SAFe-Practitioner SAFe Practitioner Exam (6.0) Questions and Answers

Questions 4

When basing decisions on economics, how are lead time, product cost, value, and development expense used?

Options:

A.

To recover money already spent

B.

To understand solution tradeoffs

C.

To limit work in process (WIP)

D.

To take into account sunk costs

Buy Now
Questions 5

What visibility should Scrum Masters provide during the Agile Release Train Sync?

Options:

A.

Visibility into progress and impediments

B.

Visibility into system Solution Intent

C.

Visibility into collaboration deployment

D.

Visibility into single source design decisions

Buy Now
Questions 6

Which team type is organized to assist other teams with specialized capabilities and help them become more proficient in new technologies?

Options:

A.

Enabling team

B.

Platform team

C.

Stream-aligned team

D.

Complicated subsystem team

Buy Now
Questions 7

What does the ART planning board show?

Options:

A.

Risks

B.

Significant dependencies

C.

Capacity and load

D.

Epics

Buy Now
Questions 8

Which statement reflects one of the steps for setting initial velocity?

Options:

A.

Maintenance tasks do not need to be included in velocity; maintenance tasks fall outside thi scope

B.

The team members assess their availability, acknowledging time off and other potential v u duties

C.

Determining velocity is a new function in each Iteration; previous Iterations should not be ^ transferred to a new Iteration

D.

Identify work on technical infrastructure, tooling, and other systemic impediments

Buy Now
Questions 9

On day two of PI Planning, management presents adjustments based on the previous day's management review and problem-solving meeting. What is one possible type of adjustment they could make?

Options:

A.

Create new User Stories

B.

Adjust business priorities

C.

Change a team's plan

D.

Redefine the length of the PI

Buy Now
Questions 10

Team B has elected to stop holding retrospective events so they can spend more time completing Stories. Which of the following Agile Team responsibilities is Team B over-prioritizing?

Options:

A.

Applying systems thinking

B.

Deliver value

C.

Plan the work

D.

Connect with the customer

Buy Now
Questions 11

What best supports Innovation in the SAFe House of Lean?

Options:

A.

Visualizing work

B.

Optimizing the whole

C.

Built-in quality

D.

Fast learning cycles

Buy Now
Questions 12

Which of the following events does SAFe recommend running regularly throughout the PI?

Options:

A.

ART Sync

B.

Design Sync

C.

Business Owner Sync

D.

Product Sync

Buy Now
Questions 13

Which statement is true about Features and Stories?

Options:

A.

Features should be small enough to fit into an Iteration

B.

Features can be larger than an Iteration but Stories should be small enough to fit into an Iteration

C.

They are prioritized by the team

D.

They are estimated like User Stories

Buy Now
Questions 14

Which of the following measures tracks progress toward achieving desired outcomes?

Options:

A.

Burn-down charts

B.

Cumulative flow diagrams

C.

Objectives and key results

D.

ART actual business value

Buy Now
Questions 15

What is the recommended final agenda item of PI Planning?

Options:

A.

Surfacing the ART risks

B.

Reviewing the final plan

C.

Participating in the planning retrospective

D.

Assigning Business Value

Buy Now
Questions 16

During the Inspect and Adapt event, how are reflection, data collection, problem solving, and identification of improvement actions used?

Options:

A.

To evaluate better implementation steps

B.

To enhance and improve the Innovation and Planning practices

C.

To help the team bond and work more efficiently together

D.

To increase the quality and reliability of the next PI

Buy Now
Questions 17

What is an example of an ART event?

Options:

A.

Iteration review

B.

Innovation and Planning

C.

Team Sync

D.

Coach Sync

Buy Now
Questions 18

What do Strategic Themes influence directly?

Options:

A.

Lean budget Guardrails

B.

Organization of the ART

C.

Enterprise Strategy

D.

PI cadence

Buy Now
Questions 19

What does the "C" represent in the CALMR approach to DevOps?

Options:

A.

Completion

B.

Cycle-time

C.

Culture

D.

Continuous Integration

Buy Now
Questions 20

Which of the following categories addresses potential risks?

Options:

A.

Acquired

B.

Resolved

C.

Obtained

D.

