Questions 4

TGY Ltd is a manufacturing organisation which produces five major components for use in the transport sector. Each component is produced by a different Project Team. Below are details of the five projects.

Project 1: The team are looking at where the material originates and how much of this natural resource is left in the ground.

Project 2: The team are focused on what happens when the product is no longer required by the customer and whether the product can be repurposed to save it going to landfill.

Project 3: The team are keen to ensure the customer is happy with the product and that it meets safety standards. The focus of the Life Cycle Analysis is on what happens inside the factory.

Project 4: The team are looking at the longevity of the item once purchased by the customer.

Project 5: The team are exploring the additional overhead costs associated with the production of the item and the way in which the item is produced.

Complete the table below by listing the area of life cycle analysis being looked at, and the area of the Balanced Scorecard this relates to (some options may be used twice); energy consumption, use, disassembly, extraction, manufacturing, transportation, sustainability x2, quality, environment, value for money, processes.

Which of the following will you put into box 5?

Options:

A.

energy consumption

B.

use

C.

disassembly

D.

extraction

E.

manufacturing

F.

transportation

Buy Now
Questions 5

Which of the following technologies creates physical objects, reduces a company ' s carbon footprint and saves on costs over traditional manufacturing processes?

Options:

A.

robotics

B.

open source software

C.

3D printing

D.

Artificial intelligence

Buy Now
Questions 6

TGY Ltd is a manufacturing organisation which produces five major components for use in the transport sector. Each component is produced by a different Project Team. Below are details of the five projects.

Project 1: The team are looking at where the material originates and how much of this natural resource is left in the ground.

Project 2: The team are focused on what happens when the product is no longer required by the customer and whether the product can be repurposed to save it going to landfill.

Project 3: The team are keen to ensure the customer is happy with the product and that it meets safety standards. The focus of the Life Cycle Analysis is on what happens inside the factory.

Project 4: The team are looking at the longevity of the item once purchased by the customer.

Project 5: The team are exploring the additional overhead costs associated with the production of the item and the way in which the item is produced.

Complete the table below by listing the area of life cycle analysis being looked at, and the area of the Balanced Scorecard this relates to (some options may be used twice); energy consumption, use, disassembly, extraction, manufacturing, transportation, sustainability x2, quality, environment, value for money, processes.

Which of the following will you put into box 10?

Options:

A.

sustainability

B.

quality

C.

environment

D.

value for money

E.

processes

Buy Now
Questions 7

Which of the following is a common approach to statistical analysis which uses the application of statistical methods in decision making?

Options:

A.

operations research

B.

statistical programming

C.

econometrics

D.

statistical quality improvements

Buy Now
Questions 8

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 8?

Options:

A.

power

B.

trust

C.

co-operation

D.

communication

E.

commitment

F.

transparency

Buy Now
Questions 9

Jonah is looking at the relationship his organisation has with various suppliers. He is keen to work with a supplier on an upcoming project which is of high risk and requires a high degree of supplier responsibility. For this he is looking to select the right supplier. What type of development is this?

Options:

A.

arm ' s length development

B.

critical development

C.

routine development

D.

strategic development

Buy Now
Questions 10

In what situations would a procurement professional use an e-auction? Select all that apply

Options:

A.

to negotiate a price with a supplier

B.

to make a spot purchase

C.

to renew an existing contract

D.

tendering of a research project

E.

early supplier engagement on a new project

Buy Now
Questions 11

Below are details of 5 companies who are all embarking on the launch of a new product. For each company, you must decide which innovation tactic they are using and the priority for the new contract.

Company 1: The company aims to design the specification around customers’ requirements. They are keen to ensure a balance between costs and the service provided.

Company 2: This company attends regular conferences held by a professional body and will use the information discussed to inform upon the specification. They are keen to ensure sufficient interest from the marketplace so are placing a priority on networking at the conferences.

Company 3: There is a small group of internal stakeholders who meet regularly at Company 3 who discuss supply chain and organisational integration. The priority for the group is to ensure that the supplier of the new product’s raw materials meets the company’s standards for environmental protection.

Company 4: This company has regular phone calls with suppliers discussing ideas for the new product. Once the product is launched, the focus will be on ensuring that the supplier is held to account.

