act 1974

D.

Contractual term

Buy Now
Questions 23

Which of the following are NOT covered by CISG? Select TWO that apply:

Options:

A.

Transfer of risks

B.

Contract validity

C.

Remedies for breach of contracts

D.

Liability of the seller for death or personal injury

E.

Liability to pay damages

Buy Now
Questions 24

Information assurance protects information systems and...?

Options:

A.

Hard copy

B.

Computers

C.

Inventory

D.

People

Buy Now
Questions 25

Which of the following is most likely to be an one-off contract?

Options:

A.

Franchise Agreement

B.

Framework Agreement for supply of mono-crystalline silicon

C.

Contract for construction of a power plant

D.

Commercial lease agreement of an office building

Buy Now
Questions 26

Which of the following regulates barriers to the trade of goods between Member States of WTO?

Options:

A.

NAFTA

B.

GATT

C.

CISG

D.

TRIPS

Buy Now
Questions 27

A buyer and a supplier plan to sign a contract with cost-plus arrangement. If the cost base is $350 and the markup component is 11% then the invoice price will be...

Options:

A.

393.26

B.

388.5

C.

368.5

D.

362

Buy Now
Questions 28

Which of the following sections would typically be included in a specification for services? Select THREE that apply.

Options:

A.

A description of the service requirements

B.

The tender evaluation methodology

C.

The fault rectification timeframes

D.

The service start and end dates

E.

The terms and conditions of the contract

F.

Questions relating to methods

Buy Now
Questions 29

Maria is working on a new one-off construction project and is looking to expand a factory. A requisition comes through for an outright purchase of a digger. Maria changes this to a lease order instead. Is she right to do so?

Options:

A.

No, buyers should not challenge or change a requisition

B.

Yes, this saves money and the business will not end up with an unwanted asset

C.

No, diggers are not allowed to be leased

D.

Yes, equipment should always be leased and never purchased

Buy Now
Questions 30

Which of the following is the procedure that makes no further competition under a framework agreement?

Options:

A.

Closed system

B.

Direct call-off

C.

Standing offer

D.

Blanket order

Buy Now
Questions 31

Which of the following are most likely to be liabilities of suppliers under a guarantee clause?(SelectAny Two)

Options:

A.

TWO that apply

B.

Repair

C.

Decommissioning

D.

Upgrading

E.

Replacement

F.

Installation

Buy Now
Questions 32

Which of the following can be considered as implied terms in a contract?

1. Case law

2. Statute

3. Trade custom

4. A term can never be implied, it must always be expressed by the parties

Options:

A.

1,3 and 4 only

B.

1, 2 and 3 only

C.

1, 2 and 4 only

D.

2, 3 and 4 only

Buy Now
Questions 33

A Key Performance Indicator (KPI) states "Measure the effort exerted by the project team to control costs throughout the contract duration.” Is this KPI appropriate for measuring the management of contract costs?

Options:

A.

Yes, increased efforts to control costs ensure that costs will be managed effectively

B.

No, the metric is not sufficiently specific and measurable

C.

No, the project team is not responsible for managing costs

D.

Yes, the KPI is achievable, relevant and time-bound

Buy Now
Questions 34

Standard terms and conditions should become the governing terms for which group of items?

Options:

A.

Leverage items

B.

Bottleneck items

C.

Strategic items

D.

Routine items

Buy Now
Questions 35

A company needs to source a product from oversea. It wants to overcome technical barrier to cross-border trade by using standards in the specification. Which of the following is most likely to be incorporated into that specification?

Options:

A.

National standards

B.

Company standards

C.

Brands

D.

International standards

Buy Now
Questions 36

You are to do the KPIs and targets for international supplier and the following was done

1. Delivery in an hour

2. Return orders in an hour

Is that a good thing or not?

Options:

A.

Yes, because these targets will propel the suppliers to continuous improvement

B.

No, the local suppliers are always the best choice

C.

No, because the KPIs are not a realistic and justified

D.

Yes, the higher the targets are, the better the outcomes will be

Buy Now
Questions 37

EAC Facilities Management is planning for a new construction project in the suburban area. They decide to use NEC or FIDIC model form of contract for this project. Is this a right course of action?

