Grab 75% Off This Black Friday: Use coupon code below to save on all exam bundles! - Ends in 0d 00h 00m 00s - Coupon code: 75only

HPE7-A12 HPE Network Data Center Professional Architect Exam Questions and Answers

Questions 4

Match each switch family to its capability.

HPE7-A12 Question 4

Options:

Buy Now
Questions 5

You are completing a proposal for a data center network that includes 14 CX 8325 switches, 6 CX 6300M switches, and Fabric Composer licenses for these switches.

What is one assumption that could be included in the assumptions documentation?

Options:

A.

The customer has sufficient OPEX budget to pay for the Fabric Composer licenses

B.

The customer has ESXi or KVM hosts that have sufficient resources to run Fabric Composer and can connect to the OOBM network.

C.

The customer has an Internet connection over which switches ' mgmt ports can receive access to the cloud-based management solution.

D.

The customer has attended or enrolled for training on using Fabric Composer.

Buy Now
Questions 6

Waratah Hospital, located in Australia, plans to move many data-center services to a new facility. (The remaining legacy data center is outside the scope of this project.) Waratah Hospital has engaged an external consultant to help design the new data-center network.

Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The design document is summarized below.

Requirements and information:

Six racks in the data-center room (a single row).

Redundant top-of-rack leaf switches with back-to-front cooling in each rack, delivering 10/25 Gbps connectivity to servers, storage, and other devices.

Four 100 GbE uplinks per leaf switch.

The customer requested that all switch ports face the rear of the racks (the hot aisle).

OOB management for servers, storage, and the network must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.

Core equipment for the OOBM network is being reused.

Middle-of-row spine switches.

The data center must connect to the hospital building with links providing 400 Gbps.

Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used for firewall failover. The data-center network must connect to these firewalls with links totaling 100 Gbps.

The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.

The customer also requires:

99.999% uptime for this life-critical environment.

Planned and unplanned downtime must be minimized.

Software upgrades are permitted only once per year with close to zero downtime.

All life-critical resources are accessed locally, and all resources exist within the hospital campus.

Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.

Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.

In the past, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.

Given the scenario, what environmental information should be gathered to supplement the design? Choose two.

Options:

A.

heat dissipation requirements

B.

connectivity requirements

C.

power requirements

D.

switch placement requirements

Buy Now
Questions 7

An RFP states that the proposal must be TAA-compliant. What conclusion should you make?

Options:

A.

You must recommend switch models that support MACsec on uplinks.

B.

You must tell implementers to disable ensure protocols such as Telnet and SNMPv1/v2.

C.

You must recommend CX 10000 Series switches.

D.

You must propose TAA accessories such as transceivers.

Buy Now
Questions 8

Waratah Hospital, located in Australia, plans to relocate many data-center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital has engaged an external consultant to help design the new data-center network.

Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The design document is summarized below.

Requirements and information:

Six racks in the data-center room (a single row).

Redundant top-of-rack leaf switches with back-to-front cooling in every rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.

Four 100 GbE uplinks per leaf switch.

The customer requested that all switch ports face the rear of the rack racks (hot aisle).

OOB management for servers, storage, and network devices must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.

Core equipment for the OOBM network is being reused.

Middle-of-row spine switches.

The data center must connect to the hospital building through links providing 400 Gbps.

Internet access is provided through an existing firewall cluster containing two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls through links totaling 100 Gbps.

The external link is a direct dark-fiber link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.

The customer also requires:

99.999% uptime for this life-critical environment.

Planned and unplanned downtime must be minimized.

Software upgrades are allowed only once per year, with close to zero downtime.

All life-critical resources are accessed locally, and all resources reside within the hospital campus.

Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.

Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.

In the past, the hospital experienced a security breach that resulted in data loss, network downtime, and identity theft.

Refer to the scenario. A junior colleague recommends deploying CX 8325-32C BF 6F 2AC Bundle switches as border leaf switches. What concern should you raise about this plan?

Options:

A.

These switches do not support sufficient power redundancy for the customer’s requirements.

B.

These switches cannot establish 4x 25 GbE links to comply with best practices for connecting to the firewalls.

C.

These switches do not meet all of the customer ' s requirements for the link to the hospital.

D.

These switches are using the wrong airflow for the customers environment.

Buy Now
Questions 9

A customer is deploying a cluster of twelve servers for AI workloads. Each server has four NVIDIA GPUs connected through NVLink. Each server supports 400 GbE connectivity on as many as six ports; however, you may recommend fewer ports. You have been asked to design a network for the servers’ backend AI interconnect.

Based on HPE Networking recommendations for this workload, how many CX 9300-32D switches should you propose?

Options:

A.

3

B.

4

C.

6

D.

12

Buy Now
Questions 10

You have delivered a CX 10000-based data-center network to a customer. The customer wants to ensure a smooth transition to the new network before beginning to implement the security capabilities.

What should you recommend for the initial deployment?

Options:

A.

Making sure that strict firewall bypass is enabled for ARP broadcasts

B.

Making sure that strict firewall mode is disabled

C.

Making sure that all VRFs have been added to PSM with an ingress policy that has no rules

D.

Making sure that all networks have been added to PSM with an egress policy that has no rules

Buy Now
Questions 11

A customer’s data center uses structured cabling based on MMF OM5. The customer plans to upgrade the spine switches in their spine-and-leaf topology. A primary objective of this upgrade is eventually to support 400GbE leaf-to-spine links. However, many leaf switches will continue to support 100GbE uplinks for some time.

What is a valid recommendation for the spine switches?

Options:

A.

CX 9300-32D switches using 400G QSFP-DD MPO-16 transceivers

B.

CX 9300-32D switches using 4x100G DR QSFP-DD transceivers

C.

