Summer Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

MB-335 Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Questions and Answers

Questions 4

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Route card journal

B.

Standard production order update

C.

Handheld warehouse device

D.

Job card journal

E.

Report as finished journal

Buy Now
Questions 5

You need to create the production orders for standard model bicycles.

Which method should you use?

Options:

A.

Sales order line

B.

Master planning execution

C.

Supply schedule form

D.

Released item

E.

All production orders form

Buy Now
Questions 6

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Buy Now
Questions 7

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Buy Now
Questions 8

You need to create production orders for the new summer limited-edition bicycles.

How should they be created? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 8

Options:

Buy Now
Questions 9

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

MB-335 Question 9

Options:

Buy Now
Questions 10

You need to configure production control parameters for liquid cleaning solution manufacturing.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Require an electronic signature when the formula is approved.

B.

Select Block editing and approve the formula.

C.

Select the Block removal of approval option for the formula

D.

Select the Block editing option only.

D18912E1457D5D1DDCBD40AB3BF70D5D

Buy Now
Questions 11

You need to calculate estimated consumption of ingredients for liquid cleaning solution.

What is the consumption? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 11

Options:

Buy Now
Questions 12

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 12

Options:

Buy Now
Questions 13

You need to configure costing for raw materials used to manufacture unscented cleaning solution.

Which form should you use?

Options:

A.

Cost basis type

B.

Quantity and margin template

C.

Pricing calculation

D.

Pricing template

Buy Now
Questions 14

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 14

Options:

Buy Now
Questions 15

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Buy Now
Questions 16

You need to plan scheduling for Customer1’s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Schedule production based on the availability of raw material.

B.

Split and plan operations in detail for each of the resources.

C.

Schedule productions based on the capacity of the resources.

D.

Run master planning with a specific time fence.

E.

Plan scheduling of the production at the resource group level.

Buy Now
Questions 17

You need to configure the system to meet the order requirements for unscented cleaning solution. Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the ingredient as a restricted and regulated product.

B.

On the inventory management parameters, set the value for the Print Product Safety Data Sheet and Prevent Sales Pack Slip/Invoke Posting to TRUE

C.

Add the ingredients for unscented cleaning solution to a regulated products inclusion list

D.

Ensure that the PSDS file is active and within the expiration date requirements.

E.

In Document Handling, associate the PSDS file with the PSDS record and set restriction field set to Internal

Buy Now
Questions 18

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 18

Options:

Buy Now
Questions 19

You need to set up the chocolate items.

Which values should you select? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 19

Options:

Buy Now
Questions 20

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 Question 20

Options:

Buy Now
Questions 21

You need to configure the system to meet the requirements.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 21

Options:

Buy Now
Questions 22

You need to determine the batch values on the combined mix batches for OperatorA.

Which values should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 22

Options:

Buy Now
Questions 23

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 23

Options:

Buy Now
Questions 24

You need to resolve the issue for UserC.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Best before period in days

B.

Best advice period in days

C.

Backward tracing

D.

Forward tracing

E.

Shelf life period in days

Buy Now
Questions 25

You need to configure the system to track the cost and delivery performance of VendorZ.

Which two actions should you perform? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Add an activity to the production route for deliveries.

B.

Create a service product and set Stocked product - Yes.

C.

Add an activity to the production flow for deliveries.

D.

Create a service product and set Stocked product = No.

Buy Now
Questions 26

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Ignore scheduled execution

B.

Asset

C.

Tool

D.

Worker

E.

Ignore schedule

Buy Now
Questions 27

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Service subscription

B.

Counter-based maintenance plan lines

C.

Maintenance plan lines for the location

D.

Service type item

E.

Time-based maintenance plan lines

Buy Now
Questions 28

You need to configure the controller's ModelB asset requirements for the off-season.

What should you do?

Options:

A.

Use the default functional location

B.

Create a functional location.

C.

Create a location profile.

D.

Create a location type.

Buy Now
Questions 29

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 Question 29

Options:

Buy Now
Questions 30

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set up configuration and weight for partial visibility.

B.

Create a product master with predefined variants for ounces and boxes.

C.

Set up configuration and weight for full visibility.

D.

Create a catch weight item.

Buy Now
Questions 31

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 31

Options:

Buy Now
Questions 32

A company is implementing Dynamics 365 Supply Chain Management The company is a subcontractor that produces subassemblies for two major customers. CustomerA and Customers

The company prioritizes CustomerA production orders to start on Mondays. The production orders may take several days to complete. Customers’ orders are produced throughout the week, after CustomerA orders are completed. Work in process (W1P) must be calculated and consolidated for CustomerA and CustomerB respectively on the financial reports.

You need to configure the production requirements.

What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 Question 32

Options:

Buy Now
Questions 33

You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.

You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.

You have set up the default Start user options for all production orders as shown in the exhibit below.

