In order to reduce inconvenience for customers during a maintenance phase, support staff should concentrate on fixing

Options:

A.

all known defects

B.

minor defects only

C.

defects that affect the “vital few” customers

D.

defects that impact essential operations

Buy Now
Questions 5

The most important reason for standardizing software development processes is to

Options:

A.

meet ISO 9001 requirements

B.

deliver quality software on schedule and within budget

C.

ensure that employees comply with established procedures

D.

ensure that new employees are trained m established procedures

Buy Now
Questions 6

Which of the following statements from a software requirements document is an example of a functional requirement?

Options:

A.

“The system must reject non-numeric input.”

B.

“The system must be 99.9% operational.”

C.

“The system’s response time must be less than three seconds.”

D.

“The system must be developed according to IEEE standards.”

Buy Now
Questions 7

Which of the following activities generally requires the most effort after the release of a software system?

Options:

A.

Customer acceptance

B.

Performing maintenance

C.

Revising documentation

D.

Training the users

Buy Now
Questions 8

Which of the following information is considered part of the software baseline?

Options:

A.

Test logs

B.

Test plan and test cases

C.

User survey and their results

D.

Software metrics and summarized data

Buy Now
Questions 9

Which of the following activities should be classified as an internal failure cost?

Options:

A.

Responding to customer satisfaction

B.

Completing an internal audit

C.

Shipping a maintenance build

D.

Investigating the cause of build defects

Buy Now
Questions 10

Under the object-oriented paradigm, the issue of software reusability is addressed mainly by which of the following constructs?

Options:

A.

Attribute

B.

Method

C.

Message

D.

Class

Buy Now
Questions 11

The following graphs illustrate the arrival rate and current status of software defects during system test. Which of these graphs indicates a product that is most ready for formal release to the customer?

A)

CSQE Question 11

B)

CSQE Question 11

C)

CSQE Question 11

D)

CSQE Question 11

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 12

The following chart was created by a team.

CSQE Question 12

The chart shows number of defects over time, including projected unit test defects, projected integration test defects, actual unit test defects, and actual integration test defects. Which of the following conclusions can be drawn from this chart?

Options:

A.

Unit testing has been poorly planned.

B.

Unit testing is isolating as many defects as predicted.

C.

Integration testing is very effective in isolating defects.

D.

Integration testing is isolating as many defects as predicted.

Buy Now
Questions 13

During what activity would it be appropriate for a team to use a complexity analyzer0

Options:

A.

Requirements analysis

B.

Requirements traceability

C.

Test planning

D.

Test execution

Buy Now
Questions 14

Which of the following is a management practice that will provide business continuity?

Options:

A.

Creating and documenting a business continuity’ plan

B.

Defining an organizational policy for business continuity

C.

Analyzing and assessing the organization for business continuity’

D.

Identifying and selecting appropriate strategies for business continuity

Buy Now
Questions 15

Software security is developed to address which of the following types of communication threats?

Options:

A.

Intentional attacks

B.

Unintentional attacks

C.

Physical attacks

D.

Natural disasters

Buy Now
Questions 16

Test data requirements

Options:

A.

include mechanisms for defining when, and for how long, each test data item is needed

B.

allow test data items to be reusable so that the same tests can be executed multiple times

C.

describe the data items and their characteristics and properties needed to execute the tests

D.

act as a single source of content for multiple testers to find and use existing test data items

Buy Now
Questions 17

Which of the following software development methodologies uses test cases as an aspect of requirements and design to implement code?

Options:

A.

Waterfall

B.

Incremental

C.

Scrum

D.

Extreme Programming (XP)

Buy Now
Questions 18

Which of the following elements must be in place for a measure to be reliable?

Options:

A.

A well-designed data collection form

B.

An automated tool for calculating the measure

C.

An operational definition of the measure

D.

An online database for tracking the measure

Buy Now
Questions 19

The planned value of a project is $1,000,000. The project is 75% done, and the earned value is currently $700,000. In this case, the project is

Options:

A.

over budget

B.

under budget

C.

behind schedule

D.

ahead of schedule

Buy Now
Questions 20

Which of the following can be used to assess the impact of a proposed software change?

Options:

A.

Traceability matrix

B.

Regression testing

C.

Baseline audit

D.

