What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?

Options:

A.

2 QSFP cables / 3 Mellanox cards / 20 DFMDs

B.

3 QSFP cables / 4 Mellanox cards / 10 DFMDs

C.

4 QSFP cables / 2 Mellanox cards / 20 DFMDs

Buy Now
Questions 5

An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS).

What action should the Implementation Engineer perform?

Options:

A.

Refer to the “Recommended DFS Versions for Purity Releases” KB and upgrade Purity on the FlashArray and DFS.

B.

Install the Array and DFS with the Purity that shipped and have Support upgrade remotely.

C.

Only upgrade the Purity on the FlashArray and then attach the DFS.

Buy Now
Questions 6

What upgrade scenario required an upgrade of power supplies?

Options:

A.

X10 > X50

B.

X50 > X70

C.

X50R2 > X50R3

Buy Now
Questions 7

For FlashArray//XL, which PCIe card slot is reserved for control upgrades?

Options:

A.

5

B.

6

C.

7

Buy Now
Questions 8

When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?

Options:

A.

0

B.

2

C.

3

Buy Now
Questions 9

A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?

Options:

A.

2 x C13/14

B.

4 x C13/14

C.

4 x C19/20

Buy Now
Questions 10

A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?

Options:

A.

Create a bootable USB stick from the 6.1.21 ISO file and reimage both controllers with it.

B.

Copy the PPKG and SHA1 files to a USB stick and upgrade the controllers.

C.

Configure the array with the current code and then open a case with Support to upgrade.

Buy Now
Questions 11

When transforming an array from SAS to NVMe with the Evergeen XFORM upgrade, when should a swing shelf be installed?

Options:

A.

When the chassis is populated with two data packs

B.

When there is insufficient free space to evac capacity.

C.

When the array is half populated with Flash Modules

Buy Now
Questions 12

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers.

Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Buy Now
Questions 13

A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?

Options:

A.

Purity must be upgraded to 6.x

B.

The array chassis must be fully populated with modules.

C.

The array usage percentage must be lower than 60%

Buy Now
Questions 14

Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?

Options:

A.

purealert tag --cancel

B.

purealert untag --maintenance

C.

purealert --unset

Buy Now
Questions 15

When should a FlashArray support case be opened?

Options:

A.

Once an issue arises

B.

Once install is completed

C.

Before starting install

Buy Now
Questions 16

What command can be used to identify interface status?

Options:

A.

purenetwork list

B.

purenetwork list --all

C.

purenetwork list --eth

Buy Now
Questions 17

A data pack has been installed and the puredrive list command shows the drives in “unadmitted” status. Which command should be used to complete the admission?

Options:

A.

puredrive add

B.

puredrive admit

C.

purearray drive admit

Buy Now
Questions 18

Before installing array rails, where should the cage nuts be placed?

Options:

A.

Lowest square of lowest RU

B.

Lowest square of top RU

C.

Top square of the lowest RU

Buy Now
Questions 19

Before leaving the site after an install, who is required to provide completion sign-off?

Options:

A.

Account team

B.

Customer

C.

Support

Buy Now
Questions 20

What command will view NVRAM install and update status?

Options:

A.

purearray list

B.

puredrive list

C.

purehw list --all

Buy Now
Questions 21

A customer has purchased a DirectFlash Shelf, but lacks available space in the same rack as the chassis. There is available space in a rack 6m away. What step should be taken prior to implementation?

Options:

A.

Make space in the rack where the chassis is located.

B.

Order 7m DirectFlash Shelf cables.

C.

Relocate the chassis to the rack where there is space for the shelf.

Buy Now
Questions 22

If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?

Options:

A.

Email the account team

B.

Update and close the case.

C.

Verify that Remote Assist (RA) is open and update the case.

Buy Now
Exam Name: Pure Certified FlashArray Implementation Specialist (FAIS) Exam
Last Update: Jun 10, 2025
Questions: 75

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now FlashArray-Implementation-Specialist testing engine

PDF (Q&A)

$31.5  $104.99
buy now FlashArray-Implementation-Specialist pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 16 Jun 2025