Company 5: Equipment has been loaned to a supplier to produce a prototype of the new product. The aim of the project is to ensure the supplier is capable of producing the components required for the product before the contract is signed.

Complete the table below by listing the innovation tactic and contract priority for each company; focus group, innovation council, technology transfer, collaboration, supplier forum, early supplier involvement, supplier development, balanced scorecard, contract management, selection, value for money, bidding.

Which of the following will you put into box 10?

Options:

A.

supplier development

B.

balanced scorecard

C.

contract management

D.

selection

E.

value for money

F.

bidding

Buy Now
Questions 12

What are the benefits of early supplier involvement? Select all that apply.

Options:

A.

information sharing

B.

higher levels of innovation

C.

better environmental protection

D.

smaller supply chains

Buy Now
Questions 13

Which of the following ISO Standards can a company NOT be certified against?

Options:

A.

ISO 14001

B.

ISO 14040

C.

ISO 20400

D.

ISO 27000

Buy Now
Questions 14

Below are details of five different companies and the data they collect. For each company, select the characteristic of the data collected and the business area it relates to.

Company 1: This company is collecting data which will assist in the designing of products- ensuring functionality at the lowest cost. The issue with the data is its seasonality.

Company 2: This company has a high number of data files. They are dismantling current ways of working to figure out if there is a more effective way to do things.

Company 3: Data collected by company 3 is collected at speed in real time. They are attempting to find any underlying patterns in the data to inform on better decision making.

Company 4: Company 4’s objective is to reduce the risk of exposure of the company to unforeseen events. Data is being collected in many different formats.

Company 5: This data is similar in format and content but is collected from a wide range of sources. The data looks at the costs and implications of raw materials used in production.

Complete the table below by listing the characteristic of the data and the corresponding business area (some options may be used twice); volume (x2), variety, velocity, variability, complexity, concurrent engineering, process design, statistical analysis, life cycle analysis, risk reduction, value engineering.

Which of the following will you put into box 4?

Options:

A.

volume

B.

variety

C.

velocity

D.

variability

E.

complexity

Buy Now
Questions 15

Pink Logistics is categorising the relationships it has with several suppliers. They have worked with Blue Trucks Ltd for seven years but the contract is of small value and therefore of little importance to Pink Logistics. There have been no issues of conflict during the lifetime of the contract and the relationship is transactional. According to the Relationship Interaction Matrix, how would the relationship between Pink Logistics and Blue Trucks Ltd best be characterised?

Options:

A.

nice

B.

marginal

C.

creative

D.

hostile

Buy Now
Questions 16

Below are details of five different companies and the data they collect. For each company, select the characteristic of the data collected and the business area it relates to.

Company 1: This company is collecting data which will assist in the designing of products- ensuring functionality at the lowest cost. The issue with the data is its seasonality.

Company 2: This company has a high number of data files. They are dismantling current ways of working to figure out if there is a more effective way to do things.

Company 3: Data collected by company 3 is collected at speed in real time. They are attempting to find any underlying patterns in the data to inform on better decision making.

Company 4: Company 4’s objective is to reduce the risk of exposure of the company to unforeseen events. Data is being collected in many different formats.

Company 5: This data is similar in format and content but is collected from a wide range of sources. The data looks at the costs and implications of raw materials used in production.

Complete the table below by listing the characteristic of the data and the corresponding business area (some options may be used twice); volume (x2), variety, velocity, variability, complexity, concurrent engineering, process design, statistical analysis, life cycle analysis, risk reduction, value engineering.

Which of the following will you put into box 10?

Options:

A.

concurrent engineering

B.

process design

C.

statistical analysis

D.

life cycle analysis

E.

risk reduction

F.

value engineering

Buy Now
Questions 17

Below are details of 5 companies who are all embarking on the launch of a new product. For each company, you must decide which innovation tactic they are using and the priority for the new contract.

Company 1: The company aims to design the specification around customers’ requirements. They are keen to ensure a balance between costs and the service provided.

Company 2: This company attends regular conferences held by a professional body and will use the information discussed to inform upon the specification. They are keen to ensure sufficient interest from the marketplace so are placing a priority on networking at the conferences.