Managed

Buy Now
Questions 21

What is one benefit of organizing around value, & reorganizing when required?

Options:

A.

Understanding the Portfolio Backlog

B.

Building the Continuous Delivery Pipeline

C.

Enabling a DevOps mindset

D.

Minimizing handoffs and dependencies

Buy Now
Questions 22

Which pillar in the House of Lean focuses on the Customer being the consumer of the work?

Options:

A.

Value

B.

Innovation

C.

Respect for People & Culture

D.

Flow

Buy Now
Questions 23

What is the purpose of the Team Sync?

Options:

A.

To identify ART PI risks

B.

To coordinate daily work

C.

To identify Iteration goals

D.

To make announcements to the entire ART

Buy Now
Questions 24

Which three questions should each team member answer during the daily stand-up? (Choose three.)

Are there any impediments that will prevent the team from meeting the Iteration goals?

Options:

A.

How am I splitting the Solutions into Capabilities and Enablers?

B.

How am I optimizing the full Solution?

C.

What did I do yesterday to advance the Iteration goals?

D.

What will I do today to advance the Iteration goals?

E.

How I am contributing to an environment of continuous change?

Buy Now
Questions 25

What can be used as a template for putting SAFe into practice within an organization?

Options:

A.

SAFe Core values

B.

SAFe Seven Core Competencies

C.

SAFe Implementation Roadmap

D.

SAFe Lean-Agile Principles

Buy Now
Questions 26

What is an example of applying cadence-based synchronization in SAFe?

Options:

A.

Teams decide their own Iteration length

B.

Teams can only release new software on the same day

C.

Teams meet twice every PI to plan and schedule capacity

D.

Teams align the start and end dates of their Iterations

Buy Now
Questions 27

A cumulative flow diagram focuses on which curves?

Options:

A.

Arrival curve ("to do") and evolution curve ("change")

B.

Implementation curve ("movement") and departure curve ("done")

C.

Backlog curve ("work") and departure curve ("done")

D.

Arrival curve ("to-do") and departure curve ("done")

Buy Now
Questions 28

User business value and time criticality are components of what?

Options:

A.

Product Vision

B.

Story point estimation

C.

Feature Acceptance Criteria

D.

Cost of Delay

Buy Now
Questions 29

Which factor helps unlock the intrinsic motivation of knowledge workers?

Options:

A.

Pay-for-performance

B.

Autonomy

C.

Parallel development

D.

Team performance incentives

Buy Now
Questions 30

What is one approach to unlock the intrinsic motivation of knowledge workers?

Options:

A.

Centralize decision-making

B.

Provide autonomy

C.

Reduce work in process (WIP) limits

D.

Strive to achieve a state of continuous flow

Buy Now
Questions 31

Which of the following SAFe Core Competencies of Business Agility includes the Customer Centricity and Design Thinking dimension?

Options:

A.

Lean Portfolio Management

B.

Lean-Agile Leadership

C.

Continuous Learning Culture

D.

Agile Product Delivery

Buy Now
Questions 32

Which two views does the Iteration review provide into the program? (Choose two.)

Options:

A.

How the team is responding to the stakeholders

B.

How the team is doing on the Program Increment

C.

How the team is increasing empowerment

D.

How the team is demonstrating transparency of decision-making

E.

How the team did on the Iteration

Buy Now
Questions 33

What is one benefit of Story acceptance criteria?

Options:

A.

To provide Story details from a deployment point of view

B.

To provide Story details from a designer point of view

C.

To provide Story details from a release-planning point of view

D.

To provide Story details from a testing point of view

Buy Now
Questions 34

What is one of the Agile Release Train events?

Options:

A.

Iteration Retrospective

B.

Backlog refinement

C.

Solution Demo

D.

Product Owner sync

Buy Now
Questions 35

What does the Continuous Delivery Pipeline enable?

Options:

A.

Continuous refactoring

B.

Delivery of large batches

C.

Ongoing learning

D.

Increased technical debt

Buy Now
Questions 36

What else does the SAFe principle, "unlock the intrinsic motivation of knowledge workers", require besides purpose and minimum possible constraints?

Options:

A.

Autonomy

B.

Innovation

C.