Defect rate

Buy Now
Questions 21

Software configuration status accounting is the process of

Options:

A.

partitioning the software product into formally identified configuration items

B.

systematically controlling changes to software items under configuration control

C.

recording and reporting of information needed to effectively manage a software configuration

D.

providing objective assurance that the software configuration items being built match their requirements

Buy Now
Questions 22

If 5 defects were found during a software analysis and 5 defects were found in later phases, what is the phase containment effectiveness (PCE) of this software analysis?

Options:

A.

0%

B.

25%

C.

50%

D.

100%

Buy Now
Questions 23

As it relates to testing, the phrase " 80% coverage " means 80% of the

Options:

A.

software is error-free

B.

statements in the program have been tested

C.

planned test cases have been completed

D.

predicted errors have been uncovered

Buy Now
Questions 24

During a joint application development (JAD) session, the group uncovers a controversial and sensitive issue. Which of the following techniques will provide a structure to help resolve the issue?

Options:

A.

Brainstorming

B.

Effort/Impact grid

C.

Smoothing

D.

Nominal group technique

Buy Now
Questions 25

In a software development company, which of the following authorities is responsible for establishing the company ' s quality policies?

Options:

A.

Senior management

B.

Quality management

C.

Engineering development teams

D.

A cross-functional ream of developers and managers

Buy Now
Questions 26

A project manager has decided to modify a project schedule to allow some of the low-level design to begin before all of the high-level design has been completed. Is this approach appropriate?

Options:

A.

No, because high-level design must be completed before low-level design is started.

B.

Yes, provided the same people perform both the high-level and the low-level designs.

C.

Yes, provided the activities have a relationship to one another.

D.

Yes, provided no unfinished high-level design will impact a specific area to be low-level designed.

Buy Now
Questions 27

Who is responsible for walking through business scenarios to determine the completeness of the defined requirements?

Options:

A.

The analyst

B.

The tester

C.

The quality function representative

D.

The product developer

Buy Now
Questions 28

Which of the following measures would a project manager use to assess the team’s progress against the project schedule?

Options:

A.

Function point metric

B.

Earned value analysis

C.

SMART metrics

D.

COCOMO H Model

Buy Now
Questions 29

The following graph depicts errors per 1,000 lines of code (KLOC) for modules S, T, U, and V.

CSQE Question 29

CSQE Question 29

The program manager should be most concerned about which module?

Options:

A.

S

B.

T

C.

U

D.

V

Buy Now
Questions 30

During what time period is the software configuration management plan implemented?

Options:

A.

From the requirements phase through the maintenance phase of the software lifecycle

B.

After the software product is placed into production

C.

From the requirements phase through the testing phase of the software lifecycle

D.

During the code generation phase of the lifecycle

Buy Now
Questions 31

Project success is achieved by meeting project objectives, which include which of the following?

Options:

A.

A project closure plan

B.

The critical path method

C.

Tasks that are the most difficult

D.

A project time limit

Buy Now
Questions 32

Static analysis tools are used to evaluate

Options:

A.

requirements and design

B.

software builds and test cases

C.

test procedures and packaging

D.

documentation and source code

Buy Now
Questions 33

Which of the following best describes the role of performance as a non-functional requirement in software development?

Options:

A.

Focusing on how user-friendly and intuitive the software interface is

B.

Ensuring the software can be easily updated to meet new requirements

C.

Guaranteeing the software meets specific legal and compliance standards

D.

Determining how well the software operates under varying workload conditions

Buy Now
Questions 34

A software engineer is asked to analyze the relationship between the number of defects found and the complexity of various software applications. Which of the following is the appropriate tool to use for this analysis?

Options:

A.

Cause and effect diagram

B.

Control chains

C.

Histogram

D.

Scatter diagram

Buy Now
Questions 35

Which of the following modules will require the most test cases to ensure path coverage?

Options:

A.

Cyclomatic Complexity: 8, LOC: 100

B.

Cyclomatic Complexity: 10, LOC: 500

C.

Cyclomatic Complexity: 12, LOC: 100

D.

Cyclomatic Complexity: 20, LOC: 400

Buy Now
Questions 36

Which of the following sources is most likely to contain the information needed to propose a software correction?

Options:

A.

Physical configuration audit report

B.

Requirements traceability matrix

C.

Customer satisfaction survey

D.