Company 3: There is a small group of internal stakeholders who meet regularly at Company 3 who discuss supply chain and organisational integration. The priority for the group is to ensure that the supplier of the new product’s raw materials meets the company’s standards for environmental protection.

Company 4: This company has regular phone calls with suppliers discussing ideas for the new product. Once the product is launched, the focus will be on ensuring that the supplier is held to account.

Company 5: Equipment has been loaned to a supplier to produce a prototype of the new product. The aim of the project is to ensure the supplier is capable of producing the components required for the product before the contract is signed.

Complete the table below by listing the innovation tactic and contract priority for each company; focus group, innovation council, technology transfer, collaboration, supplier forum, early supplier involvement, supplier development, balanced scorecard, contract management, selection, value for money, bidding.

Which of the following will you put into box 3?

Options:

A.

focus group

B.

innovation council

C.

technology transfer

D.

collaboration

E.

supplier forum

F.

early supplier involvement

Buy Now
Questions 18

Mohammed has recently been hired as the new CEO of ABC Ltd, a large manufacturing organisation. The organisation has struggled in recent years due to the highly competitive nature of the marketplace and Mohammed has been brought in to radically change the organisation’s approach to procurement and supply chain management.

Traditionally the organisation has dictated its requirements to suppliers with stringent penalty clauses for non-compliance. Mohammed is keen to change this approach and leverage the knowledge of suppliers to ABC’s advantage.

XYZ is the main supplier to ABC Ltd and Mohammed has set up a meeting to discuss the relationship and contract currently in place. He wishes the relationship to be win-win and wishes to share ideas on potential efficiencies that can be gained for both organisations. He will propose a new mechanism for monitoring the performance of the contract based on four key parameters; cost, customer satisfaction, innovation and operational processes.

XYZ provides raw materials such as iron and steel and Mohammed is keen to gain an understanding of the environmental impact of the extraction, transportation and usage of these materials, the findings of which will impact the company’s mission statement, which will be re-written next year.

In terms of other suppliers, where spend is minimal and risk is low, Mohammed plans to introduce Standard Operating Procedures for the procurement of supplies and is looking into various tools which will save the procurement team time and money.

What type of analysis will Mohammed complete following his meeting with XYZ Ltd?

Options:

A.

stakeholder analysis

B.

market analysis

C.

life-cycle analysis

D.

financial analysis

Buy Now
Questions 19

An ' Enterprise Service Bus ' is an example of which of the following, which is a tool that may be used by the procurement professional?

Options:

A.

system integration tool

B.

data analytics tool

C.

e-procurement tool

D.

forecasting tool

Buy Now
Questions 20

What are the four key performance outcome themes of a Joint Performance Appraisal Framework?

Options:

A.

cost, quality, lead times, flexibility

B.

finance, productivity, flexibility, quality

C.

cost, customer service, quality, time

D.

productivity, customer service, finance, value

Buy Now
Questions 21

The engineering process in which each function completes the task they are specialised in then passes it to the next team is commonly known as what process?

Options:

A.

Lean engineering

B.

Simultaneous Engineering

C.

Over-the-Wall Engineering

D.

Business Process Re-Engineering

Buy Now
Questions 22

Pink Leaf Inc is attempting to make its products more eco-friendly. Which of the following areas would be a good idea for Pink Leaf to focus on?

Options:

A.

Attaining ISO14001

B.

Design for Disassembly

C.

Insuring products have a high ecological rucksack

D.

Using raw materials which have a high embodied energy

Buy Now
Questions 23

The Plan-Do-Check-Act cycle provides a Framework for an organisation to follow under which ISO standard?

Options:

A.

ISO 14001

B.

ISO 14040

C.

ISO 20400

D.

ISO 27000

Buy Now
Questions 24

New product development is vital for organisations which operate in which type of marketplace?

Options:

A.

a marketplace with a high level of commoditisation

B.

a monopoly

C.

a marketplace with low barriers to exit

D.

a marketplace with low competitive rivalry

Buy Now
Questions 25

Horizontal integration within an organisation ensures that project activities completed within each department are aligned with the organisation ' s strategic objectives. Is this sentence TRUE?

Options:

A.

yes- this prevents projects using up resources which are not focused on helping the organisation achieve its goals

B.

yes- all departments ' objectives are aligned to ensure everyone is working towards the same goals

C.

no- this describes vertical integration

D.

no- this describes the role of an innovation council

Buy Now
Questions 26

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 7?