Options:

A.

Yes, these forms aim at balanced risk/reward allocation between the parties

B.

No, the buyer will bear all the risks derived from the contract

C.

Yes, using these forms will eliminate all the risks

D.

No, the contractor won't understand the legal terminology in the contract forms

Buy Now
Questions 38

The cost in cost reimbursable contract is...?

Options:

A.

Actual cost

B.

Variable cost

C.

Fixed cost

D.

Profit

Buy Now
Questions 39

Which of the following would be considered as advantages of an industry model form contract?

It provides greater flexibility for negotiation

It reduces the cost of contract development

It is usually designed to be fair to both parties

It removes the need for the buyer to understand it

Options:

A.

1 and 2 only

B.

2 and 4 only

C.

1 and 3 only

D.

2 and 3 only

Buy Now
Questions 40

In which of the following conditions, request for quotation produces the best results?

Options:

A.

With an ambiguous specification

B.

Under framework agreements

C.

Under a complex process

D.

With strategic items

Buy Now
Questions 41

A procurement manager is preparing a long-term contract with a major supplier. She decides to use the variable pricing arrangement using price indices. The payment terms describe the circumstances and mechanism where the price is allowed to change. In order to successfully manage this type of contract, the buying organisation should have...?

Options:

A.

Good market knowledge

B.

Selection of base year

C.

Value for money

D.

Economy of scale

Buy Now
Questions 42

Which of the following are always included within a framework agreement? Select TWO that apply:

Options:

A.

Exact quantity to be purchased

B.

Call-off procedure

C.

Exact price to be paid

D.

Duration

E.

Insurance

Buy Now
Questions 43

As part of a long-term contract, a buyer may wish to use separate service level agreements (SLAs). If the targets are not met, which of the following options would compensate the purchaser?

Options:

A.

Service guarantees

B.

Service credits

C.

Service standards

D.

Service schedules

Buy Now
Questions 44

A procurement officer decides to approach the supply market regarding a procurement activity that will specify the use of technology that is very new to the market. The procurement officer is taking this step before the formal tender process is started. Is this approach permitted?

Options:

A.

Yes, but only as part of early market engagement and with no commitment of contracts

B.

No, it is time consuming and can delay tenders unnecessarily

C.

Yes, it is a good way to understand who will have the highest prices and start negotiations

D.

No, all suppliers must wait for the invitation to Tender (ITT) to be released

Buy Now
Questions 45

Which of the following statement is true about insurance?

Options:

A.

An insurance policy can be mechanism of substance to back up indemnity

B.

The supplier must always pay the insurance premium for goods-in-transit

C.

An insurance policy transfers the legal liabilities from the insured to the insurer

D.

Professional indemnity insurance provides the insured business with financial protection against the liabilities caused by or arising out of the products supplied

Buy Now
Questions 46

Which of the following is the best definition of consideration in contract law?

Options:

A.

Full statement about something to provide

B.

The act of thinking carefully about one thing

C.

One thing given in exchange

D.

Formal discussion between people who are trying to reach an agreement

Buy Now
Questions 47

Danielle buys a car from Aaron. Not long after, she receives an proposal from Brian, who isinterested in buying the car but his budget is very constraint. Then, Brian decides to sign a hire purchase agreement with Danielle which lasts 4 years. Brian lives very far from Danielle, so hehires Charlie to deliver the car to his place. During the transport, Charlie has an accident and the car is written off. At the time of accident, who has the title of the car?

Options:

A.

Charlie

B.

Aaron

C.

Brian

D.

Danielle

Buy Now
Questions 48

Which of the following are most likely to be substantive elements of the specification of a truck? Select TWO that apply:

Options:

A.

Guarantee

B.

Foreword

C.

Expected lifespan

D.

Ethics

E.

Abbreviation

Buy Now
Questions 49

To expand its operation, Steel Co. decides to build a new plant. Despite of excitement, the senior management is very concerned about the complexity and risks of such project. Hugo, the procurement manager, suggests that the company can adopt a model form of contract. What is the advantage of using model form of contract?

