Big Halloween Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

TM3 ISTQB Certified Tester Advanced Level - Test Management v3.0 Questions and Answers

Questions 4

You are currently leading an independent test team. Based on the information given in the scenario, identify how the team could be improved most effectively.

Options:

A.

By providing training in the payroll domain

B.

By providing a workshop on test design techniques

C.

By providing specific training on the systems being tested

D.

By providing training on reviewing requirements

Buy Now
Questions 5

You are a test manager developing a master test plan. As part of the master test plan, you are defining exit criteria for the various test levels.

Which of the following exit criteria would be most appropriate and SMART for component testing, and which one would be most appropriate and SMART for system testing?

i. 95% of the tests prepared are executed successfully

ii. All test cases have been run

iii. 80% decision coverage for all tests run

iv. At least 30 defects have been found

v. At least two weeks of test execution

vi. No more open defects

Options:

A.

iii for component testing, v for system testing

B.

ii for component testing, iv for system testing

C.

iii for component testing, i for system testing

D.

v for component testing, vi for system testing

Buy Now
Questions 6

Which of the following is not something you should do when performing a Belbin assessment with an Agile team?

Options:

A.

Team members use a self-assessment questionnaire to identify their own strengths and weaknesses in relation to nine Belbin roles.

B.

Feedback is provided to the individual team members by another team member using the observer assessment questionnaire.

C.

The team member roles should be balanced with the Belbin team roles model to identify any missing or overrepresented roles and adjust accordingly.

D.

The team should not align the team's roles with the team's goals and expectations. These should be kept independent.

Buy Now
Questions 7

Which of the following activities in the test process is considered to deliver a document which can be used as a major input for test process improvement?

Options:

A.

Test Planning

B.

Test Monitoring

C.

Test Execution

D.

Test Completion

Buy Now
Questions 8

Analytical test improvement approaches identify problems based on data from the project or team. Appropriate improvements can be derived from an analysis of the identified set of problems.

Which of the following is not an example of an analytical-based test process improvement approach?

Options:

A.

Root cause analysis

B.

Quantitative TPI NEXT assessment

C.

Analysis using measures, metrics and indicators

D.

The Goal Question Metric (GQM) approach

Buy Now
Questions 9

In multi-team environments with hybrid software development approaches, there are various challenges in the context of defect management, such as:

i. Alignment of defect attributes to be used

ii. Prioritisation of defects

iii. Alignment of the approach for defect fixes

Solutions to the above-mentioned challenges include:

Options:

A.

The product owner should be involved in the defect management meetings

B.

Synchronisation between the defect management tools

C.

Transparency of plans by sharing them between teams via dashboardsWhich solution is related to which challenge?

D.

A = i, B = ii, C = iii

E.

A = i, B = iii, C = ii

F.

A = ii, B = i, C = iii

G.

A = i, B = ii, C = i

Buy Now
Questions 10

You are a process improver and have decided to use the data from the defect management system to identify and drive improvement actions… Which of the following options could have been identified as missing from the defect reports to be used for process improvement?

Options:

A.

Steps to reproduce the failure, along with the actual and expected results

B.

The priority to fix the problem

C.

The status of the defect

D.

The software lifecycle phase in which the defect was detected

Buy Now
Questions 11

A company that sells an established capture–replay execution tool is adding a test management tool. Same team, same technology, incremental development (V-model per increment), known first-year features; later features driven by customer demand.

Which two of the following factors are most likely to influence the estimation technique that would be selected in this scenario?

Options:

A.

Estimation error

B.

Data availability

C.

Expert availability

D.

Knowledge in modelling

E.

Time constraints

Buy Now
Questions 12

Which one of the following metrics is primarily used to measure the achievement of a test objective and reported in a test completion report?

Options:

A.

Code coverage

B.

Actual versus planned estimation (in hours) for testing activities

C.

Accumulated number of resolved defects versus accumulated number of defects

D.

Number of automated test cases versus planned automated test cases

Buy Now
Questions 13

A project has been running for a few months and the team does not seem to be making progress in their test approach. The team also lacks drive and enthusiasm and is sometimes seen to be performing their tasks too slowly. You have been asked to recruit an extra person into the team. In addition to introducing the new team member, you have decided to raise motivation.

Which of the actions listed below would most likely result in the opposite, a de-motivation of the team?

Options:

A.

Criticising testers only in private when they made a mistake during their test activities.

B.

Constantly prescribing overtime to the testers so that they will be accustomed to perform extra hours when necessary.

C.

Providing adequate rewards to the testers when they have done an outstanding job.

D.

Organising a meeting with senior management in which senior management addresses the importance of good testing for this project.

Buy Now
Questions 14

Factors that are important to take into account when performing test estimation include:

i. The quality of the test basis

ii. The availability of test automation

iii. The amount of rework required

iv. The distribution of testing across several locations

The various factors can be grouped by characteristic. Examples of characteristics include:

Options:

A.

Test context

B.

Test results

C.

Product

D.

Development processWhich factor is related to which characteristic?

E.

A = i, B = ii, C = iii, D = iv

F.

A = iv, B = iii, C = i, D = ii

G.

A = iv, B = iii, C = ii, D = i

Buy Now
Questions 15

To which category of cost of quality does "fixing a defect found during testing" belong?

Options:

A.

Defect prevention costs

B.

Appraisal costs

C.

Internal failure costs

D.

External failure costs

Buy Now
Exam Code: TM3
Exam Name: ISTQB Certified Tester Advanced Level - Test Management v3.0
Last Update: Nov 2, 2025
Questions: 51

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now TM3 testing engine

PDF (Q&A)

$31.5  $104.99
buy now TM3 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 02 Nov 2025