Incentive-based compensation

D.

Transparency

Buy Now
Questions 37

What is the first step in Kotter's 8-step process for leading change?

Options:

A.

Generate short-term wins

B.

Enlist a volunteer army

C.

Create a sense of urgency

D.

Build a guiding coalition

Buy Now
Questions 38

During which of the following PI Planning activities are Business Owners asked to accept the plans?

Options:

A.

The Management Review and Problem-Solving workshop

B.

The draft plan review

C.

The final plan review

D.

The second team breakout session

Buy Now
Questions 39

Why is it important for teams to understand the optimum batch size for their work?

Options:

A.

To make value flow

B.

To complete more work

C.

To understand transaction costs

D.

To determine the correct cadence

Buy Now
Questions 40

Which statement is true about Iteration Planning?

Options:

A.

Items are assigned to the team members

B.

It is required for every Iteration to enable fast learning cycles

C.

The PO does not need to attend

D.

It occurs on the last day of the Iteration

Buy Now
Questions 41

What can be used to script the change to SAFe?

Options:

A.

The Lean-Agile Center of Excellence (LACE) charter

B.

The portfolio canvas

C.

The steps in the Business Agility

D.

The SAFe Implementation Roadmap

Buy Now
Questions 42

Team A is a maintenance team that cannot always predictably plan their work. They like to meet daily to review the needs of the system and plan for how they can quickly address those needs during the workday. Which of the following SAFe Lean-Agile methods should Team A use to plan and execute their work?

Options:

A.

SAFe Platform Team

B.

SAFe Enabling Team

C.

SAFe Team Kanban

D.

SAFe XP Team

Buy Now
Questions 43

What is one way to show true progress of business outcomes?

Options:

A.

Review the Kanban board

B.

Discuss during PI Planning

C.

Analyze ART metrics

D.

Conduct a System Demo

Buy Now
Questions 44

What is an example of a program event?

Options:

A.

Scrum of scrums

B.

Iteration review

C.

Daily stand-up

D.

Innovation and Planning

Buy Now
Questions 45

Which statement is a value from the Agile Manifesto?

Options:

A.

Build incrementally with fast, integrated learning cycles

B.

Responding to change over following a plan

C.

Respect for people and culture

D.

Working software is the primary measure of progress

Buy Now
Questions 46

Which activity is key to successfully implementing the Scaled Agile Framework?

Options:

A.

Use the Innovation and Planning Iteration instead of the PI Planning process

B.

Replace the PI Planning process with the Inspect and Adapt workshop when possible

C.

Use a cadence-based PI Planning process

D.

Remove blocks such as portfolio estimation

Buy Now
Questions 47

What are Lean Portfolio Management, Agile Product Delivery, and Lean-Agile Leadership?

Options:

A.

Steps in the Business Agility Value Stream

B.

Agile values

C.

SAFe Core Competencies

D.

SAFe Lean-Agile Principles

Buy Now
Questions 48

Which of the following statements describes the balanced Agile testing pyramid?

Options:

A.

Many small, low-level, automated tests & fewer large, manual tests

B.

Many solution tests run by internal team members & fewer run by external testers

C.

Many solution tests run by external testers and fewer run by internal team members

D.

Many large, manual tests of the end-to-end solution and fewer small, automated tests

Buy Now
Questions 49

Which statement defines the purpose of Iteration Planning?

Options:

A.

It is to analyze, approve, and ready Features for implementation

B.

It is to organize the work and define a realistic scope for the Iteration

C.

It is to break Stories into tasks that are achievable in the team's capacity

D.

It is to explore and implement program Epics and split them into Features to be further explored

Buy Now
Questions 50

An Agile Team collects the Iteration Metrics they have agreed upon during which part of the team retrospective?

Options:

A.

During the Features agreement retrospective

B.

During the qualitative part of the team retrospective

C.

During the quantitative part of the team retrospective

D.

During the time and materials retrospective

Buy Now
Questions 51

During which PI Planning activity do Business Owners assign business value to PI Objectives?

Options:

A.

The final plan review

B.

The team breakout session

C.

The Management Review and Problem-Solving workshop

D.

The draft plan review

Buy Now
Questions 52

The Inspect and Adapt event always starts with which activity?