Software problem report

Buy Now
Questions 37

Which of the following verification and validation techniques is used to verify that the completed requirements and designs conform to their requirements specifications?

Options:

A.

Feasibility analysis

B.

Execution of test cases

C.

Functional configuration audits

D.

Mathematical proofs of correctness

Buy Now
Questions 38

Which of the following statements is true about using branched development paths on a module?

Options:

A.

The delta of the module is decreased.

B.

The size of the code base is decreased.

C.

The maintenance of the module can be costly.

D.

The interface must be unique.

Buy Now
Questions 39

Which of the following describes when a test plan should be changed?

Options:

A.

After product stability has been assessed

B.

After changes to the design specifications

C.

After each code review

D.

When the configuration management tool is updated

Buy Now
Questions 40

Which of the following steps comes first during release planning for waterfall-type projects?

Options:

A.

Define the scope of the software being developed.

B.

Determine which problems will be corrected in the next release.

C.

Select the set of requirements that will be included in the release.

D.

Confirm the implemented software meets the specified requirements.

Buy Now
Questions 41

A software quality audit plan must include which of the following elements?

Options:

A.

Resource requirements

B.

Opening meeting minutes

C.

Corrective action reports

D.

Completed checklists

Buy Now
Questions 42

Which of the following inputs is used in software cost estimation models?

Options:

A.

Lines of code

B.

Number of users

C.

Age of the software

D.

Maintenance requirements

Buy Now
Questions 43

Test-driven development in extreme programming ensures the quality of code by

Options:

A.

defining test pass criteria before code is written

B.

defining what code modules will be tested

C.

having the testers determine the order in which code should be written

D.

having the code tested before the product is released

Buy Now
Questions 44

Project management has been complaining that code inspections are taking too much time and are not worth the effort. The software manager has to decide whether the inspection program should be continued or disregarded for the upcoming release. Which of the following factors is critical to the manager s decision?

Options:

A.

The resources currently available for development

B.

The estimated impact of inspection on the schedule

C.

The cost of additional testing

D.

The cost of not using inspection

Buy Now
Questions 45

Which of the following details should be included in a software configuration management plan?

Options:

A.

Potential changes to identified configuration items

B.

Configuration control board level of authority

C.

Programming language used for coding

D.

Software integration test baselines

Buy Now
Questions 46

At what point in the development lifecycle should change control be implemented?

Options:

A.

During the requirements phase

B.

During the implementation phase

C.

At the beginning of the design phase

D.

When the testing phase begins

Buy Now
Questions 47

As a side job: a trio of software quality ' engineers developed a database management system for XYZ, a non-competing company and subsequently packaged it for commercial sale as DBM Solutions. The engineers supervisor read about the new system in a trade magazine and asked the engineers for their opinion on whether to buy DBM Solutions. What would be the most appropriate way for the engineers to respond to this situation?

Options:

A.

Explain their role in developing the software and ask to be excused from participating in the purchase decision.

B.

Advise XYZ about their company ' s interest in the software and ask XYZ to make a presentation of the software

C.

Advise their supervisor to buy the software., based on the fact that the product will meet the company ' s requirements.

D.

Offer to examine the software, evaluate it with respect to the company’s requirements, and report on the findings

Buy Now
Questions 48

The software configuration management (SCM) planning process includes

Options:

A.

identifying; analyzing; and mitigating SCM risks

B.

establishing and documenting SCM policies for the organization

C.

monitoring the performance and effectiveness of SCM processes

D.

defining the specific SCM roles and responsibilities for the project

Buy Now
Questions 49

Ideas and exclusive rights for novel inventions can be protected for a limited time through

Options:

A.

patents

B.

copyrights

C.

license

D.

trademark

Buy Now
Questions 50

During an in-process audit of a development team, a software auditor discovers that a step is missing in the development process being used by the team. The absence of this step, which is not in the approved software development procedures and standards, has the potential for causing a product failure. Which of the following would be the most appropriate course of action for the auditor?

Options:

A.

Do not include the finding in the audit report since the step is not part of approved procedures.

B.

Immediately request that management approve an addition to the procedures so the finding can be included in the audit report.

C.

Include the finding in the audit report since part of the job of an auditor is to evaluate processes.

D.

File a finding separately from the audit report so that it will be included in the next audit of the development group.

Buy Now
Questions 51

When a product release is archived, which of the following information should be included in the archive?

Options:

A.

