Labour Day - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

CPIM-ECO Execution and Control of Operations Questions and Answers

Questions 4

Managing the constraint in an operation will improve which of the following metrics?

Options:

A.

Takt time

B.

Process variability

C.

Work in process

D.

Cycle time

Buy Now
Questions 5

Which of the following approaches should improve a supplier's quality, price, and delivery performance?

Options:

A.

Long-term commitments for capacity

B.

Fixed warehouse storage locations

C.

Secondary sources for components

D.

Timely inspection of material

Buy Now
Questions 6

Which of the following terms describes a management technique used to evaluate planned changes to production processes?

Options:

A.

Analysis of variance

B.

Theory of constraints

C.

Design of experiments

D.

Design for manufacturability

Buy Now
Questions 7

Important and measureable characteristics of a product or process whose performance targets are set by the customer is:

Options:

A.

voice of the customer.

B.

customer-as-participant.

C.

critical-to-quality.

D.

concurrent engineering.

Buy Now
Questions 8

Operation-to-operation quantity reporting is most important to which of the following production environments?

Options:

A.

Job-lot production

B.

Process production

C.

Repetitive manufacturing

D.

Continuous manufacturing

Buy Now
Questions 9

Scheduling to less-than-full capacity facilitates which of the following outcomes?

Options:

A.

Material handling reduction

B.

Increased finished goods

C.

Preventative maintenance

D.

Reduced forecast variance

Buy Now
Questions 10

In a work center that requires a large number of tooling changes, the best way to increase productivity is to:

Options:

A.

manage work center queue.

B.

optimize run time.

C.

reduce setup time.

D.

implement theory of constraints.

Buy Now
Questions 11

The next job to be performed was selected because it had the least amount of operation time prior to the due date. Which of the following priority sequencing rules was being used?

Options:

A.

Slack time per operation

B.

Shortest operation time

C.

Critical ratio

D.

Slack time per order

Buy Now
Questions 12

Structured problem solving provides what essential result to an organization?

Options:

A.

Recognition of problems in the company's competitive position

B.

Resolution of problems of other organizations in like markets or with similar customers

C.

Recognition of problems with the company's management team

D.

Resolution of both strategic and operational problems

Buy Now
Questions 13

Based on the theory of constraints (TOC) scheduling approach, smaller lots created as a result of splitting order quantities are considered to be:

Options:

A.

period order quantities.

B.

bottleneck batches.

C.

transfer batches.

D.

campaign orders.

Buy Now
Questions 14

Objectives of implementing a work cell include which of the following outcomes?

Options:

A.

Increasing worker satisfaction

B.

Organizing resources by raw material type

C.

Implementing standard work

D.

Sharing common equipment

Buy Now
Questions 15

During a soldering operation some components were getting damaged due to high temperatures. A fix to eliminate the defect was put into place, which resulted in a(n):

Options:

A.

SPC study.

B.

6 sigma process.

C.

poka-yoke.

D.

100% inspection.

Buy Now
Exam Code: CPIM-ECO
Exam Name: Execution and Control of Operations
Last Update: Apr 22, 2024
Questions: 105

PDF + Testing Engine

$56  $159.99

Testing Engine

$42  $119.99
buy now CPIM-ECO testing engine

PDF (Q&A)

$35  $99.99
buy now CPIM-ECO pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 27 Apr 2024