Options:

A.

The PI System Demo

B.

Agreement on the problems to solve

C.

Quantitative measurement

D.

Retrospective and Problem Solving Workshop

Buy Now
Questions 53

What is one of the six steps in the Problem Solving Workshop?

Options:

A.

Apply root solution analysis

B.

Brainstorm possible failures

C.

Identify the biggest root cause using the Pareto Analysis

D.

Choose a problem to solve—agreement not required

Buy Now
Questions 54

Which statement is true about Iteration planning for Kanban teams?

Options:

A.

Kanban teams estimate their velocity

B.

Kanban teams publish Iteration goals

C.

Kanban teams do not commit to service level agreements

D.

Kanban teams find high value in trying to plan the Iteration in detail

Buy Now
Questions 55

What is the role of the Release Train Engineer?

Options:

A.

To ensure the technical integrity of all development in the Agile Release Train

B.

To coach teams to improve their results

C.

To serve as the content authority at the Program Level

D.

To serve as the Scrum Master for the Agile Release Train

Buy Now
Questions 56

Which of the following tools can be used to develop a deeper understanding of what customers are seeing, thinking, and feeling while interacting with the Solution?

Options:

A.

Value stream map

B.

Story map

C.

Empathy map

D.

Vision map

Buy Now
Questions 57

What represents the workflow, activities, and automation needed to deliver new functionality more frequently?

Options:

A.

Portfolio Kanban

B.

The Lean budget Guardrails

C.

The Continuous Delivery Pipeline

D.

The PI Planning process

Buy Now
Questions 58

3- If the PI System Demo shows the current state of the Solution, then who is this demo intended for?

Options:

A.

The Scrum Masters

B.

The Business Owners

C.

The Product Owner

D.

The Agile Team

Buy Now
Questions 59

Which implementation step follows Coach ART Execution on the SAFe Implementation Roadmap?

Options:

A.

Accelerate

B.

Launch more ARTs and Value Streams

C.

Train Executives, Leaders, and Managers

D.

Organize Around Value

Buy Now
Questions 60

Which of the following roles is responsible for prioritizing the Agile Team Backlog?

Options:

A.

Release Train Engineer

B.

Scrum Master/ Team Coach

C.

Release Manager

D.

Product Owner

Buy Now
Questions 61

How does relentless improvement support value in the SAFe House of Lean?

Options:

A.

It allows teams to pivot without mercy or guilt

B.

It uses informed decision-making through fast feedback

C.

It builds long-term partnerships based on trust

D.

It optimizes the whole

Buy Now
Questions 62

What is one responsibility of Product Management?

Options:

A.

Provide estimates for the Team Backlog

B.

Own Spike stories on the Team Backlog

C.

Maintain the Architectural Runway

D.

Define priorities in the ART Backlog

Buy Now
Questions 63

During which of the following PI Planning activities does Product Management introduce the prioritized Features to the teams for planning?

Options:

A.

The Product/Solution Vision presentation

B.

The draft plan review

C.

The business context presentation

D.

The Management Review and Problem-Solving workshop

Buy Now
Questions 64

What is a quality of an Agile team?

Options:

A.

Each team has a Scrum Master/Team Coach and a Product Manager

B.

Managers direct their work

C.

Cross-functional

D.

Composed of 10 to 20 members

Buy Now
Questions 65

What is the purpose of Customer Centricity?

Options:

A.

To design custom-built Customer Solutions

B.

To interpret market rhythms

C.

To build small, partial systems just in time

D.

To understand the Customer's needs

Buy Now
Questions 66

Which of the following statements describes the concept of "shift-left"?

Options:

A.

Move testing and validation activities earlier in the work cycle to get faster or continuous feedback

B.

Write tests at the end of development to capture potential failures discovered throughout the development process

C.

Perform testing and validation activities in the production environment under real-world conditions

D.

Run two nearly identical production environments, moving users between the two to make small changes to one or the other

Buy Now
Questions 67

What is considered an anti-pattern when assigning business values to team PI Objectives?

Options:

A.

Business values are assigned to uncommitted objectives.

B.

High business value is assigned to important Enabler work.

C.