Defect tracking database

B.

Build environment and compilers

C.

Final version of documentation only

D.

The date the product was launched

Buy Now
Questions 52

Which of the following actions can a company take to reduce the risk associated with integrating a commercial off-the-shelf (COTS) spreadsheet package into its own software product?

Options:

A.

Require the vendor to adhere to the keens mg agreement for product fixes.

B.

Audit the vendor ' s quality- system.

C.

Require the vendor to place the object code into escrow.

D.

Test the product to determine whether it satisfies critical functions.

Buy Now
Questions 53

Which of the following software security requirements objectives is met by limiting access to the system through passwords?

Options:

A.

Supplying an audit trail

B.

Preserving data integrity

C.

Maintaining access control

D.

Providing backup and/or recovery

Buy Now
Questions 54

Which of the following statements is true about component reuse?

Options:

A.

The more a developer knows about the implementation, the more reusable a component will be.

B.

Information-hiding impedes the development of reusable components.

C.

Development costs are improved by reusable components.

D.

Modifying a previously used module is an example of module reuse.

Buy Now
Questions 55

Conflict in teams can be useful when it

Options:

A.

establishes decision-making patterns

B.

speeds decision-making

C.

produces new information

D.

focuses management s attention on the team

Buy Now
Questions 56

When a team is defining a software metrics program, which of the following steps must be taken first?

Options:

A.

Determine what data to collect.

B.

Collect preliminary data

C.

Establish the data collection goal.

D.

Select the metrics to report

Buy Now
Questions 57

A static analysis tool is used to

Options:

A.

ensure that the system meets customer expectations

B.

identify potential problems

C.

trace test cases

D.

improve the time to market

Buy Now
Questions 58

The highest risk associated with ambiguous requirements for requirements analysts is

Options:

A.

they may be checked through twice

B.

they are not compliant with ISO 9001

C.

their reviews may take longer than planned

D.

they will build the wrong software product

Buy Now
Questions 59

A sprint started with 354 requirements. As the sprint progressed, 14 requirements were introduced, 6 requirements were removed, and 28 requirements were changed. What was the requirements volatility for this sprint?

Options:

A.

8.8%

B.

11.9%

C.

13.5%

D.

15.7%

Buy Now
Questions 60

Which of the following statements is true about race conditions in real-time embedded systems?

Options:

A.

They are easy to replicate.

B.

They cannot occur in multi-processing systems.

C.

They can be detected during stress testing.

D.

They can first be detected during unit testing.

Buy Now
Questions 61

Which of the following items is an appropriate topic to be discussed in a daily scrum meeting?

Options:

A.

A product backlog item from the current sprint and move it to future sprints

B.

An impediment one of the team member was facing yesterday

C.

The list of all product backlog items that need to be addressed in current sprint

D.

A change in the product roadmap which impacts current future releases

Buy Now
Questions 62

When source code is compiled, which of the following information must be included as a configuration item?

Options:

A.

The compiler

B.

The staging area

C.

The object code listing

D.

The compiler diagnostics

Buy Now
Questions 63

An effective listener is defined as someone who

Options:

A.

forms a reply while the speaker is talking

B.

is attuned to nonverbal cues

C.

asserts opinions without fear

D.

draws parallels to other situations or times

Buy Now
Questions 64

During the requirements planning stage, management ' s responsibility is to

Options:

A.

provide effort estimates for implementation

B.

ensure that appropriate stakeholders are involved

C.

confirm customer requirements

D.

define the quality criteria for the project

Buy Now
Questions 65

In a Scrum project, who is responsible for determining the time estimates during the project?

Options:

A.

Scrum master

B.

Sponsor

C.

Project team

D.

Champion

Buy Now
Questions 66

A software quality engineer is managing a project to develop a new air traffic control system for a federal agency When conducting a stakeholder needs analysis., which of the following groups would be most important for eliciting criteria for the functional tests?

Options:

A.

Current air traffic controllers

B.

Investigators at the transportation safety board

C.

Key associations that represent pilots and ground crews

D.