Options:

A.

power

B.

trust

C.

co-operation

D.

communication

E.

commitment

F.

transparency

Buy Now
Questions 27

Paula is the Financial Controller for a Consultancy Organisation which operates in the Charity Sector. She is in the process of implementing a spend analysis with the aim to have a higher level of visibility over the company ' s financial data. Which of the following would this allow Paula to do?

Options:

A.

internal benchmarking

B.

eliminate supply chain risks

C.

improve supplier performance

D.

reduce waste

Buy Now
Questions 28

Mohammed has recently been hired as the new CEO of ABC Ltd, a large manufacturing organisation. The organisation has struggled in recent years due to the highly competitive nature of the marketplace and Mohammed has been brought in to radically change the organisation’s approach to procurement and supply chain management.

Traditionally the organisation has dictated its requirements to suppliers with stringent penalty clauses for non-compliance. Mohammed is keen to change this approach and leverage the knowledge of suppliers to ABC’s advantage.

XYZ is the main supplier to ABC Ltd and Mohammed has set up a meeting to discuss the relationship and contract currently in place. He wishes the relationship to be win-win and wishes to share ideas on potential efficiencies that can be gained for both organisations. He will propose a new mechanism for monitoring the performance of the contract based on four key parameters; cost, customer satisfaction, innovation and operational processes.

XYZ provides raw materials such as iron and steel and Mohammed is keen to gain an understanding of the environmental impact of the extraction, transportation and usage of these materials, the findings of which will impact the company’s mission statement, which will be re-written next year.

In terms of other suppliers, where spend is minimal and risk is low, Mohammed plans to introduce Standard Operating Procedures for the procurement of supplies and is looking into various tools which will save the procurement team time and money.

What approach to specification writing is Mohammed suggesting?

Options:

A.

input specification

B.

conformance specification

C.

output specification

D.

technical specification

Buy Now
Questions 29

Below are details of 5 companies who are all embarking on the launch of a new product. For each company, you must decide which innovation tactic they are using and the priority for the new contract.

Company 1: The company aims to design the specification around customers’ requirements. They are keen to ensure a balance between costs and the service provided.

Company 2: This company attends regular conferences held by a professional body and will use the information discussed to inform upon the specification. They are keen to ensure sufficient interest from the marketplace so are placing a priority on networking at the conferences.

Company 3: There is a small group of internal stakeholders who meet regularly at Company 3 who discuss supply chain and organisational integration. The priority for the group is to ensure that the supplier of the new product’s raw materials meets the company’s standards for environmental protection.

Company 4: This company has regular phone calls with suppliers discussing ideas for the new product. Once the product is launched, the focus will be on ensuring that the supplier is held to account.

Company 5: Equipment has been loaned to a supplier to produce a prototype of the new product. The aim of the project is to ensure the supplier is capable of producing the components required for the product before the contract is signed.

Complete the table below by listing the innovation tactic and contract priority for each company; focus group, innovation council, technology transfer, collaboration, supplier forum, early supplier involvement, supplier development, balanced scorecard, contract management, selection, value for money, bidding.

Which of the following will you put into box 9?

Options:

A.

supplier development

B.

balanced scorecard

C.

contract management

D.

selection

E.

value for money

F.

bidding

Buy Now
Questions 30

When should you introduce mention of supplier innovation to a supplier?

Options:

A.

supplier appraisal

B.

tender documents

C.

contract signing

D.

performance management meeting

Buy Now
Questions 31

Which of the following are benefits of using a cross-functional team in the procurement and supply function? Select all that apply

Options:

A.

increases the opportunity to make high-quality decisions

B.

reduces costs of procurement

C.

helps to confirm the accuracy of information

D.

provides a diversity of views

E.

ensures on-time delivery of goods and services

Buy Now
Questions 32

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 5?

Options:

A.

nice

B.

creative

C.

marginal

D.

hostile

E.

partnership

F.

arm ' s-length

Buy Now
Questions 33

Below are details of 5 companies who are all embarking on the launch of a new product. For each company, you must decide which innovation tactic they are using and the priority for the new contract.