Options:

A.

It shifts the balance of power in the favour of the buyer rather than the contractor

B.

The company could avoid the need to draft a complex contract from blank

C.

Model form of contract eliminates the need for legal advice totally

D.

The company does not need to draft the drawings as well as specification anymore

Buy Now
Questions 50

Which of the following is the type of insurance that cover the liabilities of service provider such as legal advice, accountancy, technical designs, etc?

Options:

A.

PII

B.

Product liability

C.

Employer’s liability

D.

Public liability

Buy Now
Questions 51

Which of the following is a disadvantage of using input specifications?

Options:

A.

It is difficult to assess suitability of each quotation

B.

It requires a more proactive approach to monitoring

C.

There is less opportunity for innovation

D.

There is no limit to the number of suppliers who can quote

Buy Now
Questions 52

A category buyer is purchasing medical gases for a hospital, but is experiencing volatile and unfavourable market conditions due to multiple global external factors. Owing to the volatility, the hospital's finance director has tasked the buyer with providing certainty of costs for the next 18 months. Which of the following pricing methods will enable budgeting certainty, despite the highly volatile market conditions?

Options:

A.

A fixed pricing arrangement

B.

A cost plus award fee agreement

C.

Fixed pricing with economic price adjustments

D.

A penetration pricing strategy

Buy Now
Questions 53

Prior to circulating the service specification to a tendering supplier, it is good practice for the purchasing organisation to request completion of a non-disclosure agreement. Is this statement correct?

Options:

A.

No, because the non-disclosure agreement has no legal standing

B.

Yes, because the non-disclosure agreement protects intellectual property

C.

Yes, because the non-disclosure agreement encourages transparent bidding

D.

No, because the non-disclosure agreement only applies after contracting

Buy Now
Questions 54

Which of the following are key features of standard terms and conditions? Select TWO that apply

Options:

A.

Standard terms always comply with implied terms

B.

Specific to each purchase order

C.

Non-disclosure

D.

Non-negotiable

E.

Designed to be used in repetitive transactions

Buy Now
Questions 55

Which of the following are driving forces for increasing use of social and environmental criteria in specifications? Select TWO that apply.,

Options:

A.

Process efficiencies

B.

Stakeholder pressure

C.

Insufficient financial resources

D.

Scarcity of environmentally sustainable suppliers

E.

Carbon footprint measure

Buy Now
Questions 56

Since services are intangible, so KPIs for services must be qualitative in all circumstances. Is this statement correct?

Options:

A.

No, KPIs for services must always be quantitative so that they can be measured easily

B.

No, some KPIs for services are measurable by means of outcome, time and space performed

C.

Yes, quantitative KPIs are limited to timeliness of supply of goods, defective rates and in-full quantities, which are applied to monitor supplier of physical goods

D.

Yes, the only measure mattered to supply of services is end-users' satisfaction

Buy Now
Questions 57

Electro Systems PLC is a public sector manufacturer of highly technical solutions for the telecommunications industry. The market in which it operates is fast-paced and ever-changing because of the latest inventions and developments. The products it procures are high-cost and can be subject to lengthy lead times. Michael Jones, the procurement director, believes that establishing framework agreements would be beneficial to the tendering process. How could this assist them?

Options:

A.

Improve supplier lead times

B.

Enable the use of mini-competitions

C.

Improve supplier product quality

D.

Enable the use of e-tendering

Buy Now
Questions 58

A manufacturing company signed a contract with a raw material supplier. The contract includes a clause on liquidated damages in case of late delivery. Purchaser was obliged to pay after 30 days from delivery. Eventually raw material was delivered 1 week later than initial plan due to supplier’s slow production process. There is no defect in the delivered batch. Which of the following can be claimed by the manufacturing company?

Options:

A.

Rights to refunds or repairs

B.

Right of set-off

C.

Right of third party

D.

Right of extending payment

Buy Now
Exam Code: L4M3
Exam Name: Commercial Contracting
Last Update: Jul 12, 2025
Questions: 196

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now L4M3 testing engine

PDF (Q&A)

$31.5  $104.99
buy now L4M3 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 12 Jul 2025