What requirement shall be included in a lockout/tagout procedure?

Options:

A.

An arc flash requirement where a high level of exposure is foreseen

B.

A power testing requirement where a direct exposure situation can be detected

C.

A voltage testing requirement where there might be direct exposure to electrical hazards

D.

A voltage and current testing for direct exposure situations

Buy Now
Questions 5

The insulation requirement referred to in NEMA ICS 1 defines clearance as the shortest distance:

Options:

A.

between the ground plane and the neutral conductor.

B.

over the surface of an insulating material between two conducting parts.

C.

measured through air between two conducting parts.

D.

a person can approach a live conductor without initiating a hazardous arcing incident.

Buy Now
Questions 6

In a Class I hazardous area, what is the maximum distance from an enclosure, containing arcing devices should a conduit seal be located?

Options:

A.

4 inches 10.16 cm away from the closest union or coupling

B.

10 inches 25.4 cm

C.

12 inches 30.48 cm

D.

18 inches 45.72 cm

Buy Now
Questions 7

According to API 541, when shall the vendor provide calculated data from the final witness testing?

Options:

A.

Two weeks following testing

B.

Upon request

C.

At time of final shipment

D.

Immediately upon completion of testing

Buy Now
Questions 8

According to NFPA 70, installed conductor insulation temperature rating shall be a required marking on what type of system?

Options:

A.

Metallic busways

B.

Nonmetallic auxiliary gutters

C.

Sheet metallic auxiliary gutters

D.

Non-metallic busways

Buy Now
Questions 9

According to API 541, subsequent to completion of manufacture and testing, the vendor shall revise and resubmit the previously supplied purchase data including all the following except:

Options:

A.

rotor-balance report.

B.

operating manual.

C.

as-built data sheet.

D.

shop test data.

Buy Now
Questions 10

Metallic shielding components such as tapes, wires, or braids shall be connected to a:

Options:

A.

equipment grounding busbar.

B.

low voltage ceramic insulator.

C.

low voltage connector.

D.

center tap of a transformer.

Buy Now
Questions 11

What is the purpose of an equipment risk assessment in the source inspection process?

Options:

A.

To identify the level of risk associated with failure of the supplier/vendor’s quality system

B.

To identify the level of effort for source inspection activities during the manufacture/fabrication phase of a project at the supplier/vendor facility

C.

To identify which shops will be able to bid on certain types of equipment i.e. to identify the shops that can supply equipment critical to project success

D.

To determine the level of business insurance required in the event the supplier/vendor is unable to deliver the product on time while meeting contractual agreements

Buy Now
Questions 12

The evaluation of a component for compliance with product specification and data sheet is known as:

Options:

A.

standardization.

B.

inspection.

C.

validation.

D.

documentation.

Buy Now
Questions 13

According to NFPA 70, abrasion protection shall be applied to what component where it passes through metal?

Options:

A.

Conductor insulation

B.

Rigid conduit

C.

Secondary circuits

D.

Semi-rigid conduit

Buy Now
Questions 14

What is an insulation resistance test?

Options:

A.

A test that determines the adequacy of electrical insulation for the normally occurring over voltage transient

B.

A test that determines the corrosive contaminants around the conductors, terminal spacing problems, and tolerance errors in cables

C.

A spot overvoltage test which uses an applied DC voltage to measure ohms

D.

A test that determines the voltage that electrical insulation can withstand during normal operation

Buy Now
Questions 15

Deviations from specifications must be approved by the:

Options:

A.

manufacturer's engineer.

B.

vendor's quality manager.

C.

inspection coordinator.

D.

responsible engineer.

Buy Now
Questions 16

According to API 541, determination of efficiency and power, locked-rotor current, power factor, torque, full-load current and slip are some of the tests verified when performing a:

Options:

A.

complete test.

B.

compliance test.

C.

design test.

D.

routine test.

Buy Now
Questions 17

The Arc Flash PPE is required for:

Options:

A.

work on control circuits with exposed electrical conductors below 120 VAC.

B.

removal of covers on properly installed wireways, junction boxes, and cable trays.

C.

voltage-testing in ac systems with work on energized conductors.

D.

insulated cable examination with no manipulation of cable.

Buy Now
Questions 18

According to ANSI/IEEE C37.20.2, wiring across a hinge shall be all of the following except:

Options:

A.

sufficiently flexible to withstand repeated door movement without sustaining damage to wire strands or insulation.

