Which building typology should benefit the most from having a wastewater treatment and recycling system?

Options:

A.

Homes

B.

Hotel

C.

School

D.

Office

Buy Now
Questions 5

How many years of experience in related fields are required for applicants without a construction-related higher qualification to become an EDGE Expert?

Options:

A.

At least 1 year

B.

At least 2 years

C.

At least 3 years

D.

At least 5 years

Buy Now
Questions 6

An EDGE Auditor is auditing a hospital design for Preliminary Certification. The EDGE Client has included photovoltaics as one of the energy measures resulting in an overall 21% saving in energy. The Auditor observes the photovoltaics are facing the wrong direction. What action should the Auditor take?

Options:

A.

Contact the design team directly and suggest a better orientation for the photovoltaics.

B.

Adjust the area of photovoltaic panels in the assessment to allow for reduction in energy output.

C.

Assess the energy measures as they are presented to you, without changing the photovoltaic selection.

D.

Reject photovoltaics from the selected set of energy measures and notify the Client regarding the orientation.

Buy Now
Questions 7

Increasing the glazing area of an office building will NOT impact which of the following?

Options:

A.

Cooling demand

B.

Heating demand

C.

Lighting energy

D.

Hot water demand

Buy Now
Questions 8

Implementing the green building measures claimed for EDGE certification is the responsibility of

Options:

A.

the Client.

B.

the Certifier.

C.

the EDGE Auditor.

D.

the EDGE Partner.

Buy Now
Questions 9

A project certificate that meets the EDGE Zero Carbon criteria fully on-site providing generation of on-site renewable electricity, will expire every

Options:

A.

two years.

B.

three years.

C.

four years.

D.

five years.

Buy Now
Questions 10

A building owner tells an EDGE Auditor that water-efficient faucets are in the building’s restrooms. However, the specifications on the faucets are not provided. The Auditor should:

Options:

A.

Exclude the faucets in question from the project.

B.

Test the faucets’ flow rates to prove the water use and document the findings.

C.

Require the building owner to replace the faucets as the audit needs the exact specification.

D.

Find a product that has the same parameters as the building owner describes and upload this for evidence.

Buy Now
Questions 11

Which information about local climate is used for EDGE calculations?

Options:

A.

Hourly averages for outdoor minimum and maximum temperatures, wind velocity, outdoor humidity, and solar radiation

B.

Weekly averages for outdoor minimum and maximum temperatures, wind velocity, outdoor humidity, and solar radiation

C.

Monthly averages for outdoor minimum and maximum temperatures, wind velocity, outdoor humidity, and solar radiation

D.

Annual averages for outdoor minimum and maximum temperatures, wind velocity, outdoor humidity, and solar radiation

Buy Now
Questions 12

Which of the following is a primary resource for the EDGE Auditor when performing the site visit?

Options:

A.

EDGE software

B.

Roof insulation U-value

C.

EDGE Auditor’s checklist

D.

Window to Wall Ratio (WWR)

Buy Now
Questions 13

A hotel achieved EDGE Certification a year ago. The EDGE Client wishes to maintain its EDGE Certification. What is required to maintain the EDGE Certification of the hotel?

Options:

A.

There are no requirements to maintain EDGE Certification.

B.

The EDGE Client must perform a self-assessment every year.

C.

The EDGE Auditor must verify EDGE measures with a site visit every three years.

D.

When alterations are made to the hotel, the EDGE Auditor must verify EDGE measures with supporting documentation.

Buy Now
Questions 14

The COP of the water-cooled chiller is 6, and the cooling thermal load is 3516 W. What is the power rating of the chiller?

Options:

A.

586 W

B.

3510 W

C.

3522 W

D.

21096 W

Buy Now
Questions 15

Which of the following protocols should be followed when the project city is not listed in the EDGE App?

Options:

A.

Write to EDGE Certifier to request the city to be included and wait for the application to be updated.

B.

Choose the closest city to the project location and edit the climate data if necessary.

C.

Select any city in the same climate zone around the world and use that to certify the project.

D.

Choose the capital city to the project location and edit the climate data if necessary.

Buy Now
Questions 16

Which of the following types of light bulbs will have the highest efficacy of lumens per watt?

Options:

A.

T5 fluorescent lamps

B.

T8 fluorescent lamps

C.

Light emitting diodes LEDs

D.

Compact fluorescent lamps CFLs

Buy Now
Questions 17

Other than embodied carbon, the selection of wall materials has an impact on

Options:

A.

