CDT Construction Documents Technologist Questions and Answers

Questions 4

Who is responsible for job site security?

Options:

A.

Owner

B.

Architect/engineer

C.

Contractor

D.

Construction manager

Buy Now
Questions 5

Which of these is NOT a graphical format used to establish order and organization of construction drawings?

Options:

A.

United States National CAD Standard

B.

American Institute of Architects (AIA) CAD Layer Guidelines

C.

Construction Specifications Institute (CSI) Uniform Drawing System

D.

MasterFormat®

Buy Now
Questions 6

The three types of commissioning include systems and equipment commissioning, building envelope commissioning, and what other process?

Options:

A.

Mechanical commissioning

B.

Facility commissioning

C.

Process commissioning

D.

Total project commissioning

Buy Now
Questions 7

Which of the following is a component of project design team coordination during the construction documents phase?

Options:

A.

Duplication of important information by each discipline

B.

Ensuring drawing note terminology is differentiated from specification terminology

C.

Requiring the owner to hire a third-party to write the Division 01 specifications independently

D.

Quality assurance tasks shared between design and consulting teams

Buy Now
Questions 8

Cost classification, data organization, and specifications use which written formats?

Options:

A.

OmniClass and UniFormat

B.

UniFormat and MasterFormat

C.

OmniClass and MasterFormat

D.

SectionFormat® and MasterFormat

Buy Now
Questions 9

Which term or word is appropriate to use in specification text?

Options:

A.

Any

B.

As per

C.

As required

D.

Work

Buy Now
Questions 10

The owner's budget may not be adequate to pay for the entire project. What method is used to allow flexibility in the event that the budget is exceeded by the bids?

Options:

A.

Cash allowance

B.

Quantity allowance

C.

Unit pricing

D.

Alternates

Buy Now
Questions 11

Which of the following is NOT included in Divisions 02–49 of a project manual?

Options:

A.

General requirements

B.

Finishes

C.

Concrete

D.

Utilities

Buy Now
Questions 12

Procedural requirements for alternates, project meetings, and submittals belong where?

Options:

A.

Divisions 02-49

B.

The general conditions

C.

The supplementary conditions

D.

Division 01

Buy Now
Questions 13

Which of the following statements is correct?

Options:

A.

Contract documents are complementary

B.

Requirement of one of the contract documents may be superseded by others

C.

Specifications take precedence over drawings

D.

The architect/engineer may require the contractor to perform at a higher level than the contract documents require

Buy Now
Questions 14

What determines the responsibilities of the participants on the project team?

Options:

A.

Size of the project

B.

Nature of the project

C.

Cost of construction

D.

Project delivery type

Buy Now
Questions 15

Which of the following elements should be included in Supplementary Conditions?

Options:

A.

Requirements for a schedule of values

B.

Claims and dispute resolution requirements

C.

Equal employment opportunity requirements

D.

Termination of the work by owner or contractor

Buy Now
Questions 16

The dual nature of design includes what two elements?

Options:

A.

Site and building

B.

Aesthetic and technical

C.

Programming and planning

D.

Innovation and authenticity

Buy Now
Questions 17

Within a project budget, which item falls into the category of a hard cost?

Options:

A.

Architect/engineer design fees

B.

Commissioning fees

C.

Project financing

D.

Land acquisition

Buy Now
Questions 18

The architect/engineer reviews submittals for which of the following reasons?

Options:

A.

To correct or change the design

B.

To monitor design conformance

C.

To review installation procedures

D.

To review substitution requests

Buy Now
Questions 19

Why should project closeout meetings be held?

Options:

A.

To set substantial completion

B.

To resolve subcontractor disputes

C.

To commission the project for occupancy

D.

To review handover procedures and activities

Buy Now
Questions 20

What does Divisions 02-49 of the construction project manual address?

Options:

A.

Procurement instructions

B.

Distinct work results areas

C.

Temporary facilities and controls

D.

Life cycle activities

Buy Now
Questions 21

Which of the following statements best describes stakeholder and participant interest in a project?

Options:

A.

Participants have direct interest in the project while stakeholders have indirect interest

B.

Stakeholders have direct interest in the project while participants have indirect interest

C.

Both stakeholders and participants have direct interest in the project

D.

