FusionDC1000A's anti-seismic rating reaches _____.

Options:

A.

9

B.

10

C.

12

D.

11

Buy Now
Questions 5

The FusionModule500 uses the typical configuration mode, with core components preinstalled at the factory. How long does it take to roll out services on site?

Options:

A.

2 days

B.

1 day

C.

4 hours

D.

3 days

Buy Now
Questions 6

Which of the following product information is available on the configuration result page?

Select All that Apply.

Options:

A.

Description

B.

Code

C.

List price

D.

Model

Buy Now
Questions 7

Which of the following is not a recommended display range on the Configuration Result tab page?

Options:

A.

Quantity = 0

B.

Quantity > 0

C.

Quantity > 0 + Manual modification

D.

Manual modification

Buy Now
Questions 8

What is the internal cooling system’s temperature-control range for the FusionDC1000A-40ft?

Options:

A.

17°C to 26°C

B.

16°C to 25°C

C.

18°C to 27°C

D.

19°C to 28°C

Buy Now
Questions 9

ECC800-Pro serves as the local monitoring system for FusionModule2000.

Options:

A.

True

B.

False

Buy Now
Questions 10

The installation height requirement for the FusionModule2000 is greater than 2.6 m.

Options:

A.

True

B.

False

Buy Now
Questions 11

The project delivery site must have suitable fire-extinguishing facilities. A complete emergency plan must be prepared before the project begins. An emergency drill must be completed before the project is formally handed over.

Options:

A.

True

B.

False

Buy Now
Questions 12

What is the height of the 30kVA power module in the integrated Modular UPS of FusionDC1000A-40ftIT?

Options:

A.

1U

B.

2U

C.

3U

D.

4U

Buy Now
Questions 13

FusionDC1000A-40ft includes ASD early smoke detection as a standard feature.

Options:

A.

True

B.

False

Buy Now
Questions 14

Which of the following verification outcomes does not affect BOQ submission?

Options:

A.

Controlled part

B.

EOP part

C.

Configuration error

D.

Alarm configuration [intended: configuration warning]

Buy Now
Questions 15

When using Meta CPQ for the first time, you must apply for an account and the associated permissions.

Options:

A.

True

B.

False

Buy Now
Questions 16

According to the training materials, construction-site safety management can be classified into __________.

Select All that Apply.

Options:

A.

Safety technology management

B.

Site and facility management

C.

Safety organization management

D.

Behavior control

Buy Now
Questions 17

Which features are included in the cooling system of the FusionDC1000A-40ft-IT?

Select All that Apply.

Options:

A.

Wet film humidification

B.

Row-level cooling

C.

"0" Condensation Risk

Buy Now
Questions 18

When using the SCT configurator for the first time, first apply for an account and the required permission.

Options:

A.

True

B.

False

Buy Now
Questions 19

Crosby introduced the zero-defect (ZD) concept.

Options:

A.

True

B.

False

Buy Now
Questions 20

What is the maximum power capacity of a single FusionModule500 module?

Options:

A.

6kW

B.

3kW

C.

10kW

D.

25kW

Buy Now
Questions 21

The total IT capacity for the IT scenario of FusionDC1000A is __________ kW.

Options:

A.

30

B.

60

C.

100

D.

54

Buy Now
Questions 22

What features and values does FusionDC1000A have?

Select All that Apply.

Options:

A.

Efficient

B.

Simple

C.

Reliable

Buy Now
Questions 23

Which of the following statements regarding FusionModule800 is incorrect?

Options:

A.

FusionModule800 is suitable for small-scale data center scenarios. It only supports N+l power distribution and does not support 2N power distribution architecture.

B.

The FusionModule800 supports optional built-in fire suppression modules, eliminating the need for fire protection system reconstruction.

C.

FusionModule800 supports IT loads ≤ 40 kW.

Buy Now
Questions 24

Which of the following systems should be included in a complete data center?

Select All that Apply.

Options:

A.

Monitoring system

B.

Power system

C.

Cooling system

Buy Now
Questions 25

Huawei FusionModule800 primarily comprises a converged cabinet, an IT cabinet, and a battery cabinet/rack. The converged cabinet combines monitoring, cooling, and UPS components.

Options:

A.

True

B.

False

Buy Now
Questions 26

In the FusionDC1000A-40ft N+X scenario, the UPS supports two ATS inputs and has a maximum power capacity of 60 kVA (with 2+0 redundancy).

Options:

A.

True

B.

False

Buy Now
Questions 27

Which of the following Sparts can be ordered through the SCT?

Options:

A.

EOS (End of Service & Support) Spart

B.

Prohibited Spart

C.

EOP (End of Production) Spart

D.

Not EOM (End of Marketing) Spart

Buy Now
Questions 28

A quotation in the SCT can be created in two ways: create a quote from the shopping cart using the selected products, or create a blank quotation directly.

Options:

A.

True

B.

False

Buy Now
Questions 29

Which of the following is included among the service configuration types offered by Meta CPQ?

Options:

A.

Maintenance service

B.

Implementation service

C.

Supervision service

D.

All of the above

Buy Now
Questions 30

In FusionModule800 5.0, the air conditioner uses electrode humidification for humidifying.

Options:

A.

True

B.

False

Buy Now
Questions 31

To obtain total product volume and weight details for the SCT BOQ, to which business can you submit the BOQ?

Options:

A.

Logistics Estimation

B.

SPQ

C.

Manual Review (Export DB)

D.

Service Compliance

Buy Now
Exam Code: H19-132_V1.0
Exam Name: HCSA-Presales-Data Center Facility (Modular DC) V1.0
Last Update: Nov 19, 2026
Questions: 106

PDF + Testing Engine

$42.5  $169.99

Testing Engine

$32.5  $129.99
buy now H19-132_V1.0 testing engine

PDF (Q&A)

$27.5  $109.99
buy now H19-132_V1.0 pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 19 Nov 2026