HPE0-S58 Implementing HPE ComposableInfrastructure Solutions Questions and Answers

Questions 4

A customer discovered performance issues with one of the volumes used by an application.

An integrator recommended changing the RAID level for this volume from RAID6 to RAID5 by moving this volume to a different CPG.

Click the option that will start this operation.

HPE0-S58 Question 4

Options:

Buy Now
Questions 5

A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.

Which procedure should the integrator use to address the customer’s concern?

Options:

A.

Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer’s management network.

B.

Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer’s management network.

C.

Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer’s management network.

D.

Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer’s management network using two uplinks.

Buy Now
Questions 6

A customer has a five-frame Synergy deployment with redundant Composers. An integrator needs to install Image Streamer.

What must the integrator consider before taking the planned action?

Options:

A.

Image Streamer requires the use of the MGMT port from both of the FLMs in the frame where the Image Streamer appliance is installed

B.

The frame where the Image Streamer is being installed must not contain an Interconnect Module

C.

The location of the Image Streamer must be manually modified through the Composer

D.

A connection to the management network must be established to an FLM in the same frame that houses the Image Streamer

Buy Now
Questions 7

A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool.

How should the integrator set up the management of the datacenter?

Options:

A.

Add two frames from the remote datacenter as remote enclosures using existing Composer

B.

Install one Composer in every frame in both local and remote datacenter

C.

Deploy one Composer in each site and link them together

D.

Connect the management links with fibre cables if the distance between datacenters is more than 500m

Buy Now
Questions 8

Which HPE Synergy D3940 storage module configuration is valid?

Options:

A.

a single RAID set to be shared across the SAS fabric to multiple compute nodes as a virtualization host datastore

B.

maximum of three HPE Synergy D3940 storage modules per frame to be used by any compute module within the management ring

C.

any number of the drives from storage module to be mapped to any single compute node

D.

a pair of disks to house Composer backups and Synergy firmware bundles

Buy Now
Questions 9

An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.

Which configuration steps must the integrator perform to provide the customer with this functionality?

Options:

A.

Enable Remote Support and Insight Online Integration in the Composer UI

B.

Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard

C.

Configure OneView with iLO Amplifier pack

D.

Activate iLO Federation on all installed compute nodes

Buy Now
Questions 10

A Synergy integrator is creating a network that needs to be connected from the Virtual Connect SE 40Gb F8 module to a Fibre Channel (FC) Switch.

Which network type should the integrator select during the network creation task?

Options:

A.

Ethernet

B.

FC over iSCSI

C.

FC over Ethernet

D.

FC

Buy Now
Questions 11

An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment.

Click where the integrator should verify that the cabling for the management ring was completed correctly.

HPE0-S58 Question 11

Options:

Buy Now
Questions 12

An integrator is modifying the network uplink configuration of a Synergy environment that uses HPE Synergy 40Gb F8 Switch Modules for connectivity.

What must the integrator do to make the necessary modifications?

Options:

A.

Connect to the switch module using CLI and run the necessary configuration commands

B.

Connect keyboard, monitor, and mouse to the Frame Link module, and run the network configuration wizard

C.

Connect to HPE OneView running on the Composer module to modify the Logical Interconnect Group (LIG) configuration

D.

Connect to the end-of-row (EoR) switches, and push the configuration to the switch modules

Buy Now
Questions 13

An integrator is validating an HPE Synergy solution design for a customer that has the following requirements:

  • 20 half-height compute modules
  • 2x 20Gb connectivity to each compute module
  • single fabric domain for LAN and SAN connectivity
  • single management network for managing the solution
  • no single point of failure

The compute modules boot from a 3PAR array connected to the Synergy Interconnect modules through a pair of Brocade Fibre Channel switches.

Which components must be part of the solution? (Choose two.)

Options:

A.

four HPE Synergy FC SE 40Gb F8 modules

B.

two HPE Synergy Composes

C.

two Frame Link Modules in each HPE Synergy 12000 Frame

D.

two HPE Synergy Image Streamers

E.

redundant Frame Link Module Front Panel

Buy Now
Questions 14

HPE0-S58 Question 14

A customer has received a second frame for their HPE Synergy environment. The customer has added the second frame to the rack and correctly cabled the power and management ring.

Based on the design shown, which changes need to be made to the configuration to ensure high availability? (Choose two.)

Options:

A.

Split the management uplinks across both frames

B.

Configure high availability in vCenter for the HPE OneView appliance

C.

Configure high availability on the Frame Link Modules

D.

Enable high availability in the Settings of the Composer

E.

Move one of the Composers to the second frame

Buy Now
Exam Code: HPE0-S58
Exam Name: Implementing HPE ComposableInfrastructure Solutions
Last Update: Nov 30, 2023
Questions: 97
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 19 Apr 2024