CX 10040 switches using 400G QSFP-DD MPO-16 transceivers

D.

CX 10040 switches using 4x100G DR QSFP-DD transceivers

Buy Now
Questions 12

What is one advantage of using a VSX pair rather than two discrete switches to connect servers, storage, firewalls, and other workloads?

Options:

A.

You only need to configure a single routing control-plane.

B.

The setup is much easier since both switches are sharing the same configuration.

C.

Bare metal servers can be connected via MLAGs using LACP.

D.

You can save half the number of licenses needed for AFC.

Buy Now
Questions 13

When you create an endpoint group in Aruba Fabric Composer, which option should you choose in the Endpoints section to protect the hypervisor?

Options:

A.

VM Tag

B.

VNIC

C.

VM Name

D.

VM Kernel Adapter

Buy Now
Questions 14

You are implementing a spine-and-leaf architecture using 18 CX 8360-48Y6C v2 leaf switches and two CX 8325-32C spine switches. The leaf switches support servers with 10- and 25-GbE ports. You currently plan to use two 100-Gbps uplinks per leaf switch.

The customer now requires at least a 50% increase in uplink bandwidth per leaf switch. What is a valid modification to the plan?

Options:

A.

Convert both uplinks on each leaf switch (and connected spine switches) to 200 GbE links

B.

Add a third CX 8325-32C switch and connect it to each leaf switch with a 100 GbE link

C.

Add another 100 GbE link to each leaf switch. One switch in each VSX pair connects to spine 1, and one switch connects to spine 2.

D.

Add another 100 GbE link between each leaf switch and both spine switches

Buy Now
Questions 15

A long-time customer has just acquired a company and plans to bring the new data-center sites up to its standards. The customer has requested a bill of materials based only on the locations and port counts at the data-center sites.

Which valid assumptions should be documented in the proposal? Choose two.

Options:

A.

The acquired company ' s full-time staff will be converted to contractors.

B.

The acquired company’s IP schema in the existing data centers will be converted to IPv6.

C.

The project will be funded by the capital budget of the acquired company.

D.

The acquired company’s data center cooling plant allows for the back-to-front airflow preferred by your customer.

E.

The acquired company ' s data center racks are sufficient for the new equipment and will be reused.

Buy Now
Questions 16

A customer wants to turn as many upfront costs as possible into smaller recurring bills. For which components can HPE GreenLake for Networking offer recurring billing?

Options:

A.

Hardware and support, but not software

B.

Software and support, but not hardware

C.

Hardware, software, and support

D.

Hardware and software, but not support

Buy Now
Questions 17

A customer’s legacy three-tier architecture is being modernized with an L3 spine-and-leaf topology. The CX switches in the topology will supply the overlay. The customer data center has six VRFs. The customer has requested service leaf switches to connect to two clustered firewalls that route and filter traffic between the VRFs.

How can the efficiency of traffic flow between subnets in the same VRF be maximized?

Options:

A.

Use the centralized gateway model for these subnets, selecting a different centralized gateway for each VRF

B.

Within each VRF, use the distributed gateway (L3 anycast) model for most subnets but the centralized gateway design for the subnets with the highest security needs

C.

Use the firewall cluster as centralized gateways for these subnets

D.

Use the distributed gateway (L3 anycast) model for these subnets

Buy Now
Questions 18

Refer to the exhibit.

HPE7-A12 Question 18

You can change the services to save the customer money without affecting the level of support delivered. What change should you make?

Options:

A.

Selecting hardware support only FC 4h OS HW

B.

Selecting SW + TechSupp

C.

Selecting HW Onsite + SW + TechSupp FC 4h OS CDMR

Buy Now
Questions 19

Several years ago, you delivered an L3 spine-and-leaf topology to a customer. The solution used two CX 8325-32C switches as spines and 20 CX 8325-48Y8C leaf switches. The leaf switches operate as 10 VSX pairs.

The customer now wants to double the topology’s forwarding capacity. What should you recommend?

Options:

A.

Add two more 100GbE links between each leaf switch and spine switch

B.

Upgrading the existing links to 200 GbE

C.

Adding one more spine switch that connects to each leaf switch with two 100 GbE links

D.

Adding two more spine switches that connect to each leaf switches with 100 GbE links

Buy Now
Questions 20

A customer has deployed CX 10000 switches, Fabric Composer, and Pensando Policy and Services Manager (PSM). The switches are discovered in PSM, but no VRFs or networks have been added. The customer now wants to begin by applying micro-segmentation to one network. They state that they plan to add a policy containing rules that permit desired traffic from endpoints in this network. They will apply it to the network as an egress policy. At this time, they will not add any other networks to PSM or apply policies to them.

What warning should you raise to the customer about this plan?

Options:

A.

The customer should apply the egress policy at both the VRF and network level to ensure that it works properly.

B.

The customer must enable strict firewall mode before applying policies to ensure they take effect.

C.

An ingress policy not egress policy, is the correct direction for controlling traffic from endpoints.

D.

When you apply a policy to one network, it is recommended to add all the networks in its VRF to PSM.

Buy Now
Questions 21

Which information is likely to appear in the device-inventory deliverables? Choose two.

Options:

A.

RMA instructions

B.

migration Gantt charts

C.

device IP address

D.

device name

Buy Now
Exam Code: HPE7-A12
Exam Name: HPE Network Data Center Professional Architect Exam
Last Update: Nov 21, 2026
Questions: 70

PDF + Testing Engine

$42.5  $169.99

Testing Engine

$32.5  $129.99
buy now HPE7-A12 testing engine

PDF (Q&A)

$27.5  $109.99
buy now HPE7-A12 pdf
dumpsmate guaranteed to pass

24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 22 Nov 2026