You are the business analyst for your organization. You are currently working with Steve on the organize requirements process. You and Steve have elected to use the user stories approach for this process. What is the user stories approach for requirements organization?

Options:

A.

Stakeholders' objectives are described to identify the requirements that the solution will need to support.

B.

Stakeholders are interviewed and their stories are recorded as part of the requirements.

C.

Stakeholders are interviewed and their experiences are recorded to help identify the requirements.

D.

Stakeholders' experiences equate to the stakeholder requirements.

Buy Now
Questions 5

As a business analyst, you should work to identify opportunities to improve the operations of your organization. Which one of the following improvement opportunities aims to improve the experience of the customer?

Options:

A.

Eliminate redundancy.

B.

Automate or simplify the work people perform.

C.

Increase consistency of behavior.

D.

Improve the purchasing process.

Buy Now
Questions 6

As a business analyst, you'll need to recognize the methods that are appropriate for recording and documenting the results of elicitation activities. Which one of the following cannot be considered as a valid method for documenting elicitation?

Options:

A.

Whiteboards

B.

Audio recordings

C.

Voice mails

D.

Written documentation describing the outcome of the event

Buy Now
Questions 7

A newly implemented personal loan financing system has been in operation for one month. The business objective is to reduce the loan processing time from 11 days to 3 days but it is currently occurring in 4.5 days. What must the business analyst (BA) do next?

Options:

A.

Validate the performance measure

B.

Analyze the current state

C.

Assess the risks

D.

Determine requirements changes

Buy Now
Questions 8

Henry and Fred are working together on business analysis duties for the implementation of new software. Henry, the business analyst, tells Fred that they should take the current measurement of productivity, and then measure again after the solution has been implemented. This benchmarking approach will allow Henry and Fred to see the real effect of the solution on the business need. What term is assigned to this measurement?

Options:

A.

Post implementation factor

B.

Yield

C.

Key performance indicators

D.

S-Curve

Buy Now
Questions 9

Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

Options:

A.

Get the requirements removed from the project scope.

B.

Change the prioritization of the requirements based on overstated complexity of the project work.

C.

Change the prioritization of the requirements based on the past project.

D.

Have the business analyst report the difficulty of the project work to the project customer.

Buy Now
Questions 10

A business analyst needs to prepare the requirements package for her endeavor in a predefined template for her company. What term can be assigned to this standardized template for packaging the requirements?

Options:

A.

Organizational process assets

B.

Derivative adaption

C.

Essential

D.

Enterprise environmental factors

Buy Now
Questions 11

A deployed loan product was funded with the expectation of prepayment risk reduction. Initially key performance indicators would be to take similar loan prepayment rates over the previous 10-year period and compare it with the new product. After implementation, the business analyst (BA) determines that the decade old housing market is vastly different. Which of the following should the BA consider for validity of performance measures?

Options:

A.

Currency

B.

Timing

C.

Sample size

D.

Frequency

Buy Now
Questions 12

What is problem tracking?

Options:

A.

It's the identification of missing requirements.

B.

It's the assumption that there will be defects in the requirements that must be resolved.

C.

It's the documentation of known defects in the requirements.

D.

It's the identification and management of any issues for resolution.

Buy Now
Questions 13

A business analyst (BA) is modelling requirements to assist the stakeholders in visualizing the appearance and capabilities of a planned solution. What technique is the BA using?

Options:

A.

User stories

B.

Root cause analysis

C.

Prototyping

D.

Data flow diagrams

Buy Now
Questions 14

A business analyst (BA) is assigned a new project and is beginning to prepare for elicitation. Which task must the BA complete before preparation of the elicitation process can begin?

Options:

A.

Coordinate meeting logistics

B.

Approve anticipated expenses

C.

Gather contact information of stakeholder

D.

Collect information on the business need

Buy Now
Questions 15

Which of the following is the best definition of the business rules analysis?

Options:

A.

To define the historical information that is available for the business analyst to rely on for his research.

B.

To define the rules that govern decisions in and organization and that define, constrain, or enable organizational policies.

C.

To define the people that govern decisions in and organization and that define, constrain, or enable organizational policies.

D.

To define the job functions, roles and responsibilities, and the designation of power among the project stakeholders.

Buy Now
Questions 16

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Create a process model

B.

Develop a work breakdown structure

C.

Build an entity-relationship diagram

D.

Construct a decision tree

Buy Now
Questions 17

You are the business analyst for your organization. Management has asked you to create a plan that will define the proposed structure and schedule for communicating the business analysis activities to the appropriate stakeholders. What plan does management want you to create?

Options:

A.

Stakeholder Management Plan

B.

Business Analysis Plan

C.

Communications management plan

D.

Business Analysis Communications Plan

Buy Now
Questions 18

Which approach is used to focus on minimizing up-front uncertainty?

Options:

A.

Class-driven approach

B.

Change driven approach

C.

Solution-driven approach

D.

Plan-driven approach

Buy Now
Questions 19

A business analyst (BA) is defining constraints for a project. Which of the following is a valid constraint?

Options:

A.

“The solution must be implemented in six (6) months.”

B.

“The solution must increase sales by 20%.”

C.

“The solution must promote workplace safety.”

D.

“The solution must reduce support calls by 20%.”

Buy Now
Questions 20

Which one of the following statements best describes the purpose of allocating requirements?

Options:

A.

Optimize efficiency and link to productivity.

B.

Limit the risk exposure.

C.

Maximize the business value.

D.

Increase productivity through efficiency.

Buy Now
Questions 21

Which one of the following statements best describes requirements prioritization?

Options:

A.

It is only used with the plan-driven approach to business analysis.

B.

It is only used with the change-driven approach to business analysis.

C.

