Question # 4

Job plan's responsibility can be assigned to a supervisor, crew, lead, and owner. Which statement is true regarding a work order that results from a job plan?

A.

The values for supervisor, crew. lead, and owner from the job plan always carry over to the work order regardless of the values for supervisor, crew, lead, and owner defined on the preventive maintenance record.

B.

If the values for supervisor, crew, lead, and owner on the preventive maintenance record are different compared to those on the job plan, the values on the preventive maintenance record take the place of those on the job plan when copied to the work order.

C.

If the values for lead and owner are different on the preventive maintenance record compared to those on the job plan, the values on the preventive maintenance record take the place of those on the job plan when copied to the work order. Values for supervisor and crew come from the job plan.

D.

If the values for lead and owner are different on the preventive maintenance record compared to those on the job plan, the values on the job plan take the place of those on the preventive maintenance record when copied to the work order. Values for supervisor and crew come from the preventive maintenance record.

Full Access
Question # 5

When updating or modifying a Service Request the work log can be edited and viewed. Which field is mandatory in the Work Log tab of the Service Request application?

A.

Type

B.

Class

C.

Record

D.

Summary

Full Access
Question # 6

When installing IBM Maximo Asset Management V7.5 without using the middleware installer to install IBM WebSphere Application Server, which step must be taken for a successful installation?

A.

The JMS connection factory must be created in a special, separate cell connected to an IBM DB2 data store to provide a way for server failures to be recovered.

B.

The WebSphere Application Server must be configured to allow for remote execution and access traffic in order for the installer to successful^ obtain the trust.p12 file using a remote file copy method.

C.

JMS data stores must be created using a database (with a supported vendor: IBM, Oracle, or Microsoft) in order to allow the manual configuration of the JMS resources to be successfully completed.

D.

The trust.p12 keystore file must be copied from the WebSphere Application Server's deployment manager profile>/etc directory to a suitable location and be provided as an input to the installation program

Full Access
Question # 7

What are examples of stock categories in IBM Maximo Asset Management V7.5?

A.

Stock. Non-Stock. Reorder

B.

Stock. Non-Stock, Direct Issue

C.

Stock. Non-Stock. Special Order

D.

Direct Issue. Reorder. Special Order

Full Access
Question # 8

Which application associates different types of contracts for the same vendor?

A.

Master Contract

B.

Purchase Contract

C.

Labor Rate Contract

D.

Lease/Rental Contract

Full Access
Question # 9

Which statement is true about master Preventive Maintenance (PM) records?

A.

a master PM record does not generate associated PMs

B.

a master PM record generates work orders like any other PMs

C.

associated PM records can be created from master PM records

D.

associations cannot be made between existing PM records and a master PM record

Full Access
Question # 10

Which two contract types can be associated to Assets? (Choose two.)

A.

Labor

B.

Master

C.

Warranty

D.

Purchase

E.

Lease/Rental

Full Access
Question # 11

What does the Live Refresh action item update?

A.

the security changes in the running Maximo Application Server

B.

the database configuration changes in the running Maximo Application Server

C.

the changed value of a logging setting in the running Maximo Application Server

D.

the changed value of a Maximo property in the running Maximo Application Server

Full Access
Question # 12

What do relationship rules specify?

A.

The relationship between assets

B.

Groups of rules that apply to an asset

C.

The relationship between classifications

D.

Groups of rules that apply to a relationship

Full Access
Question # 13

When utilizing a route, the Child Work Orders option is specified. What logic does IBM Maximo Asset Management V7.5 use to assign a description to the generated child work orders?

A.

If the route record has a description, it becomes the child work order description.

B.

If the route stop has no description and it refers to an asset, the work order description is the asset description.

C.

If the route stop references a job plan, the work order description is a concatenation of the job plan identifier and the job plan description.

D.

If the route stop has no description and it refers to a location, the work order description is a concatenation of the location identifier and location description

Full Access
Question # 14

What is the main purpose of the Job Plan Sequence tab in the Preventive Maintenance (PM) application?

A.

To assign a sequential list of PM job plans which allows for scheduling different levels of maintenance work

B.

To schedule a sequence of PM records during specified times of the year including active PM days, weeks, or months

C.

To schedule criteria for sequencing work order generation from PM records in which PMs can be scheduled time-based or meter-based

D.

To generate a group sequence of PM work orders for an asset or location hierarchy which allows for organizing job plans for inspections and large projects

Full Access
Question # 15

A failure class can be associated to which two Maximo entities? (Choose two.)

A.

Meters

B.

Assets

C.

Routes

D.

Locations

E.

