Big Cyber Monday Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

D-PST-OE-23 Dell PowerStore Operate 2023 Exam Questions and Answers

Questions 4

Which port is used to SSH from one Dell PowerStore appliance to another?

Options:

A.

22

B.

26

C.

443

D.

21

Buy Now
Questions 5

Refer to the exhibit.

D-PST-OE-23 Question 5

What type of cable is used for the ToR switch configuration shown for the S5248F-ON switches?

Options:

A.

10 GigE Cat 6 Ethernet RJ-45

B.

25 GigE Twinax

C.

100 GigE QSFP28

D.

10 GigE SFP optical cable

Buy Now
Questions 6

What is the reason for the best practice of leaving 2 Us of space at the bottom of the rack when racking Dell PowerStore systems?

Options:

A.

Provide better rack stability

B.

Provide cooling air intake

C.

Leave room for serviceability

D.

Leave clearance for wheel roll

Buy Now
Questions 7

A Storage Administrator notices a Major alert present in Dell PowerStore Manager relating to data protection. What action within the alert details slide-out panel is helpful in troubleshooting the data protection problem?

Options:

A.

View the Associated Events for earlier related alerts

B.

Examine Notifications to obtain a list of corrective actions

C.

Acknowledge the alert to clear and resolve the problem

D.

Access the Repair Flow link to schedule a support engagement

Buy Now
Questions 8

A Storage Administrator needs to add drives to a base enclosure of a Dell PowerStore 7000T system. The system currently contains 10 750 GB NVMe SCM drives.

Which drive configuration maximizes the base enclosure capacity?

Options:

A.

11 15360 GB NVMe SSD drives in slots 10 - 20

B.

13 15360 GB NVMe SSD drives in slots 10 - 22

C.

11 750 GB NVMe SCM drives in slots 10 - 20

D.

13 750 GB NVMe SCM drives in slots 10 - 22

Buy Now
Questions 9

The “svc_rescue_state list” shows a node in service mode. How can the node be returned to normal mode?

Options:

A.

svc_rescue_state normal

B.

svc_rescue_state clear

C.

svc_rescue_state exit

D.

svc_rescue_state quit

Buy Now
Questions 10

What describes the power requirements for Dell PowerStore?

Options:

A.

Lower model numbered systems require less AC line current than higher model numbered systems

B.

T models require less total power than X models

C.

X models require less total power than T models

D.

Lower model numbered systems require less input voltage (VAC) than higher model numbered systems

Buy Now
Questions 11

Refer to the exhibit.

D-PST-OE-23 Question 11

What is indicated when the circled LED on the node embedded module is illuminated solid amber?

Options:

A.

System is booting

B.

Module is faulted

C.

Node is faulted

D.

Cluster is uninitialized

Buy Now
Questions 12

A Storage Administrator wants to upgrade a two appliance Dell PowerStore cluster. Which Commit options need to be chosen to have all appliances upgraded in the last step?

Options:

A.

Appliance, Cluster

B.

Appliance, Appliance

C.

Cluster, Appliance

D.

Cluster, Cluster

Buy Now
Questions 13

What is the maximum number of base enclosures in a cluster when planning a Dell PowerStore T installation?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 14

How is a defective embedded module displayed in Dell PowerStore Manager?

Options:

A.

Orange with an empty state

B.

Orange with a faulted state

C.

Blue with a faulted state

D.

Blue with an empty state

Buy Now
Questions 15

Which LED combination shows a connected and working node?

Options:

A.

power LED: steady green fault LED: amber

B.

power LED: blinking green fault LED: off

C.

power LED: blinking green fault LED: blue

D.

power: LED: steady green fault LED: off

Buy Now
Questions 16

What describes Dell PowerStore X power down?

Options:

A.

PowerStore X node, appliance, or cluster power down is done entirely with vCenter server commands

B.