Company 1: The company aims to design the specification around customers’ requirements. They are keen to ensure a balance between costs and the service provided.

Company 2: This company attends regular conferences held by a professional body and will use the information discussed to inform upon the specification. They are keen to ensure sufficient interest from the marketplace so are placing a priority on networking at the conferences.

Company 3: There is a small group of internal stakeholders who meet regularly at Company 3 who discuss supply chain and organisational integration. The priority for the group is to ensure that the supplier of the new product’s raw materials meets the company’s standards for environmental protection.

Company 4: This company has regular phone calls with suppliers discussing ideas for the new product. Once the product is launched, the focus will be on ensuring that the supplier is held to account.

Company 5: Equipment has been loaned to a supplier to produce a prototype of the new product. The aim of the project is to ensure the supplier is capable of producing the components required for the product before the contract is signed.

Complete the table below by listing the innovation tactic and contract priority for each company; focus group, innovation council, technology transfer, collaboration, supplier forum, early supplier involvement, supplier development, balanced scorecard, contract management, selection, value for money, bidding.

Which of the following will you put into box 5?

Options:

A.

focus group

B.

innovation council

C.

technology transfer

D.

collaboration

E.

supplier forum

F.

early supplier involvement

Buy Now
Questions 34

Swift Manufacturing is currently seeking new suppliers to create a new product that will be launched next year. They are keen to enter a new market and expand their customer base and ensure the new product provides value for money to the customer. The procurement department is currently conducting market research which will inform upon possible designs for the new product.

Simultaneously they are also speaking with suppliers regarding the specification. Swift Manufacturing are keen to ensure the new product is as environmentally friendly as possible, so are researching different raw materials that can be used and their impact upon the environment.

When designing the tender process, Swift Manufacturing would like the successful supplier to have an environmental management system in place and will incorporate this as part of the ‘essential criteria’ of the specification and tested on the PQQ stage of the tender.

It is important for the CEO of Swift Manufacturing that the supplier hits the ground running on this contract as soon as it is signed, given the importance of the new product to the organisation’s competitive advantage strategy. He is therefore keen to ensure that the procurement department include strict performance targets within the contract.

For the tender, which of the following standards should be mandated?

Options:

A.

ISO 9001

B.

ISO 14001

C.

ISO 14040

D.

ISO 27000

Buy Now
Questions 35

Swift Manufacturing is currently seeking new suppliers to create a new product that will be launched next year. They are keen to enter a new market and expand their customer base and ensure the new product provides value for money to the customer. The procurement department is currently conducting market research which will inform upon possible designs for the new product.

Simultaneously they are also speaking with suppliers regarding the specification. Swift Manufacturing are keen to ensure the new product is as environmentally friendly as possible, so are researching different raw materials that can be used and their impact upon the environment.

When designing the tender process, Swift Manufacturing would like the successful supplier to have an environmental management system in place and will incorporate this as part of the ‘essential criteria’ of the specification and tested on the PQQ stage of the tender.

It is important for the CEO of Swift Manufacturing that the supplier hits the ground running on this contract as soon as it is signed, given the importance of the new product to the organisation’s competitive advantage strategy. He is therefore keen to ensure that the procurement department include strict performance targets within the contract.

What is the main focus of the specification for the new product?

Options:

A.

cost

B.

quality

C.

compliance

D.

life-cycle analysis

Buy Now
Questions 36

When using a Balanced Scorecard as a management tool to judge the performance of a supplier, the following criteria are always used; financial, internal business processes, customer, learning and growth. Is this TRUE?

Options:

A.

yes- the balanced scorecard assesses the ' value added ' from supplier relationships

B.

yes- the balanced scorecard uses both hard and soft criteria to measure supplier performance

C.

no - the balanced scorecard does not measure the performance of a supplier

D.

no- the criteria used can be changed depending on the relevance to the organisation

Buy Now
Exam Code: L6M8
Exam Name: Innovation in Procurement and Supply
Last Update: Nov 21, 2026
Questions: 120

PDF + Testing Engine

$42.5  $169.99

Testing Engine

$32.5  $129.99
buy now L6M8 testing engine

PDF (Q&A)

$27.5  $109.99
buy now L6M8 pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 22 Nov 2026