Preventive Maintenance

Full Access
Question # 16

For what purpose is the Activities and Tasks application used?

A.

To plan, review, and manage activities and tasks

B.

To create and manage job plans, activities, and tasks

C.

To plan and manage preventive maintenance, activities, and tasks

D.

To create, plan, and manage preventive maintenance, activities, and tasks

Full Access
Question # 17

Which statement is true about scheduling an escalation in IBM Maximo Asset Management V7.5 (Maximo)?

A.

Maximo performs escalations every hour.

B.

Maximo performs escalations on time intervals.

C.

Maximo monitors the database when scheduled.

D.

Maximo performs the escalation action when scheduled.

Full Access
Question # 18

Which three statements are true regarding returning assets to a vendor? (Choose three.)

A.

Rotating assets cannot be returned to a vendor.

B.

A direct issue item can be returned if it is moved.

C.

A direct issue item cannot be returned if it is moved.

D.

Assets must be returned from the receiving storeroom.

E.

An asset's inventory cost must equal the reversing line cost.

F.

An asset's inventory cost must not equal the reversing line cost.

Full Access
Question # 19

Which data is required to apply an Item Assembly Structure (IAS) to an operating location in the Locations applications?

A.

Meter Group

B.

Failure Class

C.

Rotating Item

D.

Non-rotating Item

Full Access
Question # 20

Which IBM Maximo Asset Management V7.5 application can view labor that applies to specific requirements, or view work order requirements that fit the craft, skill level, vendor, contract, calendar availability, or shift of displayed labor?

A.

Job Plans

B.

Quick Reporting

C.

Assignment Manager

D.

Preventive Maintenance

Full Access
Question # 21

What is the purpose of the Inventory Usage application?

A.

To list all inventory tool items within a storeroom

B.

To list all inventory service items within a storeroom

C.

To track the issue, transfer, and reuse of inventory items within and across sites

D.

To track the issue, transfer, and return of inventory items within and across organizations

Full Access
Question # 22

What is the purpose of a connecting line in a workflow process?

A.

To change the status of a node

B.

To branch to a workflow process

C.

To move from one node to another

D.

To identify who a workflow assignment will route to

Full Access
Question # 23

When creating a purchase request line by using the Select Spare Parts button, refined search is allowed by specifying at least one of which two data fields? (Choose two.)

A.

Site ID

B.

Description

C.

Item Number

D.

Asset Number

E.

Organization ID

Full Access
Question # 24

Which two items are required to approve a purchase contract? (Choose two.)

A.

A vendor

B.

An authorized site

C.

A total cost greater than zero

D.

At least one contract line item

E.

Association to at least one commodity code

Full Access
Question # 25

When adding an item to a storeroom, which two fields must be entered? (Choose two.)

A.

Unit Cost

B.

Issue Unit

C.

Order Unit

D.

Current Balance

E.

Issue Cost Type

Full Access
Question # 26

What comprises a failure code?

A.

Failure, affect, fix

B.

Issue, reason, resolution

C.

Problem, cause, remedy

D.

Situation, impact, solution

Full Access
Question # 27

What is required to create an escalation?

A.

Site

B.

Schedule

C.

Condition

D.

Description

Full Access
Question # 28

Which statement is true to review the content of a scheduled report?

A.

Use the Report Administration application to view and select from a list of report outputs

B.

Use the Report Administration application to choose the correct report and then click the View button

C.

Use the URL from the link supplied in the e-mail to access a PDF file served up directly by the HTTP server

D.

Access the URL from the link supplied in the e-mail and then log into Maximo and select the Download Content button

Full Access
Question # 29

A reservation is created when a work order is approved with item(s) on the Work Order Plans Materials sub-tab. Which action controls when an item must be specified with a hard reservation?

A.

Change the reservation type on the materials line to HARD

B.

Change the reservation type on the reservation list to HARD

C.

Set the reservation type to HARD within the Organization > Inventory Options

D.

Set the flag on this check box within the Inventory application: Requires hard reservation on use?

Full Access
Question # 30

A work order is generated from a route and each stop on the route has a unique job plan and safety plan. Which option should be selected for: When this Route is Applied to a Work Order, the Route Stops will Become?

A.

Child Work Orders

B.

Work Order Tasks

C.

Sequenced Job Plans

D.

Entries in the Work Order's Multi Asset, Location, and CI Table

Full Access
Question # 31

Where are IBM Maximo Asset Management V7.5 properties changed?

A.

Logging.properties file

B.

Mxserver.properties file

C.

System Properties application

D.

Application Properties application

Full Access
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 26 Sep 2022