MB-335 Question 33

MB-335 Question 33

Options:

Buy Now
Questions 34

You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 34

Options:

Buy Now
Questions 35

You need to configure the production requirements for the QA team. What should you configure?

Options:

A.

product readiness policies

B.

quality order

C.

quarantine order

D.

inventory status

Buy Now
Questions 36

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 Question 36

Options:

Buy Now
Questions 37

A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.

An employee discovers an error after a time and attendance record is approved and transferred. The payroll transfer has not been run. However, the time has been posted against the production order.

You need to reverse the transferred registrations.

What happens to the production order time posting?

Options:

A.

Negative values are offset through manual posting.

B.

Transactions are offset and neutralized.

C.

The production order is ended.

D.

The Production Report as Finished journal is posted.

Buy Now
Questions 38

A recreational vehicle (RV) manufacturing company is implement Dynamics 365 Supply Chain Management. All RVs are configured to order.

Quality checks show that there is an issue with the sealant used with the windows in some of the RVs.

You need to identify which RV models use the sealant and change the sealant item.

Which function should you use for each requirement? To answer, drag the appropriate functions to the correct requirements. Each function may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 Question 38

Options:

Buy Now
Questions 39

A company uses Asset management in Dynamics 365 Supply Cham Management. The company also uses Dynamics 365 Guides independently of the Dynamics 365 Supply Chain Management implementation.

Maintenance workers requite a checklist template to complete work orders. A solution must help the workers through work order steps. The solution must use Dynamics 365 Guides with Dynamics 365 Supply Chain Management.

You need to integrate the solution.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 Question 39

Options:

Buy Now
Questions 40

A company implements Dynamics 365 Supply Chain Management.

Due to increased demand and limited space in the work cell area tor product LOOM, you must subcontract overflow work to another company. You have the following requirements:

• Locate a warehouse at the subcontractor building.

• Support picking and shipping activity tracking.

• Associate costs of transporting materials between the locations in the cost of the finished product.

You need to modify the production flow.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE Each correct selection is worth one point.

Options:

A.

Create transfer activities and assign them to the subcontractor.

B.

Create a new production flow version.

C.

Modify the overflow work operation and associate it with the subcontractor.

D.

Create a resource and work cell resource group for the subcontractor.

E.

Modify the overflow work activity and assign it to the subcontractor.

Buy Now
Questions 41

A company uses Dynamics 365 Supply Chain Management.

The company wants to use the distributed hybrid topology model to alleviate performance issues at some of its distribution centers. The company has a manufacturing plant, PlantA, which resides at the same physical location as the company home office in FranlFurt Germany.

The company has the following distribution locations:

* Distribution1 covers Ireland.

* Distribute covers the United Kingdom.

* Distribution convers Belgium Germany, and the Netherlands

* Distribution5 covers the Shetland islands.

All distribution warehouses use Dynamic 365 Supply Chain Management to receive and distribute goods from PlantA.

Wherehouse personal use the warehouse app to perform their job function. Because of their proximity to each other, Distribution1, 2, and 3 are managed together and frequently transfer goods between each location.

Due to several connection issues with Dynamic 365 Supply Chain Management, the Shettland islands location struggles to perform tasks.

The company must maintain as little of its own IT infrastructure as possible, especially in remote areas, but still daily activities at all locations.

You need to recommend the appropriate topology configuration.

Which type of scaled should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 41

Options:

Buy Now
Questions 42

You are the product design manager for a computer manufacturer.

Your new laptop model is configurable. There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.

You need to create a new laptop item number and configurations.

In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 Question 42

Options:

Buy Now
Questions 43

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

Buy Now
Questions 44

You need to set up the correct production solution for the assembly area. Which solution should you implement?

Options:

A.

Standard warehousing with Manufacturing execution

B.

Standard warehousing for all transactions

C.

Advanced warehousing for all transactions

D.

Advanced warehousing with Manufacturing execution

Buy Now
Questions 45

You need to set up the state control for sales of motorcycles.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

B.

Create an inclusive restricted product list for United States and add the motorcycle part to the list.

C.

Create an exclusive restricted product list for California and add the motorcycle part to the list.

D.

Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

Buy Now
Questions 46

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 Question 46

Options:

Buy Now
Questions 47

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic

Buy Now
Questions 48

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 48

Options:

Buy Now
Questions 49

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 Question 49

Options:

Buy Now
Questions 50

You need to set up the configuration model to price the motorcycles correctly. What should you do?

Options:

A.

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Buy Now
Exam Code: MB-335
Exam Name: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert
Last Update: Aug 18, 2025
Questions: 195

PDF + Testing Engine

$61.25  $174.99

Testing Engine

$47.25  $134.99
buy now MB-335 testing engine

PDF (Q&A)

$40.25  $114.99
buy now MB-335 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 18 Aug 2025