Powering down a PowerStore X node, appliance, or cluster is done in the same manner as a PowerStore T

C.

PowerStore X node, appliance, or cluster power down utilizes the VSi plugin to perform the needed vCenter server operations

D.

Powering down a PowerStore X node, appliance, or cluster requires additional vCenter server commands

Buy Now
Questions 17

Refer to the exhibit.

D-PST-OE-23 Question 17

A Storage Administrator noticed a drive LED blinking blue. What does this indicate?

Options:

A.

Is faulted

B.

Access activity

C.

Power up

D.

Identification is on

Buy Now
Questions 18

How is a service laptop IP configured to connect to the Service LAN port of a Dell PowerStore node?

Options:

A.

Static IP: 128.221.1.249 and netmask: 255.255.255.0

B.

Obtain IP address from DHCP on PowerStore

C.

Static IP: 169.254.1.249 and netmask: 255.0.0.0

D.

Leave IP address and netmask unconfigured

Buy Now
Questions 19

Refer to the exhibit.

D-PST-OE-23 Question 19

Which column indicates the master appliance?

Options:

A.

IP Address

B.

Model

C.

Service Tag

D.

Mode

Buy Now
Questions 20

Which Dell PowerStore model reserves the last two slots of the base enclosure for NVMe NVRAM?

Options:

A.

3000

B.

5000

C.

7000

D.

9000

Buy Now
Questions 21

What does the output of the PSTCLI command “nas_server show” display from a Dell PowerStore T?

Options:

A.

If NAS servers are present if they are either NFS or Licensed

B.

Memory utilization and thread count for NFS NAS servers

C.

If NAS servers are present and if they are either Started or Degraded

D.

SIDs of SMB NAS servers joined to the AD Domain

Buy Now
Questions 22

What describes Dell PowerStore heat dissipation?

Options:

A.

X systems have higher heat dissipation specifics than T systems

B.

Higher model numbered systems have lower heat dissipation specifications than lower model numbered systems

C.

T systems have higher heat dissipation specifics than X systems

D.

Lower model numbered systems have lower heat dissipation specifications than higher model numbered systems

Buy Now
Questions 23

A Storage Administrator needs to connect through SSH to run svc commands. How is the SSH session configured?

Options:

A.

Appliance IP address using port 22

B.

NAS server IP address using port 26

C.

NAS server IP address using port 22

D.

Appliance IP address using port 26

Buy Now
Questions 24

How is a defective DIMM displayed in Dell PowerStore Manager?

Options:

A.

Orange with an empty state

B.

Blue with a faulted state

C.

Orange with a faulted state

D.

Blue with an empty state

Buy Now
Questions 25

For what is the “svc_container_mgmt status CP” command used?

Options:

A.

Clears the Control Path audit log

B.

Resets the Data Path root access

C.

Checks the status of the Control Path

D.

Checks the status of the Data Path

Buy Now
Questions 26

What is the result of setting a VLAN ID of 0 on a network when running ICW for Dell PowerStore?

Options:

A.

Network will pass tagged traffic

B.

Static route is set

C.

Network will pass untagged traffic

D.

Default route is set

Buy Now
Questions 27

What is a step in configuring the ToR data switches for a Dell PowerStore T?

Options:

A.

Configure a port for the discovery laptop

B.

Create VLANs for NAS servers

C.

Create VLAN for vMotion networks

D.

Configure ports for management on native VLAN

Buy Now
Questions 28

What does the output of the command “svc_diag list --basic” show?

Options:

A.

Failover status

B.

Master_appliance_ID

C.

License status

D.

Boot mode

Buy Now
Exam Code: D-PST-OE-23
Exam Name: Dell PowerStore Operate 2023 Exam
Last Update: Dec 7, 2025
Questions: 96

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now D-PST-OE-23 testing engine

PDF (Q&A)

$31.5  $104.99
buy now D-PST-OE-23 pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 07 Dec 2025