B.

installed in a flexible non-metallic conduit with a separate ground terminated at the door and at the switchgear ground bus and chosen per the minimum wire size table.

C.

a formed loop as it crosses the hinge and secured to the equipment at both ends in such a manner that negligible strain is transmitted to wire beyond the securements.

D.

No. 14 AWG and larger, and C or D stranding.

Buy Now
Questions 19

Which of the following is identified in the guide as a key MCC design item?

Options:

A.

Ground bus

B.

Transformer conservator

C.

Buchholz relay

D.

Tap changer handle

Buy Now
Questions 20

Which switchgear-related item is explicitly identified in the guide table of contents as an inspection topic?

Options:

A.

Cable tray color coding

B.

Metering

C.

Turbine nozzle alignment

D.

Firewater pump casing hardness

Buy Now
Questions 21

According to ANSI C57.12, the average winding temperature rise above ambient temperature shall not exceed what value?

Options:

A.

65°C

B.

70°C

C.

80°C

D.

90°C

Buy Now
Questions 22

Which enclosure type is defined in the guide as a construction where free exchange of air is prevented between the inside and outside of the motor?

Options:

A.

Open drip proof

B.

TEFC

C.

WP-II

D.

Purged pressurized

Buy Now
Questions 23

What electronic instrument is used for measuring electrical potential difference between two points in an electric circuit?

Options:

A.

Amp meter

B.

Wheatstone bridge

C.

Voltmeter

D.

Potentiometer

Buy Now
Questions 24

During transformer inspection, the source inspector should verify that alarm, control, and trip settings on temperature and level indicators are:

Options:

A.

omitted unless requested by operations

B.

identical for every transformer rating

C.

as specified

D.

determined only by the freight forwarder

Buy Now
Questions 25

Which information should be included at a minimum in a source inspection report?

Options:

A.

Inspector’s travel reimbursement total

B.

Reference drawings/data used, including drawing numbers

C.

Supplier profit margin

D.

Internal purchaser budget code only

Buy Now
Questions 26

According to IEEE C57.12.00, a durable, metal, name plate shall be affixed to each transformer by the:

Options:

A.

manufacturer.

B.

owner.

C.

purchaser.

D.

QA/QC Inspector.

Buy Now
Questions 27

Which referenced standard in the guide applies to metal-enclosed low-voltage power circuit breaker switchgear?

Options:

A.

ANSI/IEEE C57.12.00

B.

ANSI/IEEE C37.20.1

C.

API RP 14FZ

D.

NEMA 250 only

Buy Now
Questions 28

As part of a purchase order, what type of documents typically supplement industry standards?

Options:

A.

Supplier Quality Standards

B.

Manufacturing Standards

C.

Material Test Reports

D.

Client Standards

Buy Now
Questions 29

What is the purpose of an insulation resistance reading?

Options:

A.

To evaluate the insulation and condition of the grounding

B.

To determine the resistance of the conductors

C.

To evaluate the condition of the insulation between conductors and ground

D.

To determine if the conductors are properly terminated

Buy Now
Questions 30

A source inspection coordinator is determining whether an item should receive resident inspection rather than final inspection only. Which factor is MOST directly relevant?

Options:

A.

Color of enclosure paint

B.

Probability and consequence of failure

C.

Number of supplier sales offices

D.

Whether the item is stored indoors

Buy Now
Questions 31

The insulation resistance test uses what type of applied voltage?

Options:

A.

AC

B.

DC

C.

Half-wave pulsating

D.

Full-wave rectified

Buy Now
Questions 32

Why should the dates for source inspection scheduled work process events such as the pre-inspection meeting, key inspection events and anticipated shipping date be identified in advance?

Options:

A.

To allow coordination with other project members involved in the activity

B.

To ensure that all dates will meet the project schedule and quality requirements

C.

To provide a sound basis for inspection and test planning for each shop

D.

To be able to assign inspectors to the shops in order not to conflict with other projects

Buy Now
Questions 33

What standard defines the maximum number of conductors permitted in outlets, devices and junction boxes, and conduit bodies?

Options:

A.

NFPA 70

B.

IEEE 112

C.

IEC 60079 series

D.

NEMA 250

Buy Now
Exam Code: API-SIEE
Exam Name: Source Inspector Electrical Equipment
Last Update: Mar 20, 2026
Questions: 110

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now API-SIEE testing engine

PDF (Q&A)

$31.5  $104.99
buy now API-SIEE pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 21 Mar 2026