It determines how requirements will be prioritized based on the most important stakeholders to the least important stakeholders.

D.

It determines how requirements will be prioritized and how those priorities will be used to define the solution scope.

Buy Now
Questions 22

When a business analyst completes the elicitation process, she will create four outputs. Which one of the following is an output of the elicitation process?

Options:

A.

Requirements management plan

B.

Resource identification

C.

Stakeholder Concerns

D.

Solution scope

Buy Now
Questions 23

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which one of the following is a primary input to the business analysis approach?

Options:

A.

The business analysis approach will be shaped by the problem or opportunity faced by the organization.

B.

The business analysis approach will be shaped by the penalty of not seizing the opportunity.

C.

The business analysis approach will be shaped by the time allowed for business analysis planning.

D.

The business analysis approach will be shaped by the risks faced by the organization.

Buy Now
Questions 24

A business analyst (BA) held a formal walk through of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?

Options:

A.

Ensure appropriate templates used throughout elicitation

B.

Ensure consistent referencing of requirements

C.

Ensure compliance with key performance indicators

D.

Ensure correct terminology is used

Buy Now
Questions 25

You are the business analyst for your organization and you're working with your manager to discuss the constraints and assumptions that may affect the requirements. Your manager wants to know from where you've derived the list of constraints and assumptions. What's the best answer as to where assumptions and constraints are identified?

Options:

A.

Assumptions and constraints are identified through a review of project requirements.

B.

Assumptions and constraints are identified through elicitation from stakeholders.

C.

Assumptions and constraints are identified through risk identification and analysis.

D.

Assumptions and constraints are identified through document analysis.

Buy Now
Questions 26

What do business goals and objectives of enterprise analysis actually describe?

Options:

A.

Business goals and objectives describe the increased revenue that the organization is seeking to gain.

B.

Business goals and objectives describe the solution scope that the organization is seeking to accomplish.

C.

Business goals and objectives describe the ends that the organization is seeking to achieve.

D.

Business goals and objectives describe the desired future state of problems.

Buy Now
Questions 27

Stakeholder requirements where approved for a business process reengineering initiative along with the Creation of a | roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

Options:

A.

Requirement performance measures

B.

Scope model

C.

Requirement description

D.

Requirement attribute values

Buy Now
Questions 28

Ben is the business analyst for his organization. Ben is currently working on a solution to improve a laser printer. He has taken the laser printer apart, identified each component, and documented each component's purpose. What type of requirements organization is Ben doing in this scenario?

Options:

A.

Functional decomposition

B.

Process modeling

C.

Scope modeling

D.

Data modeling

Buy Now
Questions 29

A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?

Options:

A.

The trade-off and value to stakeholder

B.

The strategy alignment with the balanced scorecard

C.

The total cost of ownership of the project

D.

The strategy design options

Buy Now
Questions 30

An organization has selected a solution for a business need and the business analyst has elected to use the time boxing/budgeting technique for requirements prioritization. What is the time boxing/budgeting technique?

Options:

A.

It's a method to prioritize requirements based on a pre-determined budget and/or a pre-determined deadline.

B.

It's used when there are conflicting requirements that must be resolved quickly and cost efficiently.

C.

It's a method to rank requirements in different boxes based on time, cost, risk, and need.

D.

It's used to determine which requirements can be implemented fastest and for the least amount of cost.

Buy Now
Questions 31

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap.

Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

  • Requirement attribute values

  • Requirement description

  • Requirement performance measures

Options:

A.

Scope model

Buy Now
Questions 32

A software development company has a strict policy of evaluating solutions against the number of defects reported in the testing phase. This practice helps the company stay competitive and deliver better solutions. What performance measure is being practiced?

Options:

A.

Predictive

B.

Quantitative

C.

Adaptive

D.

Qualitative

Buy Now
Questions 33

A business. analyst (BA) is working on a project to implement a commercial off-the-shelf application for tracking customers. In an observation session with a Domain subject matter expert (SMF). the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Reduction of duplicate tasks performed by staff

B.

Potential to provide future value supported by the system

C.

Ability to provide greater amount of information to staff

D.

Automation to increase consistency of behavior

Buy Now
Questions 34

Stakeholders must be able to determine the audit and approval history of requirements and designs. Which of the following provides a means to document traceability and change?

Options:

A.

Risk analysis and management

B.

legal and regulatory information

C.

Requirements management tools

D.

Acceptance and evaluation criteria

Buy Now
Questions 35

The business analyst (BA) has structured information so it is easy to find, does not conflict with other information, and is not duplicated unnecessarily. Which additional factor does the BA need to take into account when deciding how to structure the information?

Options:

A.

The level of experience with the repository tool

B.

The number of stakeholders to be consulted

C.

The size and complexity of the change

D.

The governance and engagement approach to be used

Buy Now
Questions 36

The following chart represents attendance of subject matter experts (SME) and the solution owner for a requirements review and approval meeting held weekly by a business analyst (BA).

CCBA Question 36

The requirements package was approved by the solution owner during the May 30 meeting. After implementation of the solution, the BA learns that the users in SME-3 s area are not using the system. Which business analysis activity should the BA have monitored more closely to mitigate this situation?

Options:

A.

Business processes

B.

Requirements scope

C.

Solution performance

D.

Stakeholder engagement

Buy Now
Questions 37

You are the business analyst for your organization and you're preparing to elicit requirements from the stakeholders. You've gathered several inputs to help with the elicitation process. Which input(s) will be used to ensure that you understand the type of information that should be elicited from the stakeholders?

Options:

A.

Stakeholder list

B.

Risk assessment

C.

Business need

D.

Roles and responsibility

Buy Now
Questions 38

A business analyst (BA) is working on a project that has a number of stakeholder conflicts and issues. The BA is finding it difficult to resolve the conflicts and issues effectively. What should the BA do to prevent a similar situation in the future?