Both stakeholders and participants have indirect interest in the project

Buy Now
Questions 22

How long after bid opening is a bidder required to honor their bid price for a project?

Options:

A.

It should be no less than the time period acknowledged on the bid form.

B.

The time period is thirty days for a private project and indefinitely for a public project.

C.

The time period should conform to requirements set by the Associated General Contractors of America.

D.

The time period as established by the contract for construction.

Buy Now
Questions 23

What is MasterFormat® keyword index used for?

Options:

A.

Identifying Level 4 sections

B.

Identifying specification format

C.

Locating subject titles and numbers

D.

Specifying correct word usage

Buy Now
Questions 24

Which bid form component ensures equal consideration, transparency, and flexibility while awarding a contract, but also manages cost during execution for undefined and unforeseen construction conditions?

Options:

A.

Bid security and substitution

B.

Add and deduct alternatives

C.

Allowances and unit prices

D.

Liquidated damages and combined bids

Buy Now
Questions 25

Which of the following is LEAST important to log when documenting the decision-making process?

Options:

A.

Date, time, and location of the meeting

B.

List of attendees and who they represent

C.

Length of time each attendee spent speaking

D.

Action items with responsibilities assigned and date to accomplish

Buy Now
Questions 26

Which of the following establishes a baseline from which deviations are identified?

Options:

A.

General requirements

B.

Supplementary conditions

C.

Project manual

D.

General conditions

Buy Now
Questions 27

What requirement is set by authority, custom, or general consensus that is also an established accepted criterion?

Options:

A.

Building code

B.

Quality control standard

C.

Reference standard

D.

Specification master

Buy Now
Questions 28

Under the design-bid-build project delivery, what is the next step after the procurement phase has ended to award the contract for construction?

Options:

A.

The contractor begins negotiating agreements with subcontractors.

B.

The owner forwards construction contract agreements to subcontractors.

C.

The contractor and owner issue an amendment indicating the project is in the construction phase.

D.

The owner issues a letter of intent or forwards the owner-contractor agreement to the successful bidder.

Buy Now
Questions 29

Which party has the ultimate authority to approve a change order?

Options:

A.

Architect/engineer

B.

Contractor

C.

Owner

D.

Construction manager

Buy Now
Questions 30

Where can you typically find requirements for temporary toilet facilities?

Options:

A.

Supplementary Conditions

B.

Division 22 – Plumbing

C.

The Owner–Contractor Agreement

D.

Division 01 – General Requirements

Buy Now
Questions 31

A drawing set arranged in the following order is an example of what type of drawing organization?

Cover Sheet, Sheet Index, Life Safety, Demolition, Civil, Landscaping, Architectural, Interiors, Structural, Mechanical, Electrical, Plumbing, Fire Protection

Options:

A.

Traditional drawing set organization

B.

Uniform Drawing System

C.

AIA CAD Layer Guidelines

D.

BIM Implementation

Buy Now
Questions 32

Standards for sustainable facilities, products, and fundamental approaches emphasize the needs of what?

Options:

A.

Architect, supplier, and contractor

B.

Owner, stakeholders, and participants

C.

Public, private, and environmental health

D.

Owner team, contractor team, and design team

Buy Now
Questions 33

Where are the limits of the work of each alternate defined?

Options:

A.

Agreement

B.

Bid Form

C.

Division 01

D.

Sections in Divisions 02–49

Buy Now
Questions 34

What must a specification section indicate?

Options:

A.

The building trade that will perform the installation

B.

The likely anticipated cost of the specified product

C.

The interrelationships that exist between the work of this section and the entire project

D.

How the owner will be compensated if the specified item is unavailable

Buy Now
Questions 35

Which of the following is an example of preconstruction submittals?

Options:

A.

Product data

B.

Shop drawings

C.

Schedule of values

D.

Warranty documentations

Buy Now
Questions 36

Which member of the project team initiates the project, assumes the risk, controls and manages the design and construction process, and provides the funding?

Options:

A.

Contractor

B.

Designer

C.

Supplier

D.

Owner

Buy Now
Exam Code: CDT
Exam Name: Construction Documents Technologist
Last Update: Jan 6, 2026
Questions: 120

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now CDT testing engine

PDF (Q&A)

$31.5  $104.99
buy now CDT pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 06 Jan 2026