Purchasing and finance representatives from the federal agency

Buy Now
Questions 67

A requirements change impact analysis should be performed when

Options:

A.

configuration items are placed under formal change control

B.

configuration items are marked as baselined

C.

a change has been approved by the change control board (CCB)

D.

a change is being reviewed by the change control board (CCB)

Buy Now
Questions 68

A software program’s property of being able to handle bad inputs is referred to as

Options:

A.

fail safe

B.

accuracy

C.

robustness

D.

fault forecasting

Buy Now
Questions 69

Virtualization is a technology that

Options:

A.

allows many logical computers to run on the same physical hardware

B.

is used when an application that runs in the cloud is offered as a service

C.

brings securing to the cloud by establishing the right privilege levels for users

D.

enables organizations to bridge the gap between identity access management and cloud services

Buy Now
Questions 70

Which of the following review meetings are held to examine aggregated performance information?

Options:

A.

Program

B.

Management

C.

Retrospectives

D.

Post implementation

Buy Now
Questions 71

Which of the following aspects of information systems is disaster recovery primarily concerned with protecting?

Options:

A.

Integrity

B.

Availability

C.

Authorization

D.

Confidentiality

Buy Now
Questions 72

One of the requirements in a software quality plan is to measure the average time software performs without a problem in a production environment during regular business hours under usual workload. This is an example of which of the following quality* attributes?

Options:

A.

Timeliness

B.

Availability

C.

Performance

D.

Reliability

Buy Now
Questions 73

One-to-one, one-to-many, and many-to-many are examples of which of the following data attributes as shown in an entity relationship diagram (ERD)?

Options:

A.

Modality

B.

Cardinality

C.

Complexity

D.

Hierarchy

Buy Now
Questions 74

Which of the following best defines the total cost of quality for a software project?

Options:

A.

Quality assurance and testing budgets

B.

Fixing defects and maintenance

C.

Prevention, appraisal, and failures

D.

Planning, designing, and testing

Buy Now
Questions 75

Which of the following baselines defines the list of prioritized, known stories at the beginning of each iteration?

Options:

A.

Release

B.

Allocated

C.

Developmental

D.

Product backlog

Buy Now
Questions 76

Which of the following benefits is related to DevOps when it is used to facilitate development activities?

Options:

A.

Reducing time to market

B.

Minimizing software releases

C.

Increasing return on investment

D.

Standardizing organizational processes

Buy Now
Questions 77

Which of the following characterizes a usability requirement?

Options:

A.

The number of software users

B.

The useful life of a system

C.

The variety of tasks a user can perform

D.

The ease of using a system

Buy Now
Questions 78

Which of the following software metrics is based on a nominal scale-1

Options:

A.

Root cause of defect, logic error data definition, etc

B.

Severing of a defect, critical, major, minor, etc.

C.

Defect density: number per function point, etc.

D.

Defect discovery rate: number detected per day, etc.

Buy Now
Questions 79

What type of technology- is designed to provide organizational partners with real-time access to information on a business-to-business architecture?

Options:

A.

Embedded system

B.

Encrypted email

C.

Extranet

D.

Internet

Buy Now
Questions 80

When a software system will be required to manage confidential information, the security protection mechanisms for the system should be designed so that

Options:

A.

the effort to penetrate the system costs more than the value of the information obtained

B.

passwords needed for system access must be changed on an annual basis and may not be reused

C.

passwords cannot be shared in the end-user environment

D.

users who do not have administrative rights are locked out of the system during non-working hours

Buy Now
Questions 81

In specifying a software requirement, it is important to consider how the requirement might be

Options:

A.

referenced

B.

documented

C.

coded

D.

validated

Buy Now
Questions 82

A quality audit program is an extension of which of the following organizational functions?

Options:

A.

Regulatory

B.

Top management

C.

Operations

D.

Finance

Buy Now
Questions 83

Which of the following baselines is typically established after completion and approval of system requirements?

Options:

A.

Product

B.

Allocated

C.

Functional

D.

Development

Buy Now
Questions 84

Which of the following actions would most effectively analyze the impact of new software quality objectives on existing process metrics?

Options:

A.

Reviewing the change logs of recent software updates

B.

Surveying user satisfaction after implementing new features

C.

Updating the software documentation to reflect new quality standards

D.

Comparing historical and current data to assess trends in quality metrics

Buy Now
Exam Code: CSQE
Exam Name: Certified Software Quality Engineer Exam
Last Update: Jun 20, 2026
Questions: 280

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now CSQE testing engine

PDF (Q&A)

$31.5  $104.99
buy now CSQE pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 20 Jun 2026