Options:

A.

Plan business analysis governance

B.

Verify requirements

C.

Perform stakeholder analysis

D.

Validate requirements

Buy Now
Questions 39

System designers are working with a business analyst (BA) during the initial stages of a project to implement a new transaction-based system. The system designers would like to have a visual that illustrates the type of information that will be input in the system, the processes it will support, and the location where it will be stored. What type of diagram meets the designers' needs?

Options:

A.

Use Case

B.

Data flow

C.

Activity flow

D.

State Modelling

Buy Now
Questions 40

A business analyst (BA) is logging the end user concerns and resolves these on a priority basis as mandated by the government. This project is a simple application, with no major strategic or financial impact to the organization. The BA strongly enforced end-to-end requirement traceability for this project. Why would the BA recommend this traceability approach?

Options:

A.

Regulatory requirements

B.

Costs and benefits

C.

Organizational standards

D.

Complexity of the domain

Buy Now
Questions 41

The Chief Information Officer (CIO) of a large financial services firm with many technology applications was formally reviewing all ongoing projects and noticed that the requirements were complex and difficult to follow. The CIO asks the business analyst (6A) what would improve the stakeholder's ability to understand the requirements. Which of the following will improve the requirements quality?

Options:

A.

Traceability matrices

B.

IEEE /ISO 29148 requirements standards

C.

Additional requirements attributes

D.

Matrix documentation formats

Buy Now
Questions 42

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

Options:

A.

are ether qualitative or quantitative measurements, but not both.

B.

align to industry benchmarks gathered for similar solution implementations.

C.

are written in the correct format. using the agreed standards and terminology.

D.

align with other measures within the broader context of the solution.

Buy Now
Questions 43

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

Options:

A.

Confirm elicitation results

B.

Gain agreement on commitments

C.

Monitor stakeholder engagement

D.

Plan stakeholder engagement

Buy Now
Questions 44

For a new account payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

Options:

A.

“The solution will send payment notification to the account holder after successful processing

B.

“The solution will report the average number of days an account payment is outstanding”

C.

“The solution will reduce the payment processing time from three days to two days”

D.

“The solution will enable account holders to make account payments via a web form”

Buy Now
Questions 45

An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?

Options:

A.

Goals and objectives

B.

Organizational culture

C.

Risks and assumptions

D.

Business needs

Buy Now
Questions 46

A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?

Options:

A.

Compare requirements with compliance requirements

B.

Determine the communication plan for requirements

C.

Reassure the project sponsor that testing will be conducted diligently

D.

Ensure requirements are traceable up to user acceptance testing

Buy Now
Questions 47

A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous. What will the BA be looking for?

Options:

A.

That there are no relationships that link elements two different and conflicting

B.

That relationship is described in the same way, using the same set of standards

C.

That there is a genuine relationship and that the type of the relationship is described

D.

That the relationship is necessary for understanding the requirements holistically

Buy Now
Questions 48

A business analyst (BA) has elicited non-functional information for a system's replacement. In reviewing the elicitation results, the BA finds the number of concurrent users is a large portion of the target user group, which seems high. How should the BA proceed?

Options:

A.

Observe a user performing the task to determine the length of time to complete the task

B.

Document the elicitation results in the solution requirements specification then seek verification and validation in a requirements review

C.

Conduct additional stakeholder analysis to determine whether any additional user groups were overlooked

D.

Confirm elicitation results by researching the actual concurrent users on the existing system and review findings with stakeholders

Buy Now
Questions 49

A project is initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?

Options:

A.

Conduct an impact analysis

B.

Estimate the scope of work

C.

Resolve differences of opinion

D.

Perform a feasibility study

Buy Now
Questions 50

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you

need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Which of the following statements is true regarding the plan business analysis approach?

Options:

A.

The plan business analysis approach describes the amount of budget needed for the requirements elicitation.

B.

The plan business analysis approach is required to select an approach that will perform business analysis.

C.

The plan business analysis approach describes the processes the business analyst will or will not do, based on the time and budget available.

D.

The plan business analysis approach describes the amount of time needed for the business analysis approach.

Buy Now
Questions 51

When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the forward tracing activity called in requirements traceability?

Options:

A.

Lineage tracking

B.

Backwards pass

C.

Derivation

D.

Allocation

Buy Now
Questions 52

There are three inputs in the plan business analysis approach. Which one of the following is not one of the three inputs?

Options:

A.

Organizational process assets

B.

Expert judgment

C.

Risk and rewards analysis

D.

Business need

Buy Now
Questions 53

Management in your organization wants you to create a graphical model to show the business logic of the requirements. What other term are graphical models known as?

Options:

A.

Flowcharts

B.

Mind maps

C.

Influence diagram

D.

Diagrams

Buy Now
Questions 54

A project to replace a financial system uses a waterfall methodology. Initially, meetings with the project subject

matter experts (SMEs) were positive. As the project progressed through the requirements and design phases, the SMEs attended fewer meetings, resulting in a delay to the project build phase. What should the business analyst (BA) have done to prevent the delay?

Options:

A.

Selected a different project methodology

B.

Requested new SMEs participate in the project

C.

Modified the governance structure

D.

Engaged in consistent collaboration

Buy Now
Questions 55

A business analyst (BA) has completed multiple workshops involving a number of stakeholders including the project manager however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The project manager should decide which requirement is relevant.

B.

The BA should select which requirements are correct.

C.

The project manager should model requirements in a review meeting.

D.

The BA should model the elicited requirements in a review meeting.

Buy Now
Questions 56

A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?

Options:

A.

Update use case scenarios

B.

Perform a risk analysis

C.

Create requirement relationships

D.

Conduct a cost-benefit analysis

Buy Now
Questions 57

A business analyst (BA), analyzing requirements, has decomposed information into components. What is the purpose of this exercise?

Options:

A.

To enable discussion regarding solution options

B.

To plan project iterations

C.

To plan test cases for the components

D.

To identify the project sponsor

Buy Now
Questions 58

In order to assess proposed solutions, business analysts will need three inputs. Which one of the following is not an input to the task of assessing proposed solutions?

Options:

A.

Solution options

B.

Requirements

C.

Risk assessments

D.

Assumptions and constraints

Buy Now
Questions 59

You are the business analyst for your organization. You are working with several IT professionals to determine all of the connected systems in your organization. You are creating a mapping of the servers, workstations, printers, and other connected devices and their purposes for an analysis of how information is input, processed, stored, and output from each system. What business analysis process are you completing?

Options:

A.

Data flow diagram

B.

Data dictionary and glossary creation

C.

Prototype

D.

Networking topology mapping

Buy Now
Questions 60

Beth is a business analyst for her organization and she's discussing the solution with her key stakeholders. Beth is considering that moving to a new operating system, new office software, and new customized applications will be too much for the end users to learn and to manage their ongoing responsibilities. What task is Beth completing in this scenario?

Options:

A.

Manage the stakeholders.

B.

Evaluate solution performance.

C.

Define transition requirements.

D.

Assess organizational readiness.

Buy Now
Questions 61

You are the business analyst for a smaller project where there are few requirements. Management would still like you to create a method to trace the few requirements for this project. What type of matrix would be best in this instance?

Options:

A.

Coverage matrix

B.

Requirements trace matrix

C.

Roles and responsibility matrix

D.

RACI matrix

Buy Now
Questions 62

You are the business analyst for your organization and you and your staff are creating as many solutions as possible to an identified problem in the solution approach process. What is this activity element called?

Options:

A.

Alternative generation

B.

Brainstorming

C.

Prototyping

D.

Lateral thinking

Buy Now
Questions 63

Fred is the business analyst for his organization. His current initiative is quite large, so Fred decides to create a high-level plan for the business analysis approach, and then to create a detailed plan for the most imminent activities. What type of business analysis planning is Fred using in this scenario?

Options:

A.

Step planning

B.

Iterative planning

C.

Cyclic planning

D.

Rolling wave planning

Buy Now
Questions 64

You are hired as a contract project manager for Dreams Unlimited Inc. The project involves setting up ten servers and fifty client computers on the network. From past experience, you know it takes around fifteen hours to install, test, and finalize a server, while it takes only ten hours for a client. You consider these data for making an estimate of schedule of the task. Which of the following estimation techniques has been used?

Options:

A.

Bottom-up

B.

Schedule performance index

C.

Parametric modeling

D.

Analogous

Buy Now
Questions 65

You are working with several business analysts to determine the solution approach for an identified problem. All of the following techniques are acceptable for identifying the solution approach except for which one?

Options:

A.

Benchmarking

B.

Brainstorming

C.

Decision analysis

D.

Risk analysis

Buy Now
Questions 66

There are three inputs for stakeholder analysis. Which input describes the existing organizational units and their interactions with one another?

Options:

A.

Business need

B.

Enterprise architecture

C.

Matrix structure

D.

Organizational process asset

Buy Now
Questions 67

Which requirements allocation technique is best described as the breaking down of the solution scope into smaller units for allocation?

Options:

A.

Functional decomposition

B.

Resource allocation granularity

C.

WBS creation

D.

Process modeling

Buy Now
Questions 68

Complete this sentence in regard to the level of abstraction. Requirements need to say needs to be done, not to do it.

Options:

A.

What, when

B.

Requirements, who needs

C.

What, how

D.

Requirements, how much

Buy Now
Questions 69

Ralph is a business analyst for his organization and he's using the plan-driven approach for business analysis. Ralph has captured the requirements of the project, but what must happen before he can begin capturing and defining the requirements at a deeper level of detail?

Options:

A.

The initial requirements must be tested for time, cost, quality, and risk.

B.

The initial requirements must undergo a feasibility study.

C.

The initial requirements must be formally approved by the stakeholders.

D.

The initial requirements must pass through the Delphi Technique.

Buy Now
Questions 70

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

Options:

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Buy Now
Questions 71

After a walk-through of the requirements specification with the business users, the group determines that five requirements are now mandatory due to new government regulations. What should the business analyst (BA) do following the meeting?

Options:

A.

Update the priority of the requirements and record the reason for doing so

B.

Ask the test analyst to ensure that test cases are only written to cover the new requirements

C.

Escalate the decision to the project manager to confirm with all users again

D.

Help the system analyst create a prototype of the requirements to demo to the users

Buy Now
Questions 72

A project team needs to maintain the traceability of requirements for a software system. Due to the large number of requirements, which of the following methods should the team use?

Options:

A.

Use a requirements management tool

B.

Create a requirements mode

C.

Maintain the requirements manually

D.

Develop a database management system

Buy Now
Questions 73

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations.

Which of the following does the BA need to adjust to handle this situation?

Options:

A.

Project stakeholders

B.

Logistics setup

C.

Elicitation scope

D.

Elicitation technique

Buy Now
Questions 74

You are the business analyst for your organization and you're reviewing a change to your requirements. During

this impact analysis, what tool can best help you assess the total impact of a requirement change?

Options:

A.

Implementation SME

B.

Traceability

C.

Coverage matrix

D.

Integrated change control

Buy Now
Questions 75

Management comes to you and asks you to complete some specifications and models about the current state of the organization.

Management wants you to complete this business analysis activity as soon as possible and report back to them with your findings. What is the primary purpose of the specify and model requirements process?

Options:

A.

To analyze the roles and responsibilities of users within the organization to determine how the processes may be improved.

B.

To analyze the utility function within the organization to determine how risk tolerance may allow for new opportunities.

C.

To analyze the functioning of an organization and to provide an insight into opportunities for improvement.

D.

To analyze the processes of an organization to determine what processes can be improved, removed, or added.

Buy Now
Questions 76

Some of the requirements in the solution must be completed because of laws and regulations in your industry.

Management would like you, the business analyst, to rank the requirements according to the relevant laws. What type of requirements prioritization is management having you complete?

Options:

A.

Business value ranking

B.

Risk ranking

C.

Constraint ranking

D.

Regulatory ranking

Buy Now
Questions 77

Which of the following is the prime purpose of the Manage Stakeholders Expectations process?

Options:

A.

Identify stakeholders

B.

Close project

C.

Resolve issues

D.

Updating risk registers

Buy Now
Questions 78

A business analyst has determined that a project should be worth $2,750,000 in four years if her company decides to pursue the project. Assuming the rate of return on the investment is six percent, what is the minimum amount of funds the organization should invest in this project?

Options:

A.

$2,585,000.00

B.

$2,749,001.99

C.

$2,178,257.57

D.

$165,000

Buy Now
Questions 79

Which approach is best to take when a business analyst is assessing the solution options for a business need when there are relatively few criteria involved?

Options:

A.

Focus on the life cycle costs of the solutions.

B.

Focus on the commonalities of the solutions.

C.

Focus on the differences of the solutions.

D.

Focus on the implementation cost of the solutions.

Buy Now
Questions 80

When can changes to requirements occur in a business analysis planning and monitoring assignment?

Options:

A.

Changes to requirements can occur any time after the project's change control system has been enacted.

B.

Changes to requirements can occur at any time.

C.

Change to requirements can occur any time before the project scope statement is created.

D.

Change to requirements can occur at any time before the key stakeholders approve the identified requirements.

Buy Now
Questions 81

During a lesson learned session, stakeholders had a heated discussion on the performance measures being employed and why they are necessary. The business analyst (BA) explained that performance measures are required to:

Options:

A.

evaluate whether the required return on investment is met.

B.

gather insights into the value provided by a solution.

C.

decide if similar projects should be taken up again.

D.

verify that organizational resources were spent wisely.

Buy Now
Questions 82

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company's needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

Options:

A.

Negative Impact to value

B.

Positive Evaluation Results

C.

Risk Tolerance

D.

Issue Management

Buy Now
Questions 83

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is: "As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school". The product owner wants to take advantage of this opportunity to provide the staff a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing scope?

Options:

A.

Add me functionality to the list of requirements

B.

Suggest that the story be included with a change to solution scope or be removed

C.

Ask product owner to rank this user story against the existing product backlog

D.

Review business objectives and determine potential value

Buy Now
Questions 84

An organization has hired a consulting firm to implement and customize a software solution they purchased. The firm has raised concerns regarding the effort required to develop a solution that meets all requirements. On what basis should the requirements be prioritized in this context?

Options:

A.

Benefit

B.

Cost

C.

Risk

D.

Penalty

Buy Now
Questions 85

A business analyst (BA) has developed requirements for a project containing sensitive information. The requirements were approved and the solution was implemented. What should the BA do to ensure these requirements are maintained for future reference?

Options:

A.

Print the requirements package and distribute it to stakeholders in person

B.

Archive the requirements package in the business analysis portal

C.

Store the requirements package on secure shared drive

D.

Send the requirements package to stakeholder in a password protected email

Buy Now
Questions 86

A team of business analysts (BAs) identified policies that dictate how the organization grants paid time off for its employees and the associated business rules. What is this team of BAs trying to do?

Options:

A.

Analyze the benefits information

B.

Analyze the current state of the enterprise

C.

Identify hidden business rules

D.

Explore human resources documentation

Buy Now
Questions 87

A business analyst (BA) needs approval for the requirements which were elicited, collated, and verified by a peer. The BA needs to understand the approval process and appropriate stakeholders who have the authority to approve the requirements. Which of the following artifacts contains this information?

Options:

A.

Information management approach

B.

Stakeholder engagement approach

C.

Governance approach

D.

Business analysis approach

Buy Now
Questions 88

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

Options:

A.

Surveys or QUESTION NO:naires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modelling from previous initiatives

Buy Now
Questions 89

During planning, elicitation, and sign off of requirements, the stakeholders felt that their opinions were not heard and information was not frequently shared. What major competency was lacking in this process?

Options:

A.

Collaboration

B.

Trustworthiness

C.

Information

D.

Communication

Buy Now
Questions 90

A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?

Options:

A.

Evaluate the new system against competitor applications

B.

Confirm the satisfaction of business requirements

C.

Conduct another survey to validate the original results

D.

Validate performance measures and alignment with KPIs

Buy Now
Questions 91

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

Options:

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Buy Now
Questions 92

A business analyst (BA) needs to obtain agreement on and approval of requirements for a software solution. In order for this task to proceed, what does the BA need to understand?

Options:

A.

The verified requirements

B.

The solution design

C.

The business analysis approach

D.

The stakeholder roles

Buy Now
Questions 93

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

Options:

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Buy Now
Questions 94

A business analyst (BA) is compiling information about different approaches that will meet solution

requirements in order to make a recommendation for solution design. To evaluate whether externally available solutions meet the requirements, which of the following will the BA create and distribute?

Options:

A.

Statement of Work (SOW)

B.

Rough Order of Magnitude (ROM)

C.

Request for Information (RFI)

D.

Work Breakdown Structure (WBS)

Buy Now
Questions 95

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group, individually, asking Questions about current business processes. The BA compares the information obtained during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Verification of requirements

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Capture of elicitation outcomes

Buy Now
Questions 96

A stakeholder would like to add requirements to an IT project which is in flight. The project manager wants to revisit the traceability repository prior to committing to the addition of any new requests, because it is used for which of the following activities?

Options:

A.

Creating test plans and test cases

B.

Approving requirement relationships

C.

Developing documentation for technical support

D.

Supporting change and scope management

Buy Now
Questions 97

A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?

Options:

A.

Review the business objectives

B.

Consult the business case

C.

Assess external risks

D.

Perform an environmental scan

Buy Now
Questions 98

A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?

Options:

A.

Perform data modelling

B.

Conduct elicitation activities

C.

Meet with the sponsor

D.

Consult with the project manager

Buy Now
Questions 99

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

Options:

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Buy Now
Questions 100

A certain stakeholder requirement has been analyzed and broken down into several solution requirements, each affecting a different IT system. After solution design, the business analyst (BA) receives feedback that

one of the IT systems will take longer than anticipated to implement. What requirements artifact or technique will assist the BA in better understanding the related requirements?

Options:

A.

MoSCoW prioritization

B.

Backlog management

C.

Requirements documentation

D.

Traceability matrix

Buy Now
Questions 101

A business analyst (BA) is planning to elicit requirements. The BA understands the scope of the elicitation and has selected interviewing as an appropriate technique. Which of the following is part of the logistics for these interviews?

Options:

A.

Relationships between elicited requirements

B.

Performance metrics

C.

Definition of the future state

D.

Participants and their roles

Buy Now
Questions 102

The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?

Options:

A.

To document the project's completion

B.

To define the analysis approach

C.

To verity the project's progress

D.

To ensure a shared understanding of the information

Buy Now
Questions 103

The business analyst (BA) is analyzing the formal relationships between people working in the enterprise. Which technique will the BA use to perform this task?

Options:

A.

Organizational modelling

B.

Stakeholder modelling

C.

Focus groups

D.

Functional decomposition

Buy Now
Questions 104

A business analyst (BA) is developing the requirements for an inventory management system. Some current accounting processes are automated but other departments like purchasing, marketing, sales and distribution departments work in isolation and have a manual process. They extensively use spreadsheets to maintain the transactions and at the end of the day the department managers manually verify and reconcile transactions before supplying the information to the accounting department. In order to verify and validate the elicited requirements, the BA will need to prepare a:

Options:

A.

single process model on automation for all stakeholders.

B.

database structure in the viewpoint of the selected stakeholders

C.

list of requirements in a spreadsheet for all stakeholders.

D.

set of process models in the viewpoint of the selected stakeholders.

Buy Now
Questions 105

A business analyst (BA) needs to make sure that the business analysis information is securely stored and accessible to stakeholders. Which element helps in achieving that goal?

Options:

A.

Requirements attributes

B.

Organization of information

C.

Traceability approach

D.

Level of abstraction

Buy Now
Questions 106

Before beginning requirements elicitation, a business analyst (BA) has planned the necessary activities, identified needed stakeholders, and documented this in the Business Analysis Plan. Which approach will help the BA ensure that stakeholders are available when required?

Options:

A.

Talk to the stakeholders' managers to ensure the resources will be available

B.

Send meeting invitations well in advance so stakeholders can plan in time

C.

Conduct a review of the plan with the stakeholders and adjust according to the feedback received

D.

Request an introduction letter from the business sponsor highlighting the importance of the initiative

Buy Now
Questions 107

A business analyst (BA) is tasked with designing a method of ensuring that the requirements captured during the elicitation sessions satisfy the needs and expectations of the customer experience, within an initiative. The BA identifies a way that the stakeholder requirements can be structured to ensure realization of the desired customer experience. Which viewpoint describes the approach taken by the BA to structure the requirements?

Options:

A.

User interactions

B.

Business model

C.

Audit and security

D.

Business process model

Buy Now
Questions 108

A business analyst (BA) has completed documenting requirements and to save time, recommends sharing the requirements document with the development team to fast-track development immediately. What issue may arise by doing so?

Options:

A.

Stakeholders may refuse the solution.

B.

Requirements metrics may not be measurable.

C.

The BA may significantly impact other aspects of the project timeline.

D.

The business need may change.

Buy Now
Questions 109

A project's business requirements require that the new solution reduce the labor costs currently attributed to performing end of month accounting procedures. Currently the company routinely must pay overtime to meet the deadline. The business analyst (BA) has been documenting the process and wants to ensure that the approach to the process design is feasible for the staff who perform the end of month procedures. Which of the following stakeholders will provide this verification?

Options:

A.

Implementation subject matter expert

B.

Domain subject matter expert

C.

Operational support

D.

Project sponsor

Buy Now
Questions 110

A business analyst (BA) is validating requirements and has found that the design cannot be validated to support the requirements. Which of the following is creating this situation?

Options:

A.

Incorrect assumptions.

B.

Lack of requirements traceability.

C.

Missing requirements.

D.

Substandard solution design.

Buy Now
Questions 111

A project aiming at improving an organization's Net Promoter Score is nearing completion. The business analyst (BA) and stakeholders are evaluating ways to measure the performance of the solution. Which technique may be employed?

Options:

A.

Vendor assessment

B.

Market analysis

C.

Focus groups

D.

Business case

Buy Now
Questions 112

One of the tasks that the business analyst (BA) needs to complete is to maintain the requirements. As much as the BA values and sees the benefits of maintaining the requirements, the project manager (PM) does not see the same. In order to help the PM understand the value of this task, which following benefit of maintaining the requirements should the BA communicate to the PM?

Options:

A.

They identify the financial projections of the project.

B.