Business Owners assign the business value for all teams on the ART.

D.

All PI Objectives are given a business value of 10.

Buy Now
Questions 68

A SAFe Portfolio is a collection of what?

Options:

A.

Development Value Streams

B.

Functional teams

C.

Solutions

D.

Business units

Buy Now
Questions 69

What is the purpose of the Iteration review?

Options:

A.

To serve as a forecasting meeting where the work is estimated for the Program Increments

B.

To show the backlog items and work on possible Solutions for the backlog items

C.

To measure the team's progress by showing working Stories to the stakeholders and getting ^ feedback from them

D.

To identify where there is too much work in the system and where the teams are being ^ overloaded

Buy Now
Questions 70

Who has content authority to make decisions at the User Story level during PI Planning?

Options:

A.

Release Train Engineer

B.

Scrum Master/Team Coach

C.

Product Owner

D.

Agile Team

Buy Now
Questions 71

What is typically included in the definition of done for the team increment?

Options:

A.

Stories are accepted by Product Management

B.

45 new questions addStories are accepted by the Product Owner

C.

Customer documentation is ready

D.

Regression testing is done

Buy Now
Questions 72

Which of the core competencies of the Lean Enterprise helps align strategy and execution?

Options:

A.

Team & Technical Agility

B.

Organizational Agility

C.

Agile Product Delivery

D.

Lean Portfolio Management

Buy Now
Questions 73

An Agile Team has which two characteristics? (Choose two.)

Options:

A.

A stand-alone unit of individuals who do not require input from other teams to complete their tasks

B.

A group of dedicated individuals who are empowered, self-organizing, self-managing, and deliver value

C.

A small group of typically 5 - 11 dedicated individuals who have the skills necessary to define, build, test, and deploy increments of value

D.

A large group of individuals who all work together to create value for the client

E.

A group of dedicated individuals that work in phase-gate steps to complete their PI Objectives

Buy Now
Questions 74

Which SAFe Core Value includes "use common terminology" and "understand your customer"?

Options:

A.

Alignment

B.

Relentless Improvement

C.

Transparency

D.

Respect for People

Buy Now
Questions 75

During the final plan review, ART PI risks are ROAM'ed. What do the letters in ROAM represent?

Options:

A.

Resolved, Owned, Approved, Mitigated

B.

Resolved, Owned, Accepted, Mitigated

C.

Resolved, Owned, Assigned, Mitigated

D.

Resolved, Owned, Active, Mitigated

Buy Now
Questions 76

What is one practice used to understand the problem space during the discover phase of Design Thinking?

Options:

A.

Prototyping

B.

Personas

C.

Empathy maps

D.

Gemba walks

Buy Now
Questions 77

What is the goal of the SAFe House of Lean model?

Options:

A.

Innovation

B.

Relentless Improvement

C.

Flow

D.

Value

Buy Now
Questions 78

During System Demo, Team B states that the most recent release failed because of poor version control. They share their plan for preventing similar mistakes from happening in the future. Which of the following SAFe Core Values is Team B demonstrating?

Options:

A.

Organize around value

B.

Siloed Thinking

C.

Transparency

D.

Visualizing work

Buy Now
Questions 79

What must management do for a successful Agile transformation?

Options:

A.

Commit to quality and take responsibility to change the system

B.

Send someone to represent management, and then delegate tasks to these individuals

C.

Establish direct lines of report to the RTEs

D.

Identify and area of the transformation they can control

Buy Now
Questions 80

Which of the following types of Enabler Stories is used for building and evaluating prospective Solutions alternatives?

Options:

A.

Exploration

B.

Infrastructure

C.

Architecture

D.

Compliance

Buy Now
Questions 81

What type of information can be easily seen in a cumulative flow diagram?

Options:

A.

Time to complete a Feature

B.

Team capacity

C.

Work in process across the team

D.

The number of defects that escape to production

Buy Now
Exam Code: SAFe-Practitioner
Exam Name: SAFe Practitioner Exam (6.0)
Last Update: Oct 5, 2025
Questions: 270

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now SAFe-Practitioner testing engine

PDF (Q&A)

$31.5  $104.99
buy now SAFe-Practitioner pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 05 Oct 2025