Window to Wall Ratio WWR.

B.

energy consumption.

C.

internal heat gains.

D.

solar heat gain coefficient.

Buy Now
Questions 18

A site audit must take place within how many months of the project’s practical completion date?

Options:

A.

12 months

B.

18 months

C.

24 months

D.

36 months

Buy Now
Questions 19

What are the benefits of using a pool cover that are recognized in EDGE?

Options:

A.

Increase solar control and comfort

B.

Reduce both water and energy demand

C.

Require less maintenance and work from employees

D.

Reduce chemical consumption and that of cleaning products

Buy Now
Questions 20

Which of the following passive design features is considered within the EDGE calculation methodology?

Options:

A.

Lighting controls

B.

External shading

C.

Renewable energy

D.

Efficient cooling system

Buy Now
Questions 21

EDGE methodology is NOT based on which of the following factors?

Options:

A.

Climatic conditions of location

B.

Building type and occupant use

C.

Design and specifications

D.

Electricity and water bills

Buy Now
Questions 22

When must the registration fee be paid?

Options:

A.

Prior to site audit

B.

Prior to registration

C.

After the registration

D.

After certification has been awarded

Buy Now
Questions 23

What is the minimum percentage of efficient lightbulbs that must be installed to claim the measure EEM22 - Efficient Lighting for Internal Areas?

Options:

A.

70%

B.

80%

C.

90%

D.

100%

Buy Now
Questions 24

How often should the EDGE Zero Carbon certification be renewed?

Options:

A.

Initially after two years, subsequently every four years

B.

Initially after four years, subsequently every two years

C.

Every two years if using carbon offsets, or every four years if using 100% renewable energy

D.

Every four years if using carbon offsets, or every two years if using 100% renewable energy

Buy Now
Questions 25

The Base Case for utility costs:

Options:

A.

Excludes the cost of virtual energy.

B.

Includes the cost of virtual energy.

C.

Excludes the cost of virtual energy only in homes.

D.

Includes the cost of virtual energy only in homes.

Buy Now
Questions 26

Which of the following does NOT contribute to an EDGE Auditor maintaining their Auditor status?

Options:

A.

Performing at least one project site audit every two years.

B.

Studying the EDGE user guides as and when they are updated.

C.

Retaking the auditor exam.

D.

Attending refresher training.

Buy Now
Questions 27

What is a valid use for collected rainwater to qualify for savings under EDGE?

Options:

A.

Ground water recharge

B.

Redirecting to nearest drain

C.

Redirecting to nearest water body

D.

Using for air-conditioning in cooling towers

Buy Now
Questions 28

A Client is developing two identical hotels in different cities but finds that the energy intensity (kWh/m²/year) of the hotels are different. Which of the following difference in these two cities could have caused this?

Options:

A.

Climate

B.

Electricity prices

C.

Cost of materials

D.

Availability of fresh water

Buy Now
Questions 29

Which of the following measures require testing by the EDGE Auditor at the site audit?

Options:

A.

EEM07 – Green Roof

B.

WEM16 – Condensate Water Recovery

C.

WEM03 – Low-flow Faucets for Bathrooms

D.

WEM15 – Waste Water Treatment and Recycling System

Buy Now
Questions 30

EDGE was created for new buildings to promote:

Options:

A.

Revenue for green building champions.

B.

Few exemplary high-performance buildings.

C.

Simple and scalable platform for green buildings.

D.

Highly accurate prediction of resource consumption.

Buy Now
Questions 31

Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

Options:

A.

Design building elevations marking the window glass specifications

B.

Bill of quantities with the specifications for the window glass highlighted

C.

Manufacturer's data sheets showing the make and model, U-value, and SHGC of the installed glass

D.

Window schedule for the building showing the major window glass types if more than one type of glass is present

Buy Now
Questions 32

In the EDGE software, what is the unit of the embodied carbon of the material?

Options:

A.

kgCO2

B.

MJ

C.

BTU

D.

kWh

Buy Now
Questions 33

Which of the following user types has access to the Share Subproject function?

Options:

A.

Owner

B.

Auditor

C.

Certifier

D.

Reviewer

Buy Now
Exam Code: EDGE-Expert
Exam Name: Excellence in Design for Greater Efficiencies (EDGE Expert) Exam
Last Update: Apr 7, 2026
Questions: 110

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now EDGE-Expert testing engine

PDF (Q&A)

$31.5  $104.99
buy now EDGE-Expert pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 07 Apr 2026