They define the project schedule and future tasks.

C.

They describe how to setup the traceability tools.

D.

They can easily be traced and reused for future.

Buy Now
Questions 113

The business analyst (BA) has documented the requirements for a new system and is preparing the requirements for approval. Which of the following helps ensure that requirements are fully understood and traceable?

Options:

A.

Requirements are extracted for review

B.

Requirements are properly classified

C.

Requirements are validated

D.

Requirements meet regulatory standards

Buy Now
Questions 114

A business analyst (BA) creates the following diagram as part of current state analysis activities.

CCBA Question 114

What does a diagram of this type help users to understand?

Options:

A.

Decision-making

B.

Regulatory compliance

C.

Business capability

D.

Process improvement

Buy Now
Questions 115

A business analyst (BA) is working to identity the business need, specifically the problems with the current state of a process. At which level of the enterprise can the BA identify problems with the current state?

Options:

A.

Bottom-up

B.

Top-down

C.

From external drivers

D.

From middle-management

Buy Now
Questions 116

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Buy Now
Questions 117

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

Options:

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Buy Now
Questions 118

The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another so begins with reviewing the:

Options:

A.

template architectures.

B.

business rules document.

C.

functional specification.

D.

work breakdown structure.

Buy Now
Questions 119

A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK ® GUIDE, what will the BA need to do?

Options:

A.

Ensure high level user stories are completed and accepted

B.

Use an informal approval process to speed up delivery

C.

Use a rigorous approval process of detailed specifications

D.

Ensure the document is completed and signed off

Buy Now
Questions 120

A business analyst (BA) is supporting an organization in its product launch. The BA wants to identify assumptions about the benefits resulting from the new product. What does identifying assumptions help the BA manage?

Options:

A.

Priorities

B.

Metrics

C.

Requirements

D.

Risks

Buy Now
Questions 121

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Buy Now
Questions 122

There are competing needs from the different business areas that will use a new system. The business analyst (BA) sets up a weekly meeting with a structured agenda to review the total effort, cost, business impact and risk of each requirement with the business leads to determine what is included in each release of the solution. What approach has the BA defined?

Options:

A.

Prioritization approach

B.

Communication approach

C.

Collaboration approach

D.

Traceability approach

Buy Now
Questions 123

The business analysis (BA) team is evaluating a new commercial off-the-shelf (COTS) application that will be implemented in the coming months. The company has over 20 legacy systems deployed. The Chief Information Officer (CIO) is worried about the need for integration and that some key linkages are missing.

What is the BA team evaluating?

Options:

A.

Technology and infrastructure

B.

Industry standard architecture

C.

Service oriented architecture

D.

Business architecture

Buy Now
Questions 124

A business analyst (BA) must model information characteristics across multiple information systems for a project. What type of model captures this information?

Options:

A.

Interface analysis

B.

Business capability analysis

C.

Decision analysis

D.

Force field analysis

Buy Now
Questions 125

There are three inputs for stakeholder analysis. Which input describes the organizational units that exist and their interactions with one another?

Options:

A.

Business need

B.

Enterprise architecture

C.

Matrix structure

D.

Organizational process asset

Buy Now
Questions 126

You are the business analyst for your organization and you've been working with several stakeholders to

gather requirements for approval.

The requirements have been approved with the exception of a conflict on one requirement. What must you and the stakeholders do in regard to this conflict before the business analysis endeavor may continue?

Options:

A.

The requirement with the conflict should be excluded from the approved set of requirements and must be resolved before it can be joined to the approved set of requirements.

B.

The conflict must be documented as a risk.

C.

The conflict must be resolved before the set of requirements may be approved.

D.

The conflict must be documented in an issues log, assigned to an issue owner, and then the endeavor may continue.

Buy Now
Questions 127

A business analyst (BA) has determined that “Product Box”, a collaboration game, will provide a fun way to engage the stakeholders when working on prioritizing the list of features. What should the BA do?

Options:

A.

Ensure buy-in from key stakeholders

B.

Send out an agenda in advance

C.

Research ideas for the new product

D.

Consider meeting logistics

Buy Now
Questions 128

Which basis for prioritization allows the project team to work initially with lower-risk requirements first?

Options:

A.

Quantitative ranking

B.

Positive risk ranking

C.

Relationship to other requirements

D.

Implementation difficulty

Buy Now
Questions 129

If an organization wants to re-use requirements, where should the defined requirements be kept?

Options:

A.

Requirements management plan

B.

Requirements repository

C.

Solution scope

D.

Project management plan

Buy Now
Questions 130

You are the business analyst in your organization and you're working to organize the requirements for the business units in your company. Which technique is best suited for structuring requirements around the needs of each stakeholder group?

Options:

A.

Organizational modeling

B.

User stories

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 131

The task of prioritizing requirements creates just one output. What is it?

Options:

A.

Validated requirements

B.

Requirements (prioritized)

C.

Requirements rankings

D.

Requirements assessment

Buy Now
Questions 132

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

Options:

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings

Buy Now
Questions 133

You are the business analyst for your organization and you're working with your stakeholders to assess the organization's readiness for the solution. As part of this assessment, you'll perform a cultural assessment. What is the purpose of this assessment?

Options:

A.

To determine how the culture may affect the solution

B.

To determine if the stakeholders genuinely want the change to be successful

C.

To determine if the change is feasible in the environment

D.

To determine how the solution affects the stakeholders' culture

Buy Now
Questions 134

All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

Options:

A.

All ideas should be visibly recorded.

B.

The number of ideas should not be limited.

C.

The ideas should be generated with a cost or time estimate.

D.

All ideas should be shared without any discussion, criticism, or evaluation.

Buy Now
Questions 135

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

Options:

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Buy Now
Questions 136

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following are business analysis planning and monitoring activities? Each correct answer represents a complete solution.

Options:

A.

Job shadowing

B.

Planning how requirements will be approached, traced, and prioritized

C.

Identifying stakeholders

D.

Defining and determining business analysis processes

Buy Now
Questions 137

Complete this statement. Policies and rules serve as boundaries and the organization and the operation of the organization.

Options:

A.

Influence

B.

Constraint

C.

Direct

D.

Lead

Buy Now
Questions 138

Linda works as a project manager for an IT project. She is getting new developers for completing her project. Which of the following processes is she involved in?

Options:

A.

Manage Project Team

B.

Develop Project Team

C.

Acquire Project Team

D.

Human Resource Planning

Buy Now
Questions 139

A business analyst (BA) has been hired to validate a project's requirements. A series of meetings with stakeholders have been scheduled to walk through each requirement as it relates to the desired future state of the organization. The desired outcome of this exercise is to ensure that all requirements:

Options:

A.

link to user stories.

B.

are articulated correctly.

C.

are funded by the business sponsors.

D.

support the delivery of needed value.

Buy Now
Questions 140

The process of defining the business need uses one output. What is it?

Options:

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Buy Now
Questions 141

You are the business analyst for your organization and you're using a plan-driven approach to business analysis processes. In this environment, what types of communications are most likely required to be used in regard to requirements?

Options:

A.

Informal

B.

Ad hoc

C.

Face-to-face

D.

Formal

Buy Now
Questions 142

There are three business analysis planning techniques that a business analyst can use to help plan business analysis processes. Which one of the following is not one of the three techniques?

Options:

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Buy Now
Questions 143

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

Options:

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Buy Now
Questions 144

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are formed. Which one of the following best describes how requirements are formed?

Options:

A.

Stakeholders' needs, wants, and expectations

B.

Solutions-based approach

C.

Change-driven approach

D.

Risk and reward solution

Buy Now
Questions 145

You are the business analyst for your organization and you're creating a data flow diagram to show how

information is input, processed, stored, and output from a system. Which element of a data flow diagram represents a process that transforms data by combining it with other data?

Options:

A.

Data flow

B.

External entities

C.

Data process

D.

Concatenation

Buy Now
Questions 146

Jason is creating a business case for his organization and management has asked him to assess the appropriate risks in the business case regarding the solution. Which one of the following risks is not a concern for Jason when defining the business case and associated risks?

Options:

A.

Financial risk

B.

Positive risk

C.

Organizational risk

D.

Technical risk

Buy Now
Questions 147

You are the business analyst for an organization and you're managing your stakeholders through the requirements validation activities. Your stakeholders are categorized by executives, functional managers, directors, end users, and customers. Which of these stakeholders are involved in the requirements validation

activities?

Options:

A.

All of the stakeholders

B.

Functional management

C.

Executives

D.

Customers

Buy Now
Questions 148

There are three inputs needed to determine the solution approach process. What are these inputs?

Options:

A.

Business need, organizational process assets, and enterprise environmental factors

B.

Business need, enterprise environmental factors, and required capability

C.

Business need, organizational process assets, and assumptions

D.

Business need, organizational process assets, and required capability

Buy Now
Questions 149

What does MoSCoW mean when it comes to requirements prioritization?

Options:

A.

Must, Should, Could, Would

B.

Money, Schedule, Control, Waiting

C.

Must, Should, Could, Won't

D.

Mustn't, Shouldn't, Couldn't, Won't

Buy Now
Questions 150

An organization has invested $750,000 into a technology to help secure, automate, and communicate customer ordering. The solution has worked well for the past six months, but a newer technology has been developed that surpasses the abilities of the current solution and solves many defects and issues the company has with the existing solution. Purchasing the newer solution, however, means that the company will have to discard the solution that's only been in place for the past six months. What term can be assigned to the monies already implemented into the existing solution?

Options:

A.

Opportunity cost

B.

Cost of nonconformance

C.

Sunk costs

D.

Cost-benefits

Buy Now
Questions 151

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

Options:

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Buy Now
Questions 152

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders located in offices around the world. Because these stakeholders are dispersed, what is likely to increase in this endeavor as opposed to a collocated group of stakeholders?

Options:

A.

Costs

B.

Face-to-face meetings

C.

Communication needs

D.

Risks

Buy Now
Questions 153

You are the business analyst for your organization and you're working with Adam on business analysis processes. Adam allows the business analysis activities and resources to exist in support of the organization. Of the following, what type of business analysis stakeholder is Adam?

Options:

A.

Project manager

B.

Domain subject matter expert

C.

Sponsor

D.

Regulator

Buy Now
Questions 154

One of the techniques to assess capabilities in an organization is to use SWOT. What does SWOT accomplish?

Options:

A.

SWOT reviews your strengths, weaknesses, opportunities, and threats.

B.

It identifies how current capabilities match up against the influencing factors.

C.

It assesses the strength, weaknesses, opportunities, and threats.

D.

SWOT is a goal setting technique that means "Sweat Works Over Time."

Buy Now
Questions 155

In order to plan the business analysis approach, the business analyst must understand the organizational process needs and what other thing?

Options:

A.

Operation of organizations and the objectives of business analysis

B.

Consideration of risk and reward

C.

Purpose of the proposed solution

D.

Stakeholders' threats and perceived threats

Buy Now
Questions 156

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Buy Now
Exam Code: CCBA
Exam Name: Certification of Capability in Business Analysis (CCBA)
Last Update: May 18, 2024
Questions: 522

PDF + Testing Engine

$56  $159.99

Testing Engine

$42  $119.99
buy now CCBA testing engine

PDF (Q&A)

$35  $99.99
buy now